Search Documents

  • NIOSH
    OFR-122(1)-78 Advancing Oil Shale Mining Technology: Program Evaluation - Executive Summary

    By G. F. Kuncir

    The analysis summarized herein evaluates the Bureau of Mines Program for Advancing Mining Technology Oil Shale in terms of the economic benefits which may be derived for the Nation as a result of its

    Jan 1, 1977

  • DFI
    Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting

    By Peter J. Nicholson

    A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th

    Jan 1, 1998

  • NIOSH
    OFR-82(1)-75 Probe Drill Guidance System - Volume 1

    By Llewellyn A. Rubin

    Under Bureau of Mines Contract H0122007, Telcom, Inc., with the assistance of Fenix & Scisson, Inc., conducted a 17-month research and development project aimed at provid¬ing a field-test model of a g

    Jan 1, 1973

  • NIOSH
    OFR-44-78 Assessment Of Research And Development Needs And Priorities For Acid Mine Drainage Abatement

    By Virginia E. Gleason

    In this report, recommendations are made for programs to develop workable techniques to stop or prevent acid mine drainage formation in those underground coal mines where acid production could take pl

    Jan 1, 1978

  • NIOSH
    RI 7817 Use of Char To Improve Physical Quality of Coke From Sunnyside (Utah) Coal

    By Charles C. Boley

    Using bench-and pilot-scale coking facilities, the Bureau of Mines produced experimental coke from blends of char with Sunnyside coal (high-volatile A bituminous) from Carbon County, Utah. At bench sc

    Jan 1, 1973

  • AUSIMM
    Innovative Treatment of Gold Mine Water for Sustainable Benefit ù Processes and Case Studies

    Gold mines produce unique water treatment requirements. This paper focuses on case studies of innovative processes used for treatment of water resulting from gold mining and processing. The case studi

    Jan 1, 2007

  • SAIMM
    Some Considerations On Future Developments In Ferro-Alloy Furnaces

    By I. J. Barker

    Keywords: Submerged-arc furnace, plasma furnace, d.c. furnace, scale up, Søderberg electrodes, smart grid, demand side management, load shedding This paper argues that the scale up of furnaces and

    Jan 1, 2011

  • CIM
    Methodology to Control and Prevent AG Precipitation in Cyanidation Circuit Using UV Spectrophotometry

    By K. Morin

    "Silver and gold leaching by cyanidation is a well-known process used around the world. This reaction is often accompanied by the leaching of other species throughtout the cyanidation circuit that cau

    Jan 1, 2014

  • SME-ICGCM
    Detection of Abandoned Mines and Air Passages/Burning Centers of Mine Fires by Combined Electromagnetic Method

    By Shu Yan

    The high resolution resistivity method (HRRM) is developed specifically for detecting underground cavities and tunnels. HRRM has a special feature in that it can recognize and cancel static shift, whi

    Jan 1, 2005

  • SME
    Repair the Fan, Save Money

    By Thomas J. Kuli, Tim Rape

    When a fan or blower breaks down or becomes worn, customers have two choices. They can replace it or they can have it repaired. In the past, replacement was the preferred option, especially when the

    Jan 1, 2005

  • DFI
    Construction And Instrumentation Of A Deep Foundation ? Synopsis

    By Y. K. Wong

    This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment

    Jan 1, 2010

  • SME-ICGCM
    Applications of Microseismic Monitoring in China?s Underground Coal Mines

    By Xiangxi Wu

    Longwall and continuous mining are prevalent methods employed by Chinese underground coal operations. The main ground control challenges include roof skin deformation, roof collapse, and outbursts of

    Jan 1, 2012

  • DFI
    Quality Assurance Of Augercast Piles With Computerized Monitoring - Summary

    By Bill Starke

    The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c

    Jan 1, 1997

  • SME
    Computerized Design Of Comminution Circuits

    By J. A. Herbst

    A state of the art computer simulation package, named UTAH-MODSIM is being developed. This package can run on a mainframe (eg. UNIVAC) as well as on a microcomputer (eg. IBM/PC with at least 512 kByte

    Jan 1, 1986

  • SME
    Invensys’ User Conference Discusses Plant Automation and Control

    By Steve Kral

    Invensys is a London-based supplier of automation and control systems to a variety of manufacturing and processing industries. Through its global subsidiaries, Invensys provides customized, advanced

    Jan 1, 2002

  • SAIMM
    Petrological Characterization Of Coal: An Evolving Science

    By J. M. Richards

    For most of the 20th century optical petrography has been the primary petrological and mineralogical tool used to characterize coal. The development of quantitative SEM-based techniques, e.g. QEMSCAN®

    Nov 1, 2013

  • AUSIMM
    The George Fisher Project to Increase Recovery in the Mount Isa Lead/Zinc Concentrator

    By K S. Fisher, J D. Pease

    The installation of the George Fisher flowsheet in the lead/zinc concentrator at Mount Isa Mines Limited has recently been completed. The George Fisher flowsheet involved moving flotation capacity fro

    Jan 1, 2000

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • AUSIMM
    Estimating the Cost of a Feasibility Study for a Mining Project

    The cost of preparing a feasibility study is notoriously difficult to estimate. Studies for mining projects are typically commenced when an exploration programme has identified a mineable resource a

    Jan 1, 1990

  • CIM
    The Recovery of Zinc and Lead from Blast-Furance Slag at Trail, B.C.

    By G. E. Murray

    Introduction The development of the method for recovering zinc from lead blast-furnace slags at Trail is interesting and important in the history of both lead and zinc metallurgy. Many efforts have

    Jan 1, 1933