Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Interstate 70 Construction Through Glenwood Canyon, Colorado - Glenwood Canyon ConstructionBy Ray Schmahl
The Glenwood Canyon is a 13 mile long river gorge formed by the Colorado River approximately 2 miles East of Glenwood Springs, Colorado and approximately 150 miles West of Denver Colorado, (See Drawin
Jan 1, 1990
-
Monitoring And Quality Control Of A 100 Metre Deep Diaphragm WallBy D. A. Bruce
To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic
Jan 1, 1989
-
Developments For Mitigating Measures From Deep Shafts Of North/South-Line AmsterdamBy Klaus Pöllath
This paper describes mitigating measures and the design of compensation grouting which will be executed from deep shafts of the Amsterdam North/South Metro line project. Due to the specific conditions
Jan 1, 2006
-
The Contest On The Prediction Of Capacity Of A Bored Pile Constructed Under Polymer-Based Slurry In Bangkok SubsoilBy Narong Thasnanipan
This paper presents the outcome of the contest on the prediction of the static axial load capacity of diameter 1.20m bored pile founded at 46m below existing ground. The test pile was constructed by w
Jan 1, 2006
-
CPT - Guided Installation Of Pressure-Grouted Displacement PilesBy Mark M. Petersen
As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven
Jan 1, 2002
-
A Review of Current Mexican Design Approaches for Cast-in-Place Drilled Shafts in Granular Soils under Axial LoadingBy Enrique Ibarra, Manuel J. Mendoza
"Abstract: This paper describes the current state-of-practice for the design of cast-in-place drilled shafts in granular soils under axial loading, addressing recent advances that take into account th
Jan 1, 2014
-
Underpinning Of Buildings During Tunneling Los Angeles Metro Rail System - SynopsisBy John A. Dal Pino
This paper describes two independent building underpinning projects during the construction of the Los Angeles Metro Rail System. The first project involves pinpile underpinning of a building along th
Jan 1, 1996
-
Limitations Of Predicting Deformations During Excavation In Soft Clay ? SummaryBy Richard J. Finno
Detailed measurements made at a test section adjacent to a deep braced cut and other published data are combined to illustrate the limitations of the common methods of predicting movements associated
Jan 1, 1991
-
Working Platforms In Geotechnical Jobs: Recommendations For Execution And MaintenanceBy Gustavo Armijo
Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha
Jan 1, 2006
-
New York City - A Review Of Various Foundation Problems And Solutions - SynopsisBy Mel Febesh
Working in New York City has become the graveyard of many Foundation Contractors. Varying subsurface conditions require Foundation Contractors to be aware of the conditions at each particular site and
Jan 1, 2000
-
Design Of Axially Loaded Compression Piles According To Eurocode 7By Bauduin C. Besix
The Eurocode 7 "Geotechnical Design" is based on "Limit State Design", tackling the uncertainties as much as possible at their source through: - selection of characteristic values of variables (load
Jan 1, 2002
-
Deep Mixing in the United States: Milestones in EvolutionBy Donald A. Bruce
"Abstract The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments we
Jan 1, 2014
-
Determining The End Bearing Capacity Of Steel Tube Piles Driven To Glacial Till In The Montréal Area Of CanadaBy Richard Deakin
This case study describes aspects of the design of bridge foundations using 320mm diameter steel tube piles in the vicinity of Montréal, Canada. In this area, these piles are a very commonly used and
Jan 1, 2011
-
Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The EurocodesBy Niels Krebs Ovesen
Close economic cooperation was established among the countries in western Europe during the seventies. As a consequence, among others, a need for harmonized technical specifications for civil engineer
Jan 1, 1994
-
Kinematic Load Tests On A Model Pile In ClayBy Michael J. Brown
Load testing is important for controlling the quality of piled foundations. The Statnamic test is an alternative to existing testing methods with a load duration that lies between that for static and
Jan 1, 2002
-
A Comparison Of Static And Statnamic Load Tests In Sand: A Case Study Of The Bayou Chico Bridge In Pensacola, Florida ? SummaryBy Michael D. Justason
This paper details the static and Statnamic load testing on a 600 mm square pre-stressed concrete pile. The pile was located at Pier 15 on the 20 million-dollar Bayou Chico Bridge Project in Pensacola
Jan 1, 1997
-
Lateral Dynamic Response Of Single Inclined PilesBy Amalia Giannakou
This paper utilises 3-D finite-element modeling to study the static and dynamic lateral harmonic response of inclined piles, in a homogenous and a non-homogenous soil, modeled as a linear hysteretic m
Jan 1, 2006
-
Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted PilesBy John F. MacDonald
From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn
Jan 1, 1990
-
Assessment Of The Risk Of Pile Driving To Juvenile Fish - The ProblemBy James J. Anderson
In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th
Jan 1, 1990