Search Documents

  • SME
    Improving Storage And Handling Of Ores In Mining And Processing Operations

    By Jayant Khambekar

    In a typical mining operation, run-of-mine (ROM) ore is crushed and screened to achieve a desired particle size distribution and then fed to processing equipment for further refining. For an operatio

    Jan 1, 2009

  • IOM3
    Mathematical model of the dense-medium drum

    By P. J. Baguley

    The model has been developed on the basis of the observation that the partitioning behaviour of a particle is related to its calculated terminal velocity. It utilises a theoretical calculation of the

    Jun 18, 1905

  • CIM
    Achievement of High Energy Efficiency in Grinding Mills at Santa Rita

    "Horizontal grinding mills have been used in the mining industry for more than a century, and due to their operational and maintenance simplicity they remain a widely used technology for various stage

    Jan 1, 2013

  • NIOSH
    OFR-3(1)-85 Caving Mine Rock Mass Classification And Support Estimation - Volume I - Final Report

    By Robert A. Cummings

    A rock mass classification system has been developed for recommending drift support requirements in block caving mines. This development follows a two-year program incorporating field observations of

    Jan 1, 1984

  • SAIMM
    A Rock Mass Rating System For Evaluating Stope Stability On The Bushveld Platinum Mines

    By B. P. Watson

    Several large falls of ground occur annually in the narrow, tabular stopes mined in the Bushveld Complex. These falls comprise safety risks and cause substantial production losses and compromise effor

    Jan 1, 2004

  • AUSIMM
    Paper No. 127. Presidential Address.

    Taking the Presidential chair of the Australasian Institute of Mining Engineers, my first duty is to thank you for the high honour and position you have conferred on me. A position entailing the highe

    Jan 1, 1903

  • SAIMM
    Fan-Structure Shear Rupture Mechanism as a Source of Shear Rupture Rockbursts

    By B. G. Tarasov

    This paper proposes the further development of a recently identified shear rupture mechanism (fan mechanism) that elucidates a paradoxical feature of hard rocks ? the possibility of shear rupture prop

    Jan 1, 2014

  • SME
    Precious Metal Heap Leaching In A High Rainfall Alpine Setting At The Barrick Gold Pierina Mine In Peru

    By G. Bee, Z. Gavelan, R. Espinel, Y. Roditis, X. Ochoa

    In August 1996 Barrick Gold Corporation acquired the Pierina property, an advanced stage exploration project, high in the Andean Cordillera of Peru and in November 1998, in a record time of just over

    Jan 1, 2002

  • AUSIMM
    Advances in Continuous Miner Automation

    This paper describes new research and development currently being undertaken by the CSIRO Mining Technology Group to advance the automation capability of continuous mining equipment in underground coa

    Dec 6, 2010

  • SME-ICGCM
    In-Seam Seismic Tomography Mapping Application To Coal Mining Problems

    Continuing with the effort of providing new and more effective exploration methods to the mining industry, where direct methods (drilling, cross-cutting, etc.) are not applicable, either for logistica

    Jan 1, 1996

  • SME
    Stages Of Economic Development And The Demand For Agricultural Minerals

    By M. C. Roberts

    As nations advance through various stages of economic development, the patterns of demand for minerals change. For example, as a nation develops from a subsistence economy through industrialization a

    Jan 1, 2001

  • AUSIMM
    High accuracy .D airborne electromagnetic inversion method for banded iron formation and other geological settings

    By D FitzGerald, S Jakica, R Paterson, J Silic

    A new 2.5D airborne electromagnetic (AEM) algorithm has been developed by Intrepid Geophysics and Jovan Silic & Associates. The advantage of 2.5D (2D geology, 3D source) AEM inversion in 3D geolog

    Jul 24, 2017

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • SME
    Underground Construction Is Crucial To Success Of Olympic Games Venues

    When the 2008 Olympic Games begin in Beijing, China is September it will not only mark the end of the journey for the Olympic torch and the thou-sands of participating athletes, but the games will als

    Jan 1, 2008

  • SAIMM
    Evaluation of the Spatial Variation of Bvalue

    The estimation of the spatial variation of the b-value of the Gutenberg- Richter relationship is important for both the general interpretation of the mechanism of rock mass response and seismic hazard

    Jan 1, 2014

  • NIOSH
    IC 8408 Impact Of Petroleum Development In The Gulf Of Mexico

    By L. K. Weaver

    Bureau of Mines investigated the progressive impact that petroleum (crude oil and condensate) operations in the Gulf of Mexico have had on onshore operations and the expected effect of increasing acti

    Jan 1, 1969

  • SME
    Cost Analysis for the Design and Operation of Sublevel Open Stoping

    By P. K. Chatterjee, G. D. Just

    Sublevel open stoping is a low-cost method that has been successfully employed in many large underground mining operations. Where ore body characteristics are suitable, extensive mechanization and the

    Jan 10, 1981

  • AUSIMM
    Development of Stockton Borehole Colliery

    The early history of the mine is traced from the beginning of shaft sinking in 1886 to the purchase by the Broken Hill Proprietary Co. Ltd. in 1949. A necessary preliminary to mechanisation of the Bor

    Jan 1, 1957

  • CIM
    Implementing Safe Production at Kittilä Mine

    The information in this document has been prepared as at February 16, 2011. Certain statements contained in this document constitute ?forward-looking statements? within the meaning of the United State

    May 1, 2011

  • AUSIMM
    Iron ore grade modelling using geostatistics and artificial neural networks

    By B C. Sarkar, D Ray, V Sarkar, P K. Sinha, R K. Singh, A Kumar

    Estimation of iron ore grade distribution has been attempted using geostatistics and artificial neural network (ANN) based models for a banded iron formation (BIF) type iron ore deposit of East India.

    Jul 24, 2017