Search Documents

  • CIM
    Restauration Du Site Minier Poirier (Joutel) - Expériences Acquises Et Suivi Des Travaux

    By Richard Maurice

    RÉSUMÉ La restauration du site minier Poirier, à Joutel s?est déroulée entre 1998 et 2001. Le principal élément des travaux a été la restauration du parc à résidus et des zones d?épanchement qui tot

    Nov 1, 2002

  • SME
    Lime Control System For Highly Alkaline Flotation Circuits ? Introduction

    By A. G. Moon

    Kennecott Copper Corporation's Chino Mines Division concentrator is located in Hurley, New Mexico. Construction of the concentrator was started in 1910 and its capacity was progressively increase

    Jan 1, 1976

  • SME
    George W. Luxbacher: An Interview With The 2008 SME President

    Talk some about your background. Mining, particularly coal, runs in the family. I come from a mining family, one generation re-moved. Both of my grandfathers worked in the coal mines. My mother?s

    Jan 1, 2008

  • DFI
    Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? Synopsis

    By T. Soejima

    In recent years, there has been a tendency in the field of foundation piling works to utilize piles of greater bearing capacity in order to meet increasing height and weight of modern building as a me

    Jan 1, 2010

  • SME
    Extensive Mechanization Produces Record Performance In Drill-Blast Tunnelling

    By Hans Hamrin

    Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed

    Jan 1, 1987

  • SME
    European Tunneling Technology And Methods

    By Brian Fulcher

    While tunneling in Europe has been a tradition for centuries, many companies and countries have embraced tunnel innovation with considerable vigor and creativity. Indeed, local needs and site conditi

    Jan 1, 2007

  • SAIMM
    Impact of Competent Persons’ judgements in Mineral Resources classification

    By K. Dagdelen , S. K. A. Owusu

    Uncertainty with regard to estimated grades and tonnages of a mineral deposit demands risk assessment in order to build investor confidence and attract the interest of other stakeholders in the succes

    Aug 8, 2024

  • AUSIMM
    The Utilization of Hydrogen and Carbon Monoxide in the Blast Furnace

    The variation of carbon monoxide and hydrogen utilization with the amount of the reductant in the blast furnace bosh gas was investigated for the No. 4 blast furnace at The Broken Hill Proprietary Co.

    Jan 1, 1975

  • AUSIMM
    Research on Universal Depressant of Talc and Serpentine

    Research on Universal Depressant of Talc and Serpentine

    Sep 13, 2010

  • DFI
    Numerical Analysis of Pile-Supported T-Walls Subject to Large Settlements and Flood Loading

    By Alexander B. Reeb, Richard J. Varuso, George M. Filz, Jehu B. Johnson

    "T-walls, which are concrete floodwalls in an inverted “T” shape, are an integral component of the Greater New Orleans Hurricane and Storm Damage Risk Reduction System (HSDRRS). In order to resist lar

    Jan 1, 2017

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • AIME
    Review of the Coal Industry in 1930

    By HOWARND N. EAVENSON

    THE year 1930 resembled the preceding one in the coal industry in continuing the era of falling prices and 'of the abandonment of unprofitable mines. Practically all coal prices fell, and in the

    Jan 1, 1931

  • NIOSH
    IC 6840 Review Of Literature On Effects Of Breathing Dusts With Special Reference To Silicosis - Part II-A - Chapter 4. Prevention Of Dust Diseases (Sections 1 And 2) - Introduction

    By D. Harrington

    As no cure is known for silicocis after it has developed, prevention is the only effective remedy. There are two main lines of approach to the problem of dust-disease prevention in industry - the engi

    Jan 1, 1935

  • NIOSH
    Nonfuel Minerals Survey Methods (f2684929-b1df-4583-81ba-3ba2aae2b64e)

    By William R. Vogel

    The Bureau of Mines Information and Analysis organization collects worldwide data on virtually every commercially important nonfuel mineral commodity. These data form the base for tracking and assessi

    Jan 1, 1989

  • DFI
    Some Experience With Large Diameter Caissons ? Synopsis

    By I. H. Wong

    The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee

    Jan 1, 2010

  • AUSIMM
    Flotation Optimisation Studies of the Perilya Broken Hill Lead Circuit

    By B Kilgariff

    Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at

    Jan 1, 2005

  • SAIMM
    Measurement of acoustic emission and interpretation of its results during excavation of a rock cliff with opening joints

    By H. Sasao, Y. Obara, A. Hirata

    In the upper part of the planned location of the portal of a highway tunnel, there was a steep rock cliff with several unstable rock blocks. It seemed that the risk of those rock blocks to fall was ve

    Jan 1, 2003

  • SME-ICGCM
    Design Of Longwall Extractions Under Flooded Abandoned Workings In The Sydney Coalfield

    By Peter Cain

    Longwall extraction in the Phalen Scam in the Sydney Coalfield of Nova Scotia is carried out under flooded abandoned workings in the Harbour Seam 140 m above, and at depth of up to 700 m beneath the A

    Jan 1, 1996

  • DFI
    Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled Shafts

    By Josef K. Alter

    Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr

    Jan 1, 2011

  • ABM
    Avaliação Dos Espaços Vazios Em Leito De Pelotas Cruas E Sua Relação Com Os Parâmetros De Controle Operacional Do Pelotamento Medido Em Pot Grate

    By Marcos Vinícios da Silva Cavalcante

    A permeabilidade de um leito de partículas esféricas é uma função direta dos espaços vazios, ?, formados pelo empacotamento destas partículas que compõe o leito. Na literatura são encontrados estudos

    Aug 16, 2017