Excavation for Underground Salt PlantBy Jim Breedlove, Stephen P. Case, Mike Fabio
To meet salt production needs over the remaining life of the Cayuga Mine at Lansing, New York, the Salt Division of Cargill, Inc. decided to build a new underground screening plant. The new plant requ
Jan 1, 1996
-
Blast Vibration Frequencies: What Do They Mean?By Douglas A. Anderson
The US Bureau of Mines, in RI 8507, has shown that blast vibrations at low frequency are more likely to cause damage and complaints than those at higher frequency. Since that publication in 1980, the
Jan 1, 1992
-
Evaluation of Advanced Bulk Emulsion Explosive and Loading SystemBy Lawrence Mirabelli, AngloGold Ashanti, Greg Gibson
Cripple Creek & Victor Gold Mining Company (CC&V) operates the largest surface gold mine operation in Colorado and is located west of Colorado Springs in Teller County between the towns of Cripple Cre
Jan 1, 2014
-
Blasting for the Enhanced Western Groundwater Extraction System - Modern LandfillBy Jay Smerekanicz, Florin: Pedersen Gheorghiu, Alan Cameron
In order to expand the capacity of Modern Landtill, a groundwater extraction system consisting of a linear system of pumping wells over 2,700 feet long had to be replaced. The new system would be cove
Jan 1, 2001
-
Pre-Blast Inspection (Construction/Conducting)By Sandra Penttinen
To assist blasting professionals with the creation, documentation, and appropriate methodology to standardize the data collection of the pre and post blast investigation process. Penttinen Associates
Jan 1, 2001
-
Seismic Radiation from Explosive Charges in the Near-field: Results from Controlled ExperimentsBy L. Trivino
Blast-induced damage criterion based on the peak particle velocity has worked reasonably well for estimating building damage. However, the same criterion cannot be used to estimate damage to rock and
Jan 1, 2009
-
Preserving Highwall Stability by Shifting the Dominant Blast Vibration Frequency with Electronic InitiationBy Charles Zdazinsky
"The Multiple Seed Waveform (MSW) blast vibration model, a type of waveform superpositionmodeling developed by Orica Inc., uses vibration data that is collected from a signature hole blast tocharacter
Jan 1, 2016
-
Precision Delay Detonators and Their Effect on Blasting Performance in Quarry BlastsBy B Mohanty, M Alam, F Gauthuer
A series of eleven full-scale production blasts has been earned out in a limestone quarry to study the effect of delay interval and its precision on overall blasting performance. The quarry employed A
Jan 1, 1991
-
Strain-Based Vibration Criteria for Blasting in New York CityBy Catherine T. Aimone-Martin, Meyers Joseph A.
A new strain-based criteria is being adopted for rock blasting in New York City (NYC). This criteria is based on several years of research involving vibration measurements of tall structures during bl
Jan 1, 2019
-
A Mine-to-Crusher Framework for Aggregate OperationsBy Diogo Fonseca, José Manuel, Nuno Fernandes, Blessing Taiwo
This research focuses on enhancing the synergy between blasting and primary crushing operations in quarries. A blast operation at dstgroup aggregate quarry in northern Portugal was simulated to fine-t
Jan 21, 2025
-
Seismic Surveying, Instrumentation and ApplicationsBy Bruce B. Redpath, Doug Crice, Rob Huggins
Over the last decade, instrumentation has been developed that allows the application of seismic reflection methods to groundwater and engineering problems. At the Geological Survey of Canada, we have
Jan 1, 1991
-
Timing Effects on FragmentationBy C. Braun, C. Kennedy, P. Katsabanis
A series of small scale tests, simulating multi-hole blasts have been performed to establish the effect of delays on blast fragmentation. The blasts were performed in high quality granodiorite blocks,
Jan 1, 2006
-
Excavation of a Tunnel to Reach a Large Underground Cavern Roof FallBy H. S. Venkatesh R. Balachander, G. C. Naveen
During the construction of a 1020 MW underground hydroelectric project in Bhutan a huge rock fall took place in the Downstream Surge Chamber (DSC) during March 2016. The total quantity of rock in the
Jan 1, 2019
-
Effect of Impact on Pre-Squibbed FireworksBy Paul Worsey, Yasutaka Dote
The choreography of large fireworks displays dictates electric initiation for precise timing. It has been common practice to pre-squib products before transportation for reducing set up time. A number
Jan 1, 2009
-
Journal: Kaiser Plant Demolition / Smokestack Demolition at port of Tacoma, WashingtonBy Walt Meglasson
The Kaiser Aluminum Company Smelter, one of several in the Pacific Northwest, was built in 1942 and operated by the Olin Company during World War II and then purchased by Kaiser Aluminum after the war
Jan 1, 2008
-
Using Artificial Intelligence and 3D Imaging to Provide Real-time Particle Size Analysis on Haul TrucksBy Saeed Karimifard, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Frank Chu, Caitlin McKinnon, Tetiana Konstantynivska, Glen Turner
Continuing blast optimization is the cornerstone of any mine-to-mill approach, and particle size analysis is a key metric for meeting blast targets to reduce overall energy consumption and operating c
-
Journal:Security Matters / Procedures to Follow When Explosives Are Missing From Inventory (e.g., Disposition Unrecorded/Unknown)Prepare ATF Report of Theft or Loss (ATF Form 5400.5). A Report of Theft or Loss - Explosives Materials must be prepared when it is discovered that explosive materials are missing from inventory. Subm
Jan 1, 2008
-
Full Wall Control Blasting OptimizationBy John Floyd, Maria Rocha, Benjamin Cebrian
Wall control blasting is needed in most metal mining operations in terms of increasing mineral reserves and assuring the safety of the operation. This type of blasting has the goal to achieve a clean,
Jan 1, 2018
-
Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power PlantBy Thierry Bernard, Philippe Dozohne
May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate
Jan 1, 2001
-
ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMineBy Yong Pan, Purushotham Tukkaraja
It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose
Jan 1, 2019