Search Documents

Sort by

  • AUSIMM
    Optimising Metallurgy at the Planning Stage to Minimise Environmental Impact - A Feedback Loop from Geochemical Waste Characterisation

    By P Mulvey

    "Currently mine process studies and geochemical waste characterisation are considered as two interdependent studies, necessary for the development of the mine and inclusion in the environmental impact

    Jul 15, 2013

  • AUSIMM
    Optimising Mining Selectivity with Particular Emphasis on Bench Height : A Case Study at the Telfer Gold Mine, Western Australia

    By Whitham M

    Prior to exploitation, the feasibility of mining and recovering ore can usually be determined to a satisfactory level of uncertainty by the consideration of conceptual scenarios, using a range of r

    Jan 1, 1991

  • AUSIMM
    Optimising multivariate variographic analysis with information from multivariate process data modelling (partial least squares regression)

    By L O. Filippov, Q Dehaine

    Variographic analysis, a classical tool from the Theory of Sampling (TOS), can address practical situations with multiple variables; however, its application has very often been limited to one variabl

    May 9, 2017

  • AUSIMM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis

    By H Kurth

    Geoscan is used for multi-elemental analysis of conveyed bulk materials in real time. It has been used for coal analysis since the 1990s, in the cement industry, and since 2003 for measuring mineral o

    Sep 7, 2015

  • CIM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)

    "Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z

    Jan 1, 2016

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • DFI
    Optimising the Compressive Behavior of Screw Piles in Sand for Marine Renewable Energy Applications

    By Andrew J. Brennan, Jonathan A. Knappett, Lewis Hamilton, Michael J. Brown

    "Abstract This paper investigates the compressive behaviour of screw piles in sands and the key design parameters which control this. These types of foundation elements have typically been used as scr

    Jan 1, 2014

  • SAIMM
    Optimising The Effective Use Of Energy In The Ferroalloy Industry Through Innovative Technology

    By A. M. Hearn, J. G. Roos

    Energy consumption, being a large proportion of the input of the ferroalloy production process, can be measured in terms of the efficiency with which the energy is utilized and the effectiveness with

    Jan 1, 2004

  • AUSIMM
    Optimising the Long Term Profit base for Consolidated Rutile Limited

    Consolidated Rutile Limited (CRL) was one of the best performing mining stocks of the turbulent 1980s, having a very high payout of franked dividends. In contrast to some other mining groups, it was

    Jan 1, 1991

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • CIM
    Optimising the Management of CIP/CIL Circuits

    By K. Barbetti

    "The carbon-in-pulp (CIP) process has been the dominant gold recovery process since the early 1980s. CIP has proven to be very adaptable for a wide range of ores and circuit configurations. The key pe

    Jan 1, 2017

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • IIMP
    Optimización de carga en correas transportadoras de área seca en minería

    By Gloria Lara

    El presente texto señala la aplicación de la metodología de daño proporcionales a tres casos de correas transportadoras críticas que funcionan sobrecargadas en una minera al norte de Chile y así deter

    Mar 1, 2015

  • IIMP
    Optimización de circuitos de molienda y clasificación en función de la eficiencia de molienda respecto del porcentaje óptimo de nivel de llenado volumétrico

    By Joseph Javes Aramburú

    El presente texto describe la optimización del circuito de molienda y clasificación de la planta de hierro, el cual comprende un molino de barras y de bolas. El proceso se inicia con la exploración ge

    Apr 1, 2013

  • IIMP
    Optimización de explotación en vetas angostas, uso de pernos y mallas; y voladura masiva

    By Miguel Calderón Rojas

    "Quiruvilca, es una mina con sistema de mineralización de vetas angostas , donde el buzamiento de veta es variable entre 35° a 85°, y la calidad de roca es baja. En ese sentido, el presente trabajo de

    Sep 14, 2009

  • IIMP
    Optimización de la gestión de recursos Hídricos en Orcopampa

    By Jimmy Gabriel, Hugo Aráoz

    El agua es un componente ambiental que prácticamente afecta todos los procesos de las operaciones minero – metalúrgicas en la UNIDAD MINERA Orcopampa, en este sentido la gestión de recursos hídricos b

    Sep 1, 2017

  • IIMP
    Optimización de la gestión del mantenimiento preventivo de la flota de camiones de acarreo de Antamina

    By Christian Huihua, Armando Moyonero, Jorge Escalante, Alberto Valera

    A raíz de una mayor demanda de horas hombre para cumplir con el mantenimiento de la flota de camiones de acarreo de Antamina, se puso en marcha la optimización de la gestión del mantenimiento preventi

    Sep 20, 2019

  • IIMP
    Optimización de la metalurgia planta concentradora unidad de producción “el cofre” - CIEMSA

    By Henry Brañes

    El presente trabajo describe el proceso de optimización metalúrgica de la planta concentradora “La Inmaculada” de la U.P. “El Cofre en Puno, dado que la mina no contaba con reserva suficiente para a

    Sep 14, 2009

  • IIMP
    Optimización de la mineralurgía compleja en Pb, Zn, Ag, Bi de la concentradora Paragsha en Cerro de Pasco Centromin Perú S.A.

    By Enrique Echegaray Muñiz

    Luego de realizarse un estudio integral sobre la recuperación de minerales en la unidad productiva de Cerro de Pasco y relacionarlo con la problemática experimentada durante años sobre la metalurgia d

    Apr 1, 1991

  • IIMP
    Optimización de la molienda mediante la implementacion de un sistema experto en la concentradora Toquepala

    By Sergio Quiñones Manga

    En los circuitos de molienda de la Concentradora Toquepala fue implementado el Sistema Experto con el objetivo de optimizar la capacidad de molienda. En este sentido, el presente texto describe la ope

    Sep 14, 2009