Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Recovery of Copper from Industrial Waste Solutions by Cementation Using a Rotating Fixed Bed of Stacked Steel Screens Mining, Metallurgy and ExplorationBy G. H. Sedahmed, S. A. Nosier, M. H. Abdel-Aziz, A. A. Mubarak, M. A. El-Naggar, E. G. Abdel-Aziz
The performance of a rotating fixed bed reactor in recovering copper from industrial waste solutions by cementation is studied under various conditions. The rotating fixed bed is made of stacked woven
-
Leaching Practices At Smoky Valley MineBy C. Arthur Lefler
The hydrometallurgical processes for recovery of gold and silver in use at Round Mountain, Nevada and the practical aspects of the operation are discussed. Included are heap leaching by cyanidation, u
Jan 1, 1981
-
Reducing Enclosed Cab Drill Operator’s Respirable Dust Exposure At Surface Coal Operation With A Retrofitted Filtration And Pressurization System (83490ae4-de2e-4245-8093-9fec0a123d31)By W. A. Heitbrink, J. D. Ashley, R. E. Gresh, J. A. Organiscak, A. B. Cecala
Many different types of mobile equipment used in surface coal mining utilize enclosed cabs to protect equipment operators. The overburden removal process is extremely dusty and can cause excessive ex
Jan 1, 2002
-
High Speed Excavation By Drill & Blast With Mechanized Mucking System?Mitholz Railway Tunnels, SwitzerlandBy Stig Eriksson
In Switzerland two major railway systems as shown below in Figure 1 has recently been completed or is under construction: ¦Lötschberg, south of Bern which was commissioned in 2007 ¦Gotthard, south
-
Underground Construction For A Combined Sewer Overflow System In Providence, Rhode IslandBy John L. Kaplin
The underground construction for the Phase I Combined Sewer Overflow(CSO) Project is on an impressive scale by any measure, appearing more so in a midsize city like Providence, RI. The Narragansett Ba
-
Sustainable Mineral Development: Possibilities and Pitfalls illustrated by the Rise and Fall of Dutch Mineral Planning GuidanceBy M. J. van der Meulen
"The Netherlands has major resources of sand, gravel and clay, exploited mainly for construction works and the building materials industry. As in most western countries, mineral extraction meets with
Jan 1, 2005
-
Inner City Slurry Tunneling—Project Asdam, Antwerp, BelgiumBy Klaus Rieker
North of Antwerp central train station, two single-track tunnels for the high-speed train line between Brussels and Amsterdam were constructed. At the same time, the central train station was modified
Jan 1, 2007
-
The Technology And Economic Incentives For Recovering Coal From Tailings ImpoundmentsBy A. S. Murphy, E. V. Manlapig, C. Green, J. W. Parkinson
Historically in Australia and the United States many coal mines deposited raw wash plant fines into large slurry impoundments. At the time the technology and market economics did not exist to make it
Jan 1, 2001
-
A New Short- And Medium-Term Production Planning Tool - Minesight® Schedule Optimizer (MSSO) - Preprint 09-079The MineSight Schedule Optimizer (MSSO) is a new production scheduling tool developed by Mintec, Inc. using mixed integer linear programming (MILP) techniques. This tool was developed to solve the sho
Jan 1, 2009
-
Overcoming Challenges in the Construction of the Dublin Port TunnelBy Tim Brick, Peter Jewell, Stephen Thompson, Simon Morgan
The $980m (€750m) Dublin Port Tunnel, Europe’s biggest urban highway tunnel project, was opened in December 2006. The culmination of this immense scheme is set to transform the environment, mobility a
Jan 1, 2007
-
Ground Characterization For CSO Tunnels In Washington, D.C.By Maurice A. Ponti
The D.C. Water and Sewer Authority is implementing the Anacostia River Projects component of its Long-Term CSO Control Plan, including 21 kilometers of 3.7- to 7-meter-diameter CSO near-surface divers
-
Members Ready for Mining Industry Upswing at SME’s Annual MeetingBy Steve Kral
It seems that mining has been in the doldrums for awhile. Except for gold, metals prices remain depressed. And economic conditions in the United States and around the globe have put governments in a
Jan 1, 2003
-
Longwall Mining, Shale Gas Production, and Underground Miner Safety and HealthThis paper presents the results of a unique study conducted by the National Institute for Occupational Safety and Health (NIOSH) from 2016 to 2019 to evaluate the effects of longwall-induced subsurfac
Jan 7, 2020
-
Convection Mechanisms For Geothermal Heat Exchangers In A Vertical Mine ShaftBy R. Thornton
Montana Tech is located in the historic mining town of Butte, MT and is adjacent to the Orphan Boy mine. This abandoned underground mine will be the heat source for a down-hole heat exchanger (DHE)/he
Feb 27, 2013
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, OhioBy Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Building Better Haul Roads: Designing For Structural StrengthThe structural design of a mine haul road involves the determination of cover thickness requirements above the in-situ or sub-grade material. The specification of these layerworks is a critical compo
Jan 1, 2011
-
Automatic Determination Of Dig Limits Subject To Geostatistical, Economic, And Equipment ConstraintsBy K. Norrena
Grade control in open pit mining requires the specification of dig limits that account for mineral grades, economic costs, and selectivity of mining equipment. Visual identification of ore rock types
Jan 1, 2001
-
Reclaiming Steep-Slope Eastern Coal Mines For Successful ReforestationA methodology has been developed and demonstrated to be effective in reclaiming surface-mined land for a forestry post-mining land use. The Forestry Reclamation Approach (FRA) has been applied, almos
Jan 1, 2011
-
Engineering Geology Of The Mica Underground PowerplantBy Douglas D. Campbell, Alan S. Imrie
INTRODUCTION Mica Dam is located on the Columbia River just downstream of the "big bend" of the Columbia, where it leaves the Rocky Mountain Trench and begins to flow southwards, approximately 85 m
Jan 1, 1976
-
Project Management For Dummies, Or “How To Improve Your Project Success Ratio In the New Millenium”By R. J. Hickson
From 1993 through 1999 Cyprus Amax Minerals Company successfully completed eight major construction projects around the world. Six greenfield mines were brought into production, an ongoing operation w
Jan 1, 2000