    Evaluation Of The Group Equivalent Pile Approach For Laterally Loaded Shafts

    By Cheng Lin

    The Group Equivalent Pile (GEP) approach was proposed by researchers to analyze a laterally loaded pile group. This approach enables engineers to evaluate the behavior of a pile group in single pile a

    Jan 1, 2009

  • DFI
    Case History: Multiple Axial Statnamic Tests On A Drilled Shaft Embedded In Shale

    By Paul J. Axtell

    Two new railroad bridges in Kansas City, Missouri are founded on drilled shafts embedded into the soil and underlying shale. The uncertainty arising from the non-homogeneous, anisotropic nature of mo

    Jan 1, 2006

  • DFI
    Capacity Of Slender Steel Piles

    By J. Wennerstrand

    Slender steel piles have found an increased use in Sweden in resent years. These piles are often driven throw soft normally consolidated clay to refusal in till or at the rock surface. In contrast to

    Jan 1, 1989

  • DFI
    Plastoelastic Analysis Of Bearing Capacity For Soil Anchor

    By Hui Yongning

    This paper presents a simulating test of constitutive relation of soil anchor in laboratory and puts forward a new plastoelastic mechanical model, on which a new calculating formula of elastic and pla

    Jan 1, 1991

  • DFI
    Information Construction Technology For Supported Excavation In Urban Construction

    By Sun Jiale

    This paper presents a brief description of information construction technology for supported excavation to assure satisfactory performance of engineered system. As a successful example of application

    Jan 1, 1991

  • DFI
    Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :

    By Virendra Singh

    The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic

    Jan 1, 1996

  • DFI
    Hand-Dug Caisson Foundation Of The International Trade Centre In Shenzhen ? Synopsis

    By Y. G. Li

    The design and construction of the hand-dug caisson pier foundation of the Shenzhen International Trade Centre are described in the paper. In addition discussions and inquires about the load-bearing c

    Jan 1, 2010

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991

  • DFI
    The Pile Foundation Of Tall Buildings In Shenzhen

    By Li Keqiang

    This paper discusses the pile foundation of tall buildings in Shenzhen region. For 156 constructed tall buildings exceeding 18 storeys, about 86. 5 per cent of the sum. The two main types of foundatio

    Jan 1, 1991

  • DFI
    Anchored Pile Foundations In British Columbia

    By Cory J. E. Yacyshyn

    Anchored steel pipe piles are being used more frequently in British Columbia for shoreline projects such as public ferries, cruise ship docks, containership terminals and locally in the expansion of t

    Jan 1, 2004

  • DFI
    Arbitration - The Tender Trap

    By James Green

    It has often been said that the best contracts written are by people who are suspicious of each other. The Spanish philosopher, Ortega y Gasset, said: "Every contract is an Act of Distrust." T

    Jan 1, 1987

  • DFI
    Single Axis Tooling Methods - A. Introduction

    By George K. Burke

    Single axis soil mixing is a mechanical method of blending soil in situ with a reagent binder to achieve improved character. Generally this achieves a design compressive strength or shear strength and

    Jan 1, 2001

  • DFI
    Design & Construction Of Pile Foundations For A Building Complex - A Case History

    By S. K. V. Avasarala

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c

    Jan 1, 1995

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • DFI
    Bearing Capacity Of Precast Nodular Piles In Tianjin Soft Clayey Soil

    By Xu Youzai

    Static loading teets of five nodular piles and four non-nodular piles were performed in Tianjin soft clayey soil in which measurements of axial force and movements were made. Distribution of shaft res

    Jan 1, 1991

  • DFI
    Static Load Transfer Computation Of Piles

    By Pan Shisheng

    Amodified load transfer method computing the displacement, axial compression, skin resistance, toe resistance, and other static bearing behaviours of piles, is propoesd in this paper. Through deriving

    Jan 1, 1991

  • DFI
    Pile Foundation - A Critical Study Of Some Design Aspects. - Synopsis

    By S. L. Karunakaran

    Selection of an appropriate foundation system requires great skill and ingenuity on the part of the designer. Certain guidelines for choosing between a pile and raft foundation are presented. A number

    Jan 1, 1996

  • DFI
    Building The High-Pressure Jet-Grouting Curtains For Deep Foundation Ditch In The Seaside Area

    By Lin Daoyi

    In this paper, we have adopted the high pressure jet-grouting curtains to seal the sea-water, and to consolidate the wall of the well for deep foundation diteh, make a pladge of building and construct

    Jan 1, 1991

  • DFI
    A Quality Control System For Augered Cast-In-Place Pile Installation

    By George G. Goble

    The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very

    Jan 1, 1997

  • DFI
    Maturation of Risk Concepts in the Management of Infrastructure - Lessons from the US Army Corps of Engineers

    By Eric C. Halpin

    "1. Introduction and Backgrounda. In its fundamental form, risk is simply the likelihood of an adverse impact. Expanding on this theme, the Corps of Engineers has broadly defined risk associated with