Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development Status of Thin, Spray-on Liners for Mining and Civil Engineering ApplicationsBy James F. Archibald
Research has been conducted for the Workplace Safety and Insurance Board of Ontario (WSIB) to characterize thin, spray-on lining materials (TSLs), as well as combinations of TSLs and conventional spra
May 1, 2006
-
Development Strategy of the Trident Underground Gold MineAvoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas
Jan 1, 2008
-
Development System for Blockcaving Under Severe ConditionsBy Peter F. Weiss
INTRODUCTION Austro-American Magnesite Co. of Radenthein, Carinthia, Austria, is a wholly owned subsidiary of General Refractories Company, Bala Cynwyd, USA, and has been incorporated since 1908.
Jan 1, 1981
-
Development work continues for open-pit mining at Red DogBy S. Hodgson
Introduction The Red Dog zinc/lead deposit in northwest Alaska is the second largest zinc deposit ever discovered. Being developed by Cominco Alaska, with startup scheduled for early 1990, it will ul
Jan 12, 1988
-
Development Work with Trackless EquiprnentBy Elmer A. Jones
Development work in mines of St. Joseph Lead Co., Southeast Missouri, using trackless loading equipment shows definite advantages: Speed of cleaning, ability to work on steep grades and sharp crosscut
Jan 6, 1950
-
Development – Back to BasicsBy I T. Ross
In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic
Mar 24, 2014
-
Development, Design, and Installation of Climax's Tin Upgrading CircuitBy R. M. Rowe, T. E. Irwin
A flowsheet was developed for upgrading Climax tin concentrate to about 45 percent Sn. Bench-scale test work conducted at AMAX Extractive Research and Development, Inc., was used to design a multiple-
Jan 1, 1986
-
Development, Installation, and Effect of an Underground Crushing and Conveying System at Pea RidgeBy J. C. Irvine
Meramec Mining Co. has put into operation a crushing and conveying system on its newly established 2475-ft level, 200 ft below the lowest production. To develop this level without interrupting hoistin
Jan 1, 1973
-
Development, Installation, and Operation of a Full-Copper, Deep-Cooled Slag Tapblock for a Six-in-Line Copper Matte Settling Electric FurnaceBy T. Mwanza, B. N. Belford, P. Conradie
"Metix has introduced a three-piece ’deep-cooled’ copper slag tapblock into a six in-line copper matte settling electric furnace. The tapblock was designed without any internal refractory; it relies p
Jun 1, 2019
-
Development, Performance, And Application Of High Capacity Portable Bulkspray Coolers At Mt. Taylor MineBy Romeo S. Jurani
Bulkspray cooling has been economically applied in cooling the hot environment of South African gold mines for the past two decades. Its success in that country led to its introduction at Gulf Mineral
Jan 1, 1983
-
Development, Testing and Applications of an Induction-Balance Sensor for Low-Grade Nickel OresBy D. J. Houlahan
ABSTRACT Sorting has the potential to massively improve the pro?tability of mining base metal, hard-rock ores. However, several barriers to the increased application of sorting have been identi?ed, in
Jan 1, 2010
-
Development, Trials, and Testing of a Two-Component, Rapid-Set Cement Grouting SystemBy Stephen C. Tadolini, Robert Hawker, Peter Mills, Colin Grubb, Tom Meikle
"In unfavorable strata conditions, it is often necessary to install additional long tendon support as part of a primary support cycle. Although these support systems provide the required additional st
Jan 1, 2017
-
Development, Validation, And Use Of An Event-Oriented Haul-Cycle Simulation ProgramBy William C. Dixon
Since the mid 60's, several haul cycle simulation programs have been developed. However, most of these programs are believed to employ the continuous, rather than the discrete, event-oriented sim
Jan 1, 1978
-
Developmental Practices Operating at North Broken Hill Limited, Broken Hill, N.S.W.This paper is an outline of the developmental practices now in use at North Broken Hill Limited, N.S.W. The description will be given under the following headings.I. General.......opening up of a new
Jan 1, 1944
-
Developments and Future Benefits of Long-Hole Directional Drilling in New ZealandBy B B. Beamish
Long-hole directional drilling for in-seam exploration was introduced to New Zealand at Huntly West Mine in 1989. Following the success of this initial drilling program the Coal Corporation of New Zea
Jan 1, 1993
-
Developments and New Applications for Biogenic Sulphide Reagent in Hydrometallurgy and Mineral ProcessingBy R. W. Lawrence
"In the past year, BioteQ Environmental Technologies Inc. have initiated design and construction of new plants to add to an existing list of plants that utilize the BioSulphide® and ChemSulphide™ proc
Jan 1, 2007
-
Developments at the Rosebery Concentrator of the Electrolytic Zinc Co. of Australasia Ltd.Previous published papers by Fraser (1), Hey (2), and Stillwell (3), have given respectively, details of:-1. The practice in the pilot plant operated at Zeehan for the treatment of ores from the Roseb
Jan 1, 1949
-
Developments For Mitigating Measures From Deep Shafts Of North/South-Line AmsterdamBy Klaus Pöllath
This paper describes mitigating measures and the design of compensation grouting which will be executed from deep shafts of the Amsterdam North/South Metro line project. Due to the specific conditions
Jan 1, 2006
-
Developments in Aircraft Materials and ProcessesBy Paul E. Lamoureux
Introduction The Author As the pail of smoke and wartime destruction gradually rises from the surface of the earth, from all countries, statesmen assemble to discuss and prepare pacts and treaties
Jan 1, 1947
-
Developments in at-Face/in-Pit Processing TechnologiesBy Martin Stoklossa
Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho
May 1, 2008