  • DFI
    Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro Clay

    By Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong

    "Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al

    Jan 1, 2017

  • SME
    Design and Construction of Dulles Airport Tunnels

    By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field

    With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn

    Jan 1, 2007

  • SME
    Design And Construction Of Earth Bottom Thickeners

    By Edward S. Hsia

    Pluor Utah has been closely associated with the engineering and construction of earth bottom thickeners for porphyry copper operations, for the counter-current decantation circuit of a gold cyanide pl

    Jan 1, 1977

  • SME
    Design And Construction of Emergency Pedestrian Egress Tunnels, Essex Junction, Vermont

    By Bradford F. Townsend, Robin B. Dill, Richard M. Croswell

    Innovative geotechnical construction techniques were used to construct three pedestrian tunnels under a building slab-on-grade to allow utilization of basement space for manufacturing. Tunnels were co

    Jan 1, 1993

  • SME
    Design and Construction of EPB Tunnels Within an Artesian Groundwater Aquifer - Addressing Environmental Issues

    By Adrian Coombs

    The York Durham Sewage System (YDSS) Interceptor Tunnel Project is located in the Town of Richmond Hill, Ontario, Canada, just north of Toronto. Construction commenced in September 2006 and completion

    Jan 1, 2008

  • CIM
    Design and Construction of Hydrostatic Mine Shaft Liners Using Cast Iron Tubbing Technology

    By J. Ouellet

    The design of hydrostatic liner for a deep potash mine shaft in Saskatchewan poses tremendous technological challenges. Technology has evolved to a point where one could consider a new innovative appr

    Aug 1, 2013

  • DFI
    Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury Bridge

    By Frederick C. Rhyner

    Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw

    Jan 1, 2004

  • SME
    Design And Construction Of Lake Mead Intake No. 3 Shafts And Tunnel

    By Jon Hurt

    INTRODUCTION The entire scope of new facilities for Lake Mead Intake No. 3 includes a sub-merged intake structure, a deep tunnel beneath Lake Mead, a tunnel access shaft, Intake Pumping Station No. 3

  • DFI
    Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich Bridge

    By Andrew Peterson

    The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi

    Jan 1, 1999

  • SME
    Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021

    By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler

    This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under

    Jun 13, 2021

  • SME
    Design And Construction Of Minghu Power Cavern

    By C. Y. Kao, Roger Y. Cheng, C. S. Hsieh

    The mushroom-shaped Minghu power cavern located in central Taiwan is 21.2 m (W) by 40.5 m (H) by 127.2 m (L) and is designed to house 4 units of power generating-pumping equipment with a total capacit

    Jan 1, 1983

  • DFI
    Design and Construction of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste

    An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D

    Jan 1, 2019

  • SME
    Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022

    By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent

    The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit

    Dec 1, 2022

  • SME
    Design And Construction Of Norad Expansion Project "Excavation Phase"

    By Gerald G. Griswold, Allan G. Provost

    INTRODUCTION The Norad Expansion Project was located 10 miles southwest of Colorado Springs, Colorado, within Cheyenne Mountain. The expansion areas to be excavated would be adjacent to the existin

    Jan 1, 1979

  • DFI
    Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling Method

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.

    Jan 1, 2019

  • SME
    Design and Construction of REM Tunnels and Underground Structures - RETC2023

    By Verya Nasri, Agustin Rey

    Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill

    Jun 13, 2023

  • CIM
    Design and Construction of Tailings Dams (ENVIRONMENTAL CONTROL )

    By Earle J. Klohn

    "The design, construction and operation of tailings dams is rapidly becoming a major consideration for most new mining developments, as well as for many existing operations. In North America, under pr

    Jan 1, 1972

  • SME
    Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project

    By J. Chae, D. Pecha, R. Andrews

    The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro

    Jan 1, 2005

  • SME
    Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel

    By Russel Delmar

    Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope

    Jan 1, 2008

  • DFI
    Design And Construction Of The Deep Stations For The Copenhagen Metro - Synopsis

    By David R. Beadman

    This paper discusses how modern techniques of design and construction were used to create the deep stations for the Copenhagen Metro. The deep stations are located in small squares within the city adj

    Jan 1, 2000