Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Baumgartner Shafts and TunnelBy Jim Nickerson, James McCleish, Tom Abkemeier, Nicholas Willig
The purpose of this project is to convey sanitary sewage from an existing pump station to a new waste water treatment plant. This paper will discuss the design and construction aspects of the project.
Jan 1, 2005
-
New Developments In Ground Support Technology For Open-Type Tunnel Boring MachinesBy Steve Chorley
Open-type, or main beam, tunnel boring machines (TBMs) can achieve impressive rates of production. This type of TBM typically outperforms other types of TBMs currently in use around the world. In good
Jan 1, 2011
-
Construction of the Pergau Hydroelectric Power Project, MalaysiaBy Patrick J. Doig
In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,
Jan 1, 2001
-
Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? IntroductionBy A. Jennings
[ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran
Jan 1, 2012
-
Health Of The Underground Construction Industry Evident At RETCIn spite of a global economy that continues to seesaw and a U.S. Congress that is at odds with the president and themselves, cities around the world are still spending billions on their infrastructure
Jan 1, 2011
-
Strong Programming, Optimism Seen at SME’s Annual MeetingBy Tim O’Neil
Upbeat, surprisingly so, might describe the mood at the2002 SME Annual Meeting and Exhibit in Phoenix, AZ. More than 4,000 mineral professionals gathered for three days of education, networking and p
Jan 1, 2002
-
Integration Of Operations And Underground Construction: Sound Transit University LinkBy John Sleavin
As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove
Jan 1, 2010
-
North American Tunneling Conference Drives ValueThe theme of the 2012 North American Tunneling conference (NAT) was ?Tunneling: Driving Value.? This theme best reflects where the tunneling and underground construction industry is to-day. Major ad
Jan 1, 2012
-
Leaching Of Sarcheshmeh Copper Oxide Ore In Sulfuric Acid SolutionBy H. Razavizadeh
The recovery of copper from oxide ores containing from 2% to 4.1% acid-soluble copper from the Sarcheshmeh mine in Kerman province of Iran was investigated by agitation leaching in sulfuric acid media
Jan 1, 2008
-
Handling The Impacts Of Blasting On Grand Central Terminal For The MTA?s East Side Access ProjectBy A. J. Thompson
The Metropolitan Transportation Authority (MTA) East Side Access project (ESA) will, when it is complete, provide a new link to the east side of Manhattan from Long Island, NY that, linked with the Se
Jan 1, 2012
-
Construction Of A TBM Launch Box In A Complex Urban EnvironmentBy Vincent Tirolo
The proposed Second Avenue Subway is a new two-track subway line running from 125th Street and Park Avenue at the north, east along 125th Street to Second Avenue and south along Second Avenue to the F
Jan 1, 2013
-
Cultural Issues Are Important In The Implementation Of Mining VenturesBy Len Harris
Webster?s Dictionary describes culture as: ? The totality of socially transmitted behavior patterns, arts, beliefs, institutions and all other products of human work and thought typical of a popul
Jan 1, 2008
-
Port Authority Of Alleghany County North Shore Connector Project Tunnels And Station Shell Case History Contracts 003 And 006By Paul Zick
The Port Authority of Allegheny County North Shore Connector (NSC) Project involves TBM excavation of twin 690 m (2,240 lf) precast segment lined light rail tunnels through soil and rock under the All
-
The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 MonthsBy Refik Elibay, Lawrence A. Williamson, George D. Barnes
Under an extremely aggressive schedule, final design of 13.5 km (8.4 miles) miles of 8.2 m (27 ft) diameter deep rock tunnel, 322 ML/day (85 million gallons / day)submersible pumping station and assoc
Jan 1, 2005
-
Considerations For Blending Low-Rank and High-Rank Coals – Preprint 97-15By O. Ogunsola, M. Downing
This paper gives a brief overview of impacts of coal blending on coal-fired power plants performance and discuses the preliminary results of an on-going study aimed at evaluating the effect of coal pr
Feb 24, 1997
-
An Analysis Method For Modeling Compensation Of Settlements Due To Tunnel Driving BY Grouting Cement SuspensionsBy Christian Wawrzyniak
An analysis method for modeling compensation grouting based on the finite element method is presented. By this method the design parameters of compensation grouting, grouting pressure and grouting vol
-
Rehabilitation of the Cape Creek Highway Tunnel Under TrafficBy Roberto J. Guardia, Tim Shell, Robert A. Robinson, Steve Rodolf
Our aging infrastructure includes numerous tunnels that provide easy access through topographic and societal obstacles. These tunnels are renewable resources that require periodic maintenance and reha
Jan 1, 2005
-
AUV- and ROV-based exploration of active and inactive seafloor massive sulfide deposits at the Semyenov and Irinovskoe sites on the Mid-Atlantic RidgeBy J. W. Jamieson, J. Escartin, A. Steinführer
Evidence of hydrothermal activity on two Mid-Atlantic Ridge oceanic core complexes (OCCs), at 13º30’N (the Semyenov 1 through 5 fields) and 13º20’N (the Irinovskoe field) (Fig. 1) were studied using C
Sep 1, 2014
-
Lyon–Turin Long and Deep Railway Tunnel ProjectBy P. Fauvel, V. Nasri
In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over
Jan 1, 2005
-
Heap Leaching Discussed at RoundtableBy Kerry Lahti, Bryan Ulrich
On Feb. 11, 2005, more than 20 mining professionals gathered in Elko, NV for a day-long round-table discussion on heap leaching. Attendees included project managers, operators and environmental profe
Jan 1, 2005