    Advances in Stress-Wave Nondestructive Testing Methods for Evaluation of Deep Foundations

    By Joseph T. Coe, Siavash Mahvelati, Alireza Kordjazi

    This paper introduces recent advances in stress-wave NDT systems for use in assessments of in-service foundation integrity and drilled shaft construction. The primary results of the laboratory experim

    Jan 1, 2018

  • DFI
    Threading Piles Past Underground Assets In Central London

    By Alexander Nikolic

    The paper presents the foundation design and construction of a landmark urban redevelopment scheme in central London, UK. The scheme comprises the new Tottenham Court Road Underground station, Crossra

    Jan 1, 2011

  • DFI
    Business Benefits Of An Integrated CFA Rig Instrumentation System

    By Jason N. Scott

    CFA piling is a ?blind? construction process that relies heavily on the rig instrumentation to produce sound piles. If the data measured and recorded during construction can be made available to engi

    Jan 1, 2006

  • DFI
    Load In A Drilled Foundation. Where Did It Go And When Did It Get There?

    By Walter E. Vanderpool

    Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.

    Jan 1, 2004

  • DFI
    Sonic Integrity Testing - 1.0 Summary

    By A. F. van Weele

    In general cast-in place piles will have an irregular pile shape. However, it is possible that these irregularities are so large that they may lead to pile deficiencies. It is very rarely possible to

    Jan 1, 1987

  • DFI
    Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, Gujarat

    By Ekhlaq A. Khan

    "The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a

    Jan 1, 2017

  • DFI
    Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation Projects

    By Martin B. Hudson, Daniel Brescia, Zhangwei Ning

    Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea

    Jan 1, 2018

  • DFI
    Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.

    By Theo. A. M. Salet

    The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a

    Jan 1, 2006

  • DFI
    Geotechnical Exploration Phase Drilled Shaft Load Testing

    By Walter E. Vanderpool

    Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and

    Jan 1, 2011

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • DFI
    Use Of Controlled Modulus Columns In Retail & Industrial Development Projects

    By Frederic Masse

    With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f

    Jan 1, 2011

  • DFI
    250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group Technology

    By Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni

    "Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity

    Jan 1, 2014

  • DFI
    Stress And Deformation Of Pile Foundation Of Sutong Bridge

    By Yin Zongze

    The pile foundation of Sutong bridge pylons is an extra large pile foundation. The length of piles is 115m, and the diameter of the piles is 2.5-2.8m. Since the traditional design method may not deter

    Jan 1, 2006

  • DFI
    Value Engineering of Reinforcement used in Large Diameter Drilled Shafts

    By Shahid Islam, Lucian Bogdan

    Deep and large diameter drilled shafts use mostly bundles of Grade 60 (415 MPa) reinforcing bars as longitudinal reinforcement with rebar splices to make it longer. Lower Grade steel requires large nu

    Jan 1, 2018

  • DFI
    Value Engineering – Design Risk and Reward at Major Sport Arena Projects

    By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli

    Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw

    Jan 1, 2018

  • DFI
    Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization

    By Frederick W. Slack

    This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage

    Jan 1, 2003

  • DFI
    Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)

    By Anne Lemnitzer

    Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group

    Jan 1, 2010

  • DFI
    Advantages of Design in Drilled Displacement Type Piles in Tropical Porous Soil Deposits

    By Jean R. Garcia, Paulo J. R. Albuquerque, Renato P. Cunha, Osvaldo Freitas Neto

    "Abstract Results obtained from in-situ load tests carried out on drilled displacement piles sunk in a porous, lateritic and unsaturated soil deposit, are analyzed in this paper. Three slow-maintained

    Jan 1, 2014

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006

  • DFI
    Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and Casino

    By Michael Arnold, Jonathan Delgado

    In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca

    Jan 1, 2018