Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Magnetoflotation in Nickel Ore ProcessingBy Peter Wells, Adrian Sabau, Turgut Yalcin
"The nickel ores of Sudbury contain substantial amounts of the gangue mineral pyrrhotite (Fe7S&) which causes certain diflculties in the milling of these ores. This paper proposes a process called “ma
Jan 1, 1999
-
Seismic Risk Management at LaRonde MineBy Frederic M. Langevin
?? Introduction ?? LaRonde ?? History of Seismicity and Rockbursting ?? November 27th 2002 Rockburst ?? April 1st 2006 Rockburst ?? December 11th 2006 & January 11th 2007 Rockbursts ?? Seismic R
Feb 1, 2008
-
Variable speed SAG millingBy M. N. Brodie
"The ability to adjust the speed of a SAG mill offers benefits to the process and to equipment maintenance. It can be provided with some slight effect on availability ranging from somewhat enhanced to
Jan 1, 2003
-
Application of a kinematically admissible velocity field to the analysis of the arching phenomena in backfillsBy F. P. Hassani, H. B. Poorooshasb
"A kinematically admissible velocity field is applied to study the arching phenomenon in a cohesionless granular backfill placed between two rough vertical inflexible walls. The study is different fro
Jan 1, 1989
-
Treatment of Talcose Molybdenite OresBy G. I. Mathieu, R. W. Bruce
Flotation schemes for the separation of molybdenite from other minerals are based on utilizing the Inherent hydrophobicity of molygdenite (Fuerstenau1). This natural floatability was attributed to the
Jan 1, 1974
-
Flotation of REE Bearing Minerals from Silicate and Carbonate Host DepositsBy T. Deng
Flotation of rare earths is complicated by the number of mineral classes that carry rare earth elements, including carbonates, phosphates, and silicates that often co-occur within the same deposit. Ga
Jan 1, 2014
-
The True North orebody, Fairbanks District, AK: A distal Intrusion-related Au deposit. Kinross Gold CorporationBy P. W. Jensen
Gold deposits in Interior Alaska are commonly coincident in time and space with reduced, mid-Cretaceous granitoids. The True North deposit of the Fairbanks district is several km from such granitoids,
May 1, 2003
-
Unlocking Value through Flotation Equipment MaintenanceBy P. Tolvanen, A. Jalili
"When hard times strike in the mining cycle, sites tighten their belts and focus on lowering their unit costs. Lower unit costs can be achieved by reducing expenditure, increasing production, or by a
Jan 1, 2015
-
Participative Management at the Golden Giant Mill, A Co-Ordinators PerspectiveBy K. Barr, F. Grenier, J. Hettinger
"To reach the Hemlo Gold Inc. objective of becoming the lowest cost, safest Canadian gold producer while causing no environmental damage, management embarked from its inception on a strategy to build
Jan 1, 1988
-
Computer Control of Flotation at EcstallBy M. P. Amsden
"Ecstall Mining Limited, a subsidiary of Texas Gulf Incorporated operates the Kidd Creek Mine, a 10,000 tons per day base metal producer, near Timmins, Ontario. Two different ore types are mined and m
Jan 1, 1973
-
The Use of Computational Fluid Dynamics and Discrete Element Modeling to Understand the Effect of Cell Size and Inflow Rate on Flotation Bank Retention Time Distribution and Mechanism PerformanceBy Richard Peaker, Jens Lichter, Alexander V. Potapov
"The recent combination of Computational Fluid Dynamics (CFD) and Discrete Element Modeling (DEM) can provide considerable insight into the performance of flotation cells. One area of interest from a
Jan 1, 2007
-
Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale StudyBy Sunil Koppalkar, A. R. Laplante
"A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating
Jan 1, 2007
-
Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, YukonBy Nick D. Rose
The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,
May 1, 2002
-
Towards Sustainable Mining?Why TSM in Canada ?How it was developed ?Architecture and Goverance ?COI panel ?Performance indicators and how they work ?External Verification ?Reporting ?The national organization of the Can
May 1, 2011
-
Changes in grade, volume and contained gold during the mining life-cycle of gold placer depositsBy J. D. Bliss, G. J. Orris, W. O. Menzie
"Analysis of gold placer data from gold placers throughout the world suggests that gold grades and volumes cannot be used to distinguish between most types of gold placers. Only the alluvial plain and
Jan 1, 1987
-
Simulating the Mine-Mill InterfaceBy J. A. Meech, G. R. Baiden
"A dynamic simulation of a mine-mill complex has been conducted using networked microcomputers (IBM PC/AT and IBM PC/XT). These models allow simultaneous operation of an open pit using shovels and tru
Jan 1, 1987
-
Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines LimitedBy P. D. R. Maltby
"With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to
Jan 1, 1984
-
A History of Improvements at the Kemess ConcentratorBy Paul Grady, Martin Froehling, Curtis Mohns, Eliab Roman
"Since the idea of processing rock to unlock the valuable minerals inside was put into practice, efforts to improve production began. Methods have been learned that allow for operation in environments
Jan 1, 2005
-
Upgrading of aluminum dross by selective comminution and sizingBy K. J. Fair, H. W. Smith, D. R. Francis, J. M. Toguri
"Bench-scale batch milling and screening tests were carried out on secondary aluminum dross 10 produce an aluminum concentrate. To complement these tests, an analysis of a commercial plant was also pe
Jan 1, 1987
-
From Drill Core to Metal: A Multi-Disciplined Approach to Flowsheet DevelopmentBy Norman O. Lotter, Virginia Lawson, Mika Muinonen, Dominic Fragomeni, Jorge F. Oliveira
Development of metallurgical flowsheets from drill core to production of finished metal involves two main domains: process mineralogy to sample the ore and develop a successful flowsheet producing sal
Jan 1, 2014