Search Documents

  • SME
    Design of Large and Shallow Caverns of New York Second Avenue Subway

    By Verya Nasri

    The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f

    Jan 1, 2008

  • SME
    The Next Step Change In The Size Of Mining Projects

    Many of the world?s largest existing mines are considering substantial step changes in production volumes, compensating for declining ore grades while trying to address increases in world demand for r

    Feb 27, 2013

  • CIM
    Optimization of Water Supply and Reutilization in Base Metal Processing in Dry Regions

    By Raymond Philippe

    Background ?Hatch Water has worked with most major mining companies in Chile on water supply and optimization projects ?Many(copper) mining projects are located in Northern Chile, which hosts the

    May 1, 2009

  • NIOSH
    OFR-124-79 A Preliminary Study Of The Consequences Of Deep Ocean Mining Technology Transfer

    By P. B. Grote

    The report is concerned with the issue of the possible transfer of U.S. and other developed country deep ocean mining (DOM) technologies to developing countries. This subject is one of several major i

    Jan 1, 1978

  • TMS
    Processing Of Vanadiferous Residues To Ferrovanadium

    By R. Ressel

    Keywords: ferrovanadium, thermodynamics, phosphorus Recyclable material is rapidly gaining in importance as a source of raw materials in industrialized countries. This is also the case in the produ

    Jan 1, 2005

  • DFI
    Ground Movements - A Hidden Source Of Loading On Deep Foundations

    By Harry G. Poulos

    Ground movements can arise from a large number of sources and can have a significant effect on nearby piles and deep foundations. The loading of the piles by ground movements is a different mechanism

    Jan 1, 2006

  • DFI
    Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - Summary

    By William D. Spielvogel

    The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t

    Jan 1, 1994

  • NIOSH
    OFR-123(4)-81 Finite Element Analysis Applied To Resin And Mechanical Roof Bolting Systems For Strata Bound Deposits - Volume IV ? Appendix D - Listing Of Computer Program SAP-S - 1. Program Layout Of Subroutine

    By J. C. Gerdeen

    It is of upmost importance to keep the size of the program to a minimum for the computer being used. One way is to reduce the size of the data bank by adjusting the large common array A in the main pr

    Jan 1, 1976

  • AUSIMM
    An Update on the Geological Resource Map (Germ) Computerised Mineral Deposit Inventory Database

    The Geological Resource Map of New Zealand (GERM) is a computerised inventory of aggregate, mineral, coal, petroleum and thermal water occurrences, containing summary information on location, producti

    Jan 1, 1991

  • DFI
    Design Considerations For Underground Subway Station - Introduction

    By Mohammed Z. Islam

    As cities are growing all over the world, the need for urban transportation facilities are on the rise. Designers (of these facilities) today are faced with a number of constraints for their design, o

    Jan 1, 1993

  • NIOSH
    RI 7800 Degasification Of Virgin Pittsburgh Coalbed Through A Large Borehole (6080190f-0d98-45f0-83dd-b714a20ad923)

    By H. H. Fields

    The Bureau of Mines is in the process of degasifying a virgin area in northern West Virginia from the base of an 839-foot-deep vertical borehole¬. An in situ gas pressure hole 199 feet long, and seven

    Jan 1, 1973

  • DFI
    Sand Compaction Piles ? Synopsis

    By A. Holeyman

    The displacement compaction piles described in the paper are installed using a heavy casing or tube and an internal drop hammer. The casing which initially is closed at the bottom by a sand plug displ

    Jan 1, 2010

  • NIOSH
    IC 8166 X-Ray Mass Absorption Coefficients - A Literature Survey (12aff5f5-c7f5-442e-aa90-d2fc92f6ba01)

    By Howard M. Stainer

    Published X-ray mass absorption coefficients were compiled and tabulated. These coefficients are required for various X-ray analytical techniques. Values obtained from 28 authors are listed for 87 ele

    Jan 1, 1963

  • IIMP
    Sistemas de información en planta

    By José Arango

    La Planta Hidrometalúrgica de Cerro Verde tiene como objetivo alcanzar la máxima calidad en cada uno de sus procesos operativos. Para ello, desarrolla un diseño que permita la transformación del contr

    Jul 17, 2000

  • NIOSH
    OFR-11-84 Streamflow Estimation And Water Use Planning For Surface Mining In Northern Alaska ? Introduction

    The small-scale surface mining operation in northern regions is typically located in a remote, ungaged basin. With the recent increase in the economic potential of mining, the number of small operatio

    Jan 1, 1985

  • NIOSH
    RI 5665 Methods For Improving Quality Of Titanium Sponge Produced By The Kroll Process ? Summary And Conclusions

    By W. M. Mark

    This investigation was undertaken to develop methods to improve the quality of titanium sponge produced by the Bureau of Mines modification of the Kroll magnesium reduction process. Research revea

    Jan 1, 1960

  • NIOSH
    OFR-122(4)-80 Alumina Process Feasibility Study And Preliminary Plot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume IV - Appendix B - General Specification - Section 1 - Building Description

    1.0 Control House (DWG. NO. 56-401-G) - 1.1 Physical Description The Control House is a single story, 2728 square foot building with an adjacent transformer yard. A four foot overhang provides shad

    Jan 1, 1979

  • DFI
    Comparison Of Dynamic And Static Methods Of Evaluating Static Pile Capacity - Synopsis

    By Harpal Parmar

    This paper evaluates dynamic methods of pile capacity prediction by comparing their results to static load test results. Dynamic and static pile load test data were assembled from four southeastern st

    Jan 1, 1996

  • SME
    Projecting Copper Extractions And Shut-Down Criteria For Column Testing

    By E. Iasillo, R. R. Carneiro

    Independent of the method chosen to forecast production, an accurate method to project metal extraction is needed in order to accommodate leach cycles that exceed leach data on hand and thus be able t

    Jan 1, 2001

  • NIOSH
    IC 7610 Tunnel Construction By Peripheral Sawing At The Fort Randall Reservoir, Pickstown, S. Dak. - Introduction And Summary

    By Walter E. Lewis

    The Fort Randall Reservoir project, on the Missouri River at Pickstown, S. Dak., was designed by the Corps of Engineers and is part of the Missouri River Basin Development Program. The location of the

    Jan 1, 1951