Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Buffalo Paper - The Life-History of NiagaraBy Julius Pohlman
The history of Niagara Falls, as currently told, is simple, and by that very simplicity it has been rendered plausible. AS the story runs, the Falls were once situated at Lewiston, 7 miles to the nort
Jan 1, 1889
-
Buffalo Paper - The New Dressing-Works of the St. Joseph Lead Company at Bonne Terre, MissouriBy H. S. Munroe
The dressing-works of the St. Joseph Lead Company were destroyed by fire, February 26th, 1883. Within about four months, or on July 5th, 1883, the new mill, with a capacity of 500 tons per day, was bu
Jan 1, 1889
-
Buffalo Paper - The Relations Between the Chemical Constitution and the Physical Character of Steel (Discussion, 876)By William R. Webster
This is a subject which our Institute has made peculiarly its own. In the first volume of its Transactions the analysis of steel received attention, and every subsequent volume has borne witness to th
Jan 1, 1899
-
Buffalo Paper - The Silicon-Control of Carbon in Cast-IronBy F. E. Bachman
Although it has been apparent to me for a long time that too great weight was currently given to the silicon-contents of foundry-iron, and that the theory of the control by silicon of the carbon-conte
Jan 1, 1899
-
Buick Concentrator Process Control Development ? IntroductionBy Robert D. Deister
The Buick Concentrator represents state-of- the-art technology in automated digital process control operation utilizing a centralized computer. The process control strategies implemented at Buick are
Jan 1, 1985
-
Building a Cloud-Based Operator Training Simulation Software for Pressure Oxidation ProcessBy Mikko Loponen
Outotec has developed an operator training simulator (OTS) platformsuitable for various hydrometallurgical processes. The complete solution is run in the cloud, where virtual client instances can be m
-
Building A Database For The Prediction Of Phases In Pt-Based SuperalloysBy L. A. Cornish, S. N. Prins, R. Süss
The work is being done using the Thermo-CalcTM software, and the database is being built up by obtaining good thermodynamic descriptions of all of the possible phases in the system. The database suppl
Jan 1, 2006
-
Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern PeruBy R Baumgartner
The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic
Sep 5, 2011
-
Building A High-Rise Adjacent To Transit Tunnels In San FranciscoBy Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Building a Sustainability Strategy into a Consumer Products BusinessBy Leon H. Bruner
This paper presents a case study describing how a global consumer products company with 138,000 employees that markets over 300 brands in 180 countries is building sustainability into the rhythm of it
Jan 1, 2010
-
Building a University and Center For Energy in Sumatra, IndonesiaBy Tony Szwilski
Indonesia has enormous mineral resources. Its population of more than 180 million people inhabit most of the more than 13,000 islands. The country is becoming a significant economic power in Southeast
Jan 1, 1991
-
Building Above And Excavating Below An Iconic Building In ManhattanBy John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta
The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical
-
Building An Intelligent Mining System – Morenci’s ApproachBy J. A. Flinn
Phelps Dodge’s Morenci copper mine has had six drills, six track-dozers, 16 shovels, two loaders, and 90 haul trucks equipped with either Caterpillar, Aquila, or Modular GPS systems for nearly three y
Jan 1, 2000
-
Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic DamBy I Thin, L Morizzi, C Seymour, G Mungur
Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,
May 9, 2016
-
Building AsiaÆs Latest Hard Rock MineBy T J. V Duffy, L H. D Siahaan, P G. Albert
G-ResourcesÆ Martabe Mine in North Sumatra, Indonesia, is a US$700 M world-class and world-scale operation in a country which, with a few notable smaller scale exceptions, has had no significant hard
Nov 20, 2012
-
Building Better Haul Roads: Designing For Structural StrengthThe structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo
Jan 1, 2011
-
Building Blocks Of Industry - Industrial Minerals In 1968 - AsbestosBy Paul A. Filteau
Asbestos ranks among the leading minerals produced in Canada. It is also mined in Russia, Rhodesia, South Africa, Cyprus, Italy, the U.S.A., Japan, China and several other countries. The most abundant
Jan 1, 1969
-
Building Confidence In Assays (d8c1597e-80a0-48c3-a2e6-7c4852121ba6)By L. Bloom
In 1996, lack of confidence in assaying methods and sample handling affected companies as diverse as Bre-X and Timbuktu. Both share prices and the ability to raise financing are impacted when the qual
Jan 1, 1997
-
Building from the ground up in the Sahara The complexities of project execution in a developing countryBy Olivia Gamache
When working in remote and extreme environments, projects are faced with new challenges for engineering and project execution. This is heightened when also working in countries with a developing env
May 1, 2013