Search Documents

Sort by

  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008

  • IMPC
    Pilot Applications of Column Flotation on Copper Re-Cleaning

    By Olgac Kangal, Ali Guney, Gulay Bulut, Guven Onal, Ayhan A. Sirkeci

    This paper presents the results of pilot scale column flotation applications in the two different copper concentrators in Turkey. The Kure Copper Plant is located in the Black Sea Region of Turkey. In

    Jan 1, 2003

  • IMPC
    Pilot Dense Medium Separation of Hematite Fines

    By T. Moloane, C. Bergman, Heloise Thiele

    "A pilot test campaign was undertaken to evaluate dense medium cyclone separation efficiencies on samples of iron ore fines (-1mm +300µm). Evaluations were done using both gas and water atomised FeSi

    Jan 1, 2018

  • IMMS
    Pilot Mining Robot for Polymetallic Nodules and Pre-Pilot Mining Tests

    By Sup Hong

    A pilot mining robot, named MineRo-II, has been developed by KIOST during 2011-2012. The pilot scale was defined as 1/5 of the commercial mining capacity, 1.5 million dry-tons of nodules per year. The

    Sep 14, 2011

  • TMS
    Pilot Plant Commissioning and Operations for Copper Sulfide In Situ Indirect Bioleaching

    By Theodore Ineich

    The “BIOMOre” project aims to prove the technical feasibility of indirect in situ bioleaching of sulfide minerals contained in a deep underground deposit, by bringing together the disciplines required

  • CIM
    Pilot Plant Demonstration of the Mintek Thermal Magnesium Process

    By M. Abdellatif

    Successful demonstration of The Mintek Thermal Magnesium Process (MTMP) was achieved in November 2004 at the pilot-scale, About 30 tons of magnesium producing recipe was smelted in the DC arc furnace

    Jan 1, 2006

  • SME
    Pilot Plant Demonstration Of The Platsol Process For The Treatment Of The NorthMet Copper-Nickel-PGM Deposit

    PolyMet Mining is developing the NorthMet property near Duluth, MN. Laboratory investigations have led to the development of the Platsol process to dissolve in one step the base metals (copper and nic

    Jan 1, 2003

  • SME
    Pilot Plant Demonstration Of The Platsol® Process For The Treatment Of The Northmet Copper-Nickel - PGM Deposit (2b88692d-3bac-4547-86c3-f3ee9071956d)

    PolyMet Mining is developing the NorthMet property near Duluth, Minnesota. Laboratory investigations had led to the development of the PLATSOL process to dissolve in one step the base metals (copper

    Jan 1, 2001

  • CIM
    Pilot Plant Development Studies on Mount Laurier, Canada, Graphite Deposit

    By V. Lakshmanan, Dan Mackie, J. Melnbardis

    "Crystalline Flake Graphite is a strategic mineral. Since 1954 nearly all North American consumption has been imported from offshore. The Bouthillier Project in Quebec, Canada, is Orrwell Energy's bid

    Jan 1, 1984

  • CIM
    Pilot Plant Evaluation of a Hybrid Biological Leaching-Pressure Oxidation Process for Auriferous Arsenopyrite/Pyrite Feedstocks

    By I. Dymov, W. Phillips

    A process has been evaluated, on a continuous pilot plant scale, to treat refractory gold arsenopyrite/pyrite concentrates. The process consisted of biological leaching to partially oxidise sulphides,

    Jan 1, 2004

  • ABM
    Pilot Plant Experience Using Stamped Charging Of Peruvian And Imported Coal Blends

    By Jorge Madias

    A Aceros Arequipa é a maior siderúrgica do Peru. A empresa opera uma planta em Pisco, com uma aciaria para 850.000 t anuais de aço líquido, e uma capacidade de laminação de 1.250.000 t anuais de produ

    Oct 30, 2017

  • CIM
    Pilot Plant Filtration of Zinc Suspension Roaster Gases Through Glass Fabric

    By R. E. Eyre, L. P. Landucci

    C URRENT practice in the zinc concentrate roasting plant of The Consolidated Mining arid Smelting Company of Canada Limited, at Trail, B.C., involves passing the furnace effluent gases through an elec

    Jan 1, 1962

  • CIM
    Pilot Plant Investigations on Cold Water of Bitumen from Alberta Bituminous Separation Sands

    By L. E. Djingheuzian

    Introduction For many years the immense deposits of bituminous sands of northern Alberta have been attracting the attention of our governments, engineers and .scientists ( 6). Undoubtedly these bitum

    Jan 1, 1952

  • SME
    Pilot Plant Operation On Gamsberg Manganiferous Zinc Concentrates

    By Marcel F. DeGuire

    Pilot plant operations are described for the treatment of manganiferous zinc concentrates from the Gamsberg ore deposit in South Africa via conventional electrolytic zinc processing. Two methods were

    Jan 1, 1978

  • CIM
    Pilot Plant Pressure Oxidation of a Refractory Gold-Silver Concentrate

    By D. Yuan, L. Yan, M. J. Collins, P. Kalanchey, I. M. Masters

    ABSTRACT Pressure oxidation tests have been conducted by Sherritt for a refractory gold-silver project in China. The feed contained 39 g/t Au and 970 g/t Ag; the major gold-bearing minerals were pyrit

    Jan 1, 2013

  • CIM
    Pilot Plant Pressure Oxidation of Refractory Gold-Silver Concentrate

    By D. Yuan, L. Yan, R. Kalanchey, M. J. Collins, I. M. Masters

    Pressure oxidation tests have been conducted by Sherritt for a refractory gold-silver project located in China. The feed contained 39 g/t Au and 970 g/t Ag; the major gold-bearing minerals were pyrite

    Jan 1, 2011

  • CIM
    Pilot Plant Pressure Oxidation of Refractory Gold-Silver Concentrate from Eldorado Gold Corporation’s Certej Project in Romania

    By J. Stiksma, J. Dennett, R. Kalanchey, J. Ji, M. Collins, T. Chan, R. Berezowsky

    A pilot plant campaign has been conducted by Sherritt Technologies in support of Eldorado Gold Corporation’s evaluation of pressure oxidation technology for the treatment of refractory gold concentrat

    Jan 1, 2014

  • TMS
    Pilot Plant Production Of Prime Western Grade Zinc From Lead Blast Furnace Slags Using The Enviroplas Process

    By Albert F. S. Seboukens

    A 5;6 MVA pyrometallurgical demonstration-scale pilot plant was commissioned at Mintek, South Africa, in 1994, using lead blast-furnace slag and coke as raw materials. The plant included a.d.c. power.

    Jan 1, 1995

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • AUSIMM
    Pilot Plant Testing in Mineral Process Plant Design

    By Dunlop GA

    Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t

    Jan 1, 1990