Search Documents

Sort by

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • SAIMM
    Optimization of shuttle car utilization atan underground coal mine

    By P. R. Segopolo

    "The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc

    Jan 1, 2015

  • IMPC
    Optimization Of Simultaneous Leaching Of Gold And Silver From A Refractory Gold Ore

    By M. Saba

    In cyanide leaching procedure, achieving an acceptable efficiency for silver and gold is very time-consuming, thus, enough studies have not been performed for optimization and modeling of this process

    Sep 1, 2012

  • SME
    Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was

  • SME
    Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration (e0c562d4-30bd-4458-b8cb-8e6a1cd409aa)

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was

  • TMS
    Optimization Of The Asarco East Helena Water Treatment Plant For Removing Arsenic And Metals

    By Douglas K. Modrow

    In the fall of 1993, construction was completed on a state of the art industrial waste water treatment plant at Asarco's East Helena Lead Smelter. Purpose of the plant was to remove arsenic and m

    Jan 1, 1996

  • CIM
    Optimization of the building ventilation of a bath treatment plant of an aluminium smelter using CFD modelling

    By E. Dernedde

    Industrial plants located in the province of Quebec, Canada, are subjected to large variations of the ambient air temperature, Building ventilation systems of these plants must have some flexibility i

    Jan 1, 2005

  • SAIMM
    Optimization of the compaction of hard-metal powder for the production of cutting tool inserts - Synopsis

    By K. Blaski

    his paper reports an investigation aimed at optimizing the compaction of granulated hard-metal powder for the production of cutting tool inserts. The optimal compaction is that which yields optimal sh

    Jan 1, 2007

  • SAIMM
    Optimization of the Cycle Time to Increase Productivity at Ruashi Mining

    By H. Thomas, I. N. M. Nday

    "*Paper written on project work carried out in partial fulfilment of BSc.Eng (Mining Engineering) degreeThe optimization of the cycle time to increase productivity at Ruashi Mining was an on-site proj

    Jul 1, 2019

  • CIM
    Optimization of the Damang Mine

    By Charles Amoah

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • IMPC
    Optimization of the design of AG Mill shell liners at the Gol-E-Gohar concentration plant

    By S. Banisi, A. Haji-Zadeh, H. Asadi, M. Maleki-Moghaddam

    One area in AG/SAG milling field which has received a great attention is the optimization of liner design for any application to increase the availability of mills. The Gol-E-Gohar iron ore concentrat

    Jan 1, 2014

  • SME
    Optimization Of The FGX Dry Separator For Cleaning High Sulfur Coal.

    By Baojie Zhang

    The main goal of this study was not only to investigate the effectiveness of the FGX Dry Separator for removing pure rock from run-of-mine coal producing a better feed stock for conventional coal prep

    Jan 1, 2012

  • SME
    Optimization of the Flotation of Low‑Grade Phosphate Ore Using DOE: a Comparative Evaluation of Fatty Acid Formulation to Sodium Oleate - Mining, Metallurgy & Exploration (2023)

    By Abdelaziz Baçaoui, Imane Aarab, Abdelrani Yaacoubi, Khalid El Amari, Abderahman Etahiri

    Phosphate ores upgraded by flotation are widely used as vital raw materials for the sustainable production of phosphate fertilizers to maintain the food supply. High-grade phosphate reserves become mo

    Dec 7, 2022

  • CIM
    Optimization of the Froth Washing System of Columns in the Rougher Circuit of the Miduk Copper Concentrator

    By M. Massinaei

    Recently constructed circuits have included multiple stages of columns in a variety of applications, from roughing to cleaning. The Miduk copper concentrator (in south-eastern Iran) is one of the uniq

    Jan 1, 2007

  • SME
    Optimization Of The Grinding Circuit Of The Jacupiranga Carbonatite Ore In Jacupiranga, Brazil ? Generalities

    By Cesar A. Busnardo

    The carbonatite orebody in Jacupiranga is situated some 230km (140-mi) southwest of Sao Paulo and is mined by Serrana S/A de Mineragao, producing an apatite concentrate for fertilizer production and a

    Jan 1, 1985

  • CIM
    Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing Plant

    By Willemijn Husslage

    Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000

    May 1, 2011

  • SME
    Optimization Of The Hydraulic Design Of Thickener Feedwells Applying Computational Fluid Dynamics And Experimental Techniques

    By L. Echeverri

    Research studies have shown that the flow within feedwells displays a vortical structure and high velocities at the locations where standard tangential inlets force its way into the feedwell swirling

    Jan 1, 2012

  • SAIMM
    Optimization Of The Operating Density And Particle Size Distribution Of The Cyclone Overflow To Enhance The Recovery Of The Flotation Of Copper Sulphide And Oxide Minerals ? Synopsis

    By F. Ntengwe

    The Konkola Mine, a subsidiary of the Konkola Copper Mines Plc (KCM) which is owned by the Vedanta group of companies of India and Zambia Consolidated Copper Mines Holding limited, is located at Chili

    Jan 1, 2011

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003