Design and Evaluation of the Roof Bolt Corrosion Test Systemin a Simulated Underground Coal Mine Environment Mining, Metallurgy and ExplorationBy Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat
Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst
-
Design And Experience Of Total Extraction Room And Pillar Operations Above Depleted Longwall PanelsBy Kenneth Rigsby
Black Mountain Resources' Highlands Mine No. I is a full extraction room and pillar operation located in Harlan County, Kentucky. Black Mountain extracts the 0.9 to 1.1 meter (36- to 42-inch) thi
Jan 1, 2003
-
Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water TanksBy Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers
Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as
Oct 1, 2022
-
Design and Field Implementation of Alternate Stable Mining Geometries for Set-Up Rooms in Longwall MiningBy Yoginder P. Chugh
This paper discusses an ongoing field study in southern Illinois (USA) that focuses on: 1) Identifying mechanisms of instability in the set-up rooms (SR) and their T-junctions with headgate and tailga
Aug 1, 2013
-
Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, BrisbaneBy Baxter D. A
This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r
Jan 1, 1993
-
Design And Hazard Assessment Of Mine Ore PassesBy M. J. Beus
This paper will describe the research approach being initiated by the Spokane Research Center to assess hazards and design criteria to prevent ground and muck falls in and around ore passes in hard-ro
Jan 1, 1996
-
Design and Implementation of a Brownfield Sag Pre-Crush CircuitBy G. Castillo, G. Thies, C. Bissue
"Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond
Jan 1, 2013
-
Design And Implementation Of A Multimodal Transportation Cost Analysis Model For Domestic Lignite Supply In Turkey ? SynopsisBy E. Demir
Transportation cost is the dominant cost and accounts for almost half of the total mining cost in surface mining. Therefore, determining transportation cost is critically important for the economic fe
Jan 1, 2012
-
Design and implementation of a process control system for column flotationBy A. LA. Salama, D. B. Hyma
"The Western Research Centre (WRC) of CANMET located in Devon, Alberta, is a modern research facility offering services ranging from fundamental research to pilot plant investigations. Recently, a 0.
Jan 1, 1993
-
Design and Implementation of a Supplemental Atomizing Spray System for Dust Control in Deep Cut Continuous MiningBy J. Dilbeck, J. K. Ratliff, T. Petrov, Z. Brown
"In efforts to improve dust control during deep cut continuous mining a supplemental atomizing spray system, mounted on 14CM15 continuous miner, has been designed and successfully implemented in a U.S
Jan 1, 2019
-
Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG MillBy Rodrigo Toro, Ivan Yutronic N
"The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s
Jan 1, 2010
-
Design and Implementation of Belt Conveyor Take-Up Safety Device Systems - SME Annual Meeting 2026By C. H. Stephenson, M. Du Preez
Overland belt conveyors often use vertically guided counterweight take-ups or horizontally tensioned carriages to maintain belt tension. In the event of belt or wire rope failure, these systems can re
Feb 22, 2026
-
Design and Implementation of Modified Mo Addition to EAF at Uddeholm AB, SwedenBy M. Nzotta, L. Teng, S. Seetharaman, A. Chychko
The objective of the present work is to optimize the EAF practice towards Mo alloying with maximum retention of the alloying element in molten steel. During Mo additions, there were significant losses
Jan 1, 2011
-
Design and Implementation of Solar‑Powered Optical Fiber‑Based Illumination and Communication System for Underground Coal Mines - Mining, Metallurgy & Exploration (2023)By Dushasan Kundu, B. N. Shivakiran Bhaktha, Khanindra Pathak, Sarbojit Mukherjee
Mine safety and quality of life of miner working in underground mines depend to a large extent on mine illumination and communication. The provisioning of reliable, safe, and cost-effective illuminati
Apr 14, 2023
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River GorgeBy Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Design And Installation Of A 1818 Tonnes, 273 Meter Lift, Vertical Conveying System At White County Coal Pattiki 2 Mine, Carmi IllinoisBy S. Crewdson
Vertical hoisting of materials using hoists and skips is common in the Mining Industry. These systems have a number of drawbacks, one being limited hoisting capacity at medium depths. FKC-Lake S
Jan 1, 2003
-
Design and Installation of Gudrun Platform Jacket PilesBy Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr
"Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall
Jan 1, 2014
-
Design and Installation of Helical Piles for Support of Bridge Pier FoundationBy David L. Borusiewicz, M. Suri Surendra
"Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc
Jan 1, 2014
-
Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter SewerBy Naresh Koirala
The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft
Jan 1, 2004
-
Design And Instrumentation Of A Large Reverberation ChamberBy Roy C. Bartholomae, Jeffrey Shawn Peterson
1. INTRODUCTION In the early 1980s, the U.S. Department of the Interior’s Bureau of Mines Pittsburgh Research Center required that a large reverberation acoustic facility be constructed. This faci