Performance Of A Large Diameter Drilled Pier (f4c3f0c8-a45b-48d0-8d0a-138a34a08ce3)By A. J. Partos
The figures and tables referred to herein are presented in the Proceedings; Volume I, Pages 309 through 316. The 61-story One Liberty Place, at 315 m., is the tallest building 1n Philadelphia and
Jan 1, 1991
-
Pile Load Test Results Using The New Statnamic MethodBy Matthew Janes
Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa
Jan 1, 1990
-
Analysis Of The Settlement Of A Single Axially Loaded Soil-Cement PileBy Jiwei Duan
The deformation and load transfer behavior of a single soil-cement column are studied with the finite element method. The results show that there is an effective length for a soil-cement column. Beyon
Jan 1, 2002
-
Mathematical Background For The Design Of Rotating Machinery Foundations With Deep Piles ? SummaryBy Marius B. Wechsler
There are considered deep piles which are fixed in blocks of rotating machinery foundations. A mathematical background is developed for determining the behavior of this kind of piles for motions cause
Jan 1, 1987
-
The Effect Of Vertical Pile Loading On Subsequent Lateral BehaviourBy A. Lyndon
Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically
Jan 1, 1989
-
The Theory And Practice Of Deep FoundationsBy Xu Ronglie
This paper looks back on the developments and achievements of deep foundations, on the basis of the complex geological conditions and environments in China. It sums up advances in theoretical and appl
Jan 1, 1991
-
Results Of Dynamic And Static Load Tests On Helical Piles In The Varved Clay Of MassachusettsBy Jorge Beim
Helical Piles are increasingly being used to support and rehabilitate structures subjected to compressive axial loads. Traditionally, empirical correlations between installation torque and load capaci
Jan 1, 2012
-
List Of DelegatesAUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,
Jan 1, 1994
-
Converse Probabilistic Analysis And Testing In Situ For Bed Rock Under Pile With Large DiameterBy Peng Jiahong
With ultrasonics application during checking the large diameter cast-in-situ pile body, it is usualy applied the statistical method of probability and PSD. This paper presents a converse probabilistic
Jan 1, 1991
-
Geotechnical Investigation For Deep Foundation Projects In Shanghai Area ? SynopsisBy E. R. Wang
This paper outlines the engineering properties of shallow soil in Shanghai area. The main points that should be paid attention to during deep foundation investigation, and general conditions of experi
Jan 1, 2010
-
Increasing Lateral Pile Stiffness Through Limited Soil ImprovementBy Thomas J. Weaver
Piles extending through soft soil near the ground surface will have a relatively low lateral stiffness. As a result, lateral serviceability limits may control the number of piles required for foundat
Jan 1, 2006
-
Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:By Paul Morrison
The paper describes the design process, trial testing and contract pile installation of 772 precast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig
Jan 1, 2000
-
History Of Timber Piles And Preservation Techniques - A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982By Bruce Haldeman
Timber has been used as pile support for structures for 6,000 years. Some means of preservation of wood go back almost that far. Timber piles support all types of structures ? some are buried below th
Jan 1, 1984
-
History Of Foundation Pile Driving Hammers In New York City, 1900 To 2000 - SummaryBy James S. Graham
Foundation pile driving hammers used in New York City in the past 100 years have been drop, steam, compressed air, diesel, and hydraulic. In 1992, the first hydraulic hammer in the New York City area
Jan 1, 2000
-
The Design Of Deepwater Wharves Which Are In The Complex Geological Conditions Of Pearl River EstuaryBy F. W. Liang
The geology of pearl River estuary belongs in strong weathered rock quaternary geological systen, so the conditions are complication. Since 80's we built the first deepwater wharf of Shenzhen chi
Jan 1, 1991
-
Evaluation Of The Originally Published, Meyerhof Empirical Correlations Of Shaft Friction And End Bearing Capacity For Driven Piles Using Dynamic Test DataBy Karl A. Higgins
In 1976, Prof. G. G. Meyerhof published a famous article in the Journal of Geotechnical Engineering titled ?Bearing Capacity and Settlement of Pile Foundations?. This article presents the authors opi
Jan 1, 2011
-
Numerical Analyses Of Pile Load Testing And Pile Base GroutingBy Wen-Chieh Cheng
Two bored piles with base grouting are loaded axially and the results are used to compare with numerical analyses. One compressive pile with a diameter of 2 meters is drilled through clay deposit and
Jan 1, 2006
-
Thermal Integrity Profiling Of Drilled ShaftsBy Gray Mullins
The construction of drilled shafts as well as other cast in place foundation alternatives relies heavily on good practices from the contractor, engineer, and inspector in order to produce a quality fo
Jan 1, 2010
-
Dynamic Stability Of An Axially Loaded PileBy S. S. Gajin
The paper deals with parametric vibrations of an axially loaded pile. The dynamic model is derived by means of Hamilton's principle and reduced to a partial differential equation with variable c
Jan 1, 1989
-
Experiences Of The Cast-In-Situ Pile Filling In Stone-Line IntercalationBy Guan Jichang
An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t
Jan 1, 1991