Search Documents

Sort by

  • SME
    Optimizing Conditions For Wet Grinding Of Synthetic Rutile Using Response Surface Methodology

    In this paper, response surface methodology was applied to optimize the experimental conditions for the wet grinding of synthetic rutile. The effects of parameters such as rotation speed, solids conce

    Jan 1, 2011

  • SAIMM
    Optimizing control for a two-stage grinding circuit, O. Haavisto, M. Olofsson, J. Martikainen, S. Kauvosaari, and M. Kosonen

    By S. Kauvosaari, M. Olofsson, O. Haavisto, M. Kosonen, J. Martikainen

    The target in grinding circuit operation is usually to maximise the throughput and energy efficiency while keeping the product particle size on an optimal level for downstream operations. Furthermore,

    Jan 1, 2020

  • ISEE
    Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.

    By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy

    Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush

    Jan 21, 2025

  • SME-ICGCM
    Optimizing Drilling Parameters for Improved Bolting Safety and Performance

    By Darin Cotton, Tim Burgess, Tim Martin

    "As the leading US supplier of roof control drills, J. H. Fletcher and Company® has encountered an extensive set of roof strata challenges and has overcome various drilling issues by varying machine p

    Jan 1, 2015

  • AUSIMM
    Optimizing Exploratory Drill Hole Locations

    By Baafi EY, Chatterjee PK

    The quality of mine planning decisions ultimately depends on reliable estimates of the characteristics of the orebody. The quant- ifiable factors such as grades or thickness can be estimated from f

    Jan 1, 1986

  • SME
    Optimizing Grinding And Regrinding Capacity In Mill Design

    By Robert J. Brison

    The intent of this paper is to try to answer the complex question: "How much grinding capacity should be designed into a new mining - milling project?" Much work has been devoted to the technical a

    Jan 1, 1972

  • CIM
    Optimizing Grinding Circuits

    By James Anstey

    BHP Billiton?s Cannington facility is a mining and minerals processing plant near Mt. Isa in Central Queensland, Australia, producing silver, lead and zinc. Mine ore is processed in a concentrator, wh

    Apr 1, 2005

  • SME
    Optimizing Influences In The Selection of Grinding Mill Technology

    By G. Duncan, K. Winther, R. Ericsson

    Distinct trends in grinding mill technology have emerged in recent years. In an effort to optimize overall mill performance for the needs of the End User, broad measures of logistical speed, process f

    Jan 1, 1999

  • SME
    Optimizing Influences In The Selection Of Grinding Mill Technology (1eff67d4-86c2-4c1e-8c2c-994df0e09c59)

    By G. Duncan

    Distinct trends in grinding mill technology have emerged in recent years. In an effort to optimize overall mill performance for the needs of the End User, broad measures of logistical speed, process f

    Jan 1, 1999

  • TMS
    Optimizing Iron Ore Matching for Sintering Based on High Temperature Characteristic Numbers

    By Wen-long Zhan, Chun-en Zhu, Xiao-dong Du, Yong Zhao, Keng Wu

    In view of the traditional evaluation index of sintering basic character- istics ignoring process information, several high temperature characteristic num- bers, which contain process information, wer

    Mar 1, 2018

  • IMPC
    Optimizing Knelson Concentrator Performance in Gravity Gold Circuits

    By G. K. Nimal Subasinghe

    The performance of Knelson Concentrators (KC) used in gravity gold circuits often rely on manufacturers recommendations for selecting operating parameters such as, fluidising water flow rate and cycle

    Jan 1, 2014

  • IMPC
    Optimizing Knelson Concentrator Performance in Gravity Gold Circuits (78636aa8-a60c-4206-9445-adb357c592c5)

    By G. K. Nimal Subasinghe

    The performance of Knelson Concentrators (KC) used in gravity gold circuits often rely on manufacturers recommendations for selecting operating parameters such as, fluidising water flow rate and cycle

    Jan 1, 2014

  • SAIMM
    Optimizing LHD Utilization ? Synopsis

    By D. Mkhwanazi

    The purpose of the project was to optimize load haul dump (LHD) machinery use as they were spending too much time doing what they should not be doing. During the investigation, the author found that t

    Jan 1, 2011

  • SAIMM
    Optimizing Manganese Ore Sinter Plants: Process Parameters And Design Implications

    By W. Barthel, B. A. Dippenaar, J. Malan

    In its most basic form, the process of sintering is very simple, and has been in use since the turn of the previous century. However, while the basic process is simple, control of

    Jan 1, 2004

  • ISEE
    Optimizing Non-ideal Blasting for Ideal Grinding

    By Jack Eloranta

    The winning of metals often requires fine grinding of very hard ore. The US Bureau of mines measured compressive strengths exceeding 100,000 PSI (700 MPa) in Minnesota taconites. Grinding down to 300

    Jan 1, 2013

  • SAIMM
    Optimizing of gas-shielded metal arc welding parameters for 10.5-12.5% chromium steel using 308L electrodes

    By J. W. van der Merwe, A. M. Maleka, V. J. Matjeke

    The 10.5–12.5% chromium, titanium-stabilized ferritic stainless steel (FSS) plates used to fabricate coal line jumbo wagons is susceptible to undesirable chromium depletion during welding with 309L el

    Apr 5, 2023

  • IMPC
    Optimizing of Roller Press Forming Cavity Profile Using Finite Element Simulation

    By R. T. Dec

    Current industrial compacting and briquetting practices are largely based on trial-and-error techniques. This paper introduces a two-dimensional finite element model of briquetting process in the roll

    Jan 1, 2014

  • CIM
    Optimizing Performance at the David Bell Mine Concentrator

    By K. Meyer

    "The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den

    Jan 1, 1991

  • CIM
    Optimizing Performance in Heavy Equipment Teleoperation

    By Jean-François Lapointe

    Many advances have been made concerning the automation of heavy equipment teleoperators such as those found in mining. Complete automation, however, is not achieved yet and the operation of these vehi

    May 1, 2001

  • CIM
    Optimizing performance of AG/SAG mills – A design approach

    By Sanjeeva Latchireddi, Travis Orser

    "Today’s high capacity semiautogenous grinding (SAG) mills expend vast amounts of energy and in doing so consume tons of shell liners and steel balls, while processing ore. The energy efficiency of th

    Jan 1, 2005