Electric Arc On A Coke Bed In A Submerged Arc FurnaceBy J. A. Bakken, T. Magnusson, G. Sævarsdottir
This paper describes measurements of current and voltage done on submerged arc furnaces. The aim is to focus on and attempt to separate from one another the electric arc current and the current bypass
Jan 1, 2007
-
Development Of The Density Distribution Model In A Gas-Solid Phase Fluidized Bed For Dry Coal SeparationBy Y. He
The nature of the density distribution in a gas-solid phase fluidized bed for dry coal separation is an important factor in influencing the performance. However, during coal processing, fine slime wou
Jan 1, 2002
-
Comparison of the fractography of rockbursts and impact structuresBy W. U. Reimold, R. Armstrong, R. G. Charlesworth
For many years rockbursts have plagued the mining industry. Although much research has gone into studying this phenomenon only a small proportion of it has been on the actual source mechanism. A study
Jan 1, 2003
-
Interaction of dust with the DC plasma arc - a computational modelling investigation (48774a53-c126-481b-8630-879d3aef53c9)By Q. G. Reynolds
The presence of dust and fume suspended in the freeboard region is a common feature of the operation of direct current (DC) plasma smelting furnaces. This occurs primarily as a result of the use of fi
Jan 1, 2015
-
Stabilisation of the Nickel Sulphide Concentrate Volumetric Flow Rate and Implementation of Mass Pull Control Strategy at Nkomati MineBy Ike Madingoana, Stephan van Zyl, Antoine F. Mulaba-Bafubiandi
"The study presents a control strategy implemented at the Nkomati nickel mine flotation plant for process stabilization and improvement. The control strategy involves flotation concentrate volumetric
Jan 1, 2015
-
Fundamental Analysis Of The Interaction Between Overburden Behaviour And Snook Stability In CoalminesBy J. N. Van der Merwe
In the process of pillar extraction, pillars are seldom if ever extracted completely. The pillar remnants, or snooks, play an important role in the extraction process. At the working face, they need t
Jan 1, 2005
-
Treatment Of Lead And Zinc Slags In Hollow Electrode DC-EAF In Consideration Of Calculated Phase Equilibria And ThermodynamicsBy J. Böhlke, B. Friedrich, E. Hecker
The legislation for the disposal of heavy metals contaminated substances is still going to be tightened up in the future. The main criteria for the utilization or deposition of these residues are the
-
An intelligent system for visual monitoring of the ECS complex of the ‘Majdan III’ open pit mine, ‘Potisje-Kanjiza’, YugoslaviaBy K. Kasas, J Kermeci, S. Vujic, S. Secei, P. Kermeci
On the ‘Majdan III’ open pit mine, supplying with brick clays the production plants of the industry of building material ‘Potisje-Kanjiza’ from Kanjiza, a modern ECS (excavator-conveyor-spreader) comp
Jan 1, 2003
-
Interaction Between The Block Cave And The Pit Slopes At Palabora Mine (9bc522bc-fe6d-493d-b039-b6a950e034a4)By A. Moss
The Palabora Mining Company has successfully extended the life of its operation by developing a 30 000 tpd block cave underground mine below the now closed open pit. The process of transitioning from
Jan 1, 2006
-
-
Needs Analysis for Capacity Building of Artisanal Miners in Central AfricaBy Steven M. Rupprecht
"The artisanal mining sector in Central Africa is largely informal, yet provides an essential livelihood for many (directly or indirectly) participants, as well as facilitating an important source for
Jan 1, 2015
-
Evaluation Of Movement Data And Ground Conditions For The Åknes Rock SlideBy V Kveldsvik, N Ragvin, T Eiken, G Grøneng, G V. Ganerød
Catastrophic rock slope failures have caused destructive tsunamis in Norwegian fjords. At the Åknes rock slope the tsunami generating potential is large due to the potential large volume involved in a
Jan 1, 2006
-
Electrode Management ? Investigation Into Soft Breaks At 48MVA FeCr Closed FurnaceBy P. K. Sahoo, C. R. Ray, S. S. Rao
Good operation of Soderberg electrodes is dependent upon high quality electrode paste coupled with better electrode management procedures. Without having a good electrode operation, it is not possible
Jan 1, 2007
-
Utilization of scripting languages for customization of mine planning packages by specialized usersBy D. R. Hack
The complexity of commercial mining software has gained rapidly over the past decade as hardware developments have surpassed software capabilities at a staggering rate. Software users, recognizing the
Jan 1, 2003
-
Primary De-Oxidation Of Basic Oxygen Furnace Steel By Means Of CarbonBy C. Kloppers
The aim of this investigation was to reduce the cost of primary steel de-oxidation by substitution of aluminium primary de-oxidation with a practice that uses carbon. The cost of carbon is four times
Jan 1, 2001
-
Project Valuation, Capital Investment And Strategic Alignment - Tools And Techniques At Anglo Platinum (defa1552-deac-43da-9958-aabe8c199db2)By G. L. Smith
Central to the success of any mining company is the ability to manage capital investment effectively so as to ensure acceptable stakeholder returns within an overall strategic context. Critical to thi
Jan 1, 2007
-
An initial assessment of the closely spaced dip-pillar mining layout as practised at Driefontein Gold MineBy J. W. Klokow, K. L. Riemer, R. I. L. Ferreira
As a result of the increased depth of mining in the South African gold mining industry mining induced seismicity is a severe problem. One of the strategies within the industry to contain the problem i
Jan 1, 2003
-
Selenium Impurity In Sodium Sulphate Decahydrate Formed By Eutectic Freeze Crystallization Of Industrial Waste Brine - SynopsisBy G. Apsey
Eutectic freeze crystallization (EFC) is a novel technique for the recovery of pure salt and pure water from hypersaline waste brines. It is therefore a promising technology for the treatment of indus
Jan 1, 2013
-
Sidewall Design For Improved Lining Life In A PGM Smelting FurnaceBy I. McDougall
The matte/slag tidal zone in a nickel-copper-iron-sulphide matte smelting furnace is subject to severe process conditions that can lead to premature failure of the lining. The MgO-FeO-SiO2 slag is agg
Aug 1, 2013
-
Risk In Project Preparation - ?Determining The Project Needs And The Effects On The Management Strategy?By A. M. Clegg
In general, overall experience has shown that the approach to the appointment of a project manager is given much attention, but little specific attention is given first to the risk associated with the
Jan 1, 2005