Search Documents

  • CIM
    When does a project with Questionable Viability, Warrant Further Investment?

    By David Whittle

    When does a project with questionable viability, warrant further investment? There are cases in which projects, which evaluate to a negative mean probable value, are worth investing in. There are al

    May 1, 2006

  • TMS
    Converting and Refining – Experience in Ferrous and Non-Ferrous Metallurgy

    By Cajsa Samuelsson, Theo Lehner

    Converting and refining play a central role in the extraction of metals. Sweden has a long tradition as an experimental play ground for metallurgists, chemists and alchemists, developing new methods a

    Jan 1, 2009

  • SME
    Performance Analysis Of Resin And Mechanical Anchorage Bolting Systems

    To build an effective entry roof beam, a roof bolting or supporting system must be of the ability of providing a clamping force to the bolted roof strata. Currently, two roof bolting systems are widel

    Jan 1, 2011

  • AUSIMM
    Multi and Synchroblasting – maximising operational productivity

    By G Wyartt

    Systems such as Davey Bickford’s Daveytronic® SP blast initiation system and electronic detonators have been an integral part of drill and blast activities in Australia for over a decade, with th

    Jul 24, 2017

  • DFI
    Dynamic Pile Testing - The Caltrans Results - Dynamic Pile Testing - Who Needs It?

    By G. G. Goble

    Dynamic pile testing is now over 20 years old as a routinely applied tool for evaluating driven pile installation. The first test on a cast-in-place pile was performed more that 15 years ago. The rese

    Jan 1, 1993

  • SME
    Steel Linings In Vertical Openings

    By James W. Harrower, Gerald S. Ball

    This paper discusses the installation of steel linings in vertical, raisebored openings. Design criteria used to evaluate the applicability of liner type and design are presented as well as a brief de

    Jan 1, 1985

  • CIM
    Simultaneous Optimization of Ultimate Pit and Production Scheduling Using a Heuristic Approach

    By A. K. Mahto, B. Samanta

    "A heuristic model was developed to simultaneously generate the ultimate pit and production scheduling at a mining project. The method consists of a preprocessing step to select a starter pit, the imp

    Jan 1, 2017

  • NIOSH
    RI 4306 A Combination Cleaning And Dewatering Process For Treating Fine Sizes Of Coal

    By B. W. Gandrud

    To say that the treatment and handling of the "fines" is the most difficult phase of coal preparation is probably an understatement of facts. It is the fine sizes from about 1/16-inch to 0 that are ma

    Jan 1, 1948

  • NIOSH
    Carbonizing Properties: Chilton Coal From Lorado No. 5 Mine Lorado, Logan County, W. Va. - Introduction And Summary

    By J. D. Davis

    THE CARBONIZING properties of Chilton-bed coal from Lorado No. 5 mine, HE Logan County, W. Va., were determined by Bureau of Mines-American Gas Association tests at 600°, 700°, 800°, 900°, and 1,000°

    Jan 1, 1951

  • ABM
    Utilização De Mistura De Areias Usadas Fenólica E A Verde De Fundição Na Fabricação De Blocos De Concreto Para Pavimentação

    By Leandro Moosher

    A crescente geração e disposição de resíduos sólidos tornou-se preocupante, para tanto busca-se um fim adequado aos mesmos. Este trabalho objetivou avaliar a viabilidade técnica, ambiental e financeir

    Aug 8, 2018

  • ABM
    Caracterização De Escórias Para Slag Splashing Na Aciaria Da Ternium Brasil

    By Breno Totti Maia, Rubia Teodoro Silva, Daniel A. G. de Carvalho, Aline Lima da Silva, Gilvan Nascimento de Souza

    Para a maior eficiência na técnica conhecida como Slag Splashing, empregada com fins de manutenção e reparo de refratários de convertedor LD, a escória deve apresentar características apropriadas em t

    Oct 1, 2019

  • CIM
    System drivers in the performance of auxiliary ventilation systems

    By I. R. Muirhead, S. Frimpong

    "The mechanization of mining operations in underground coal mines has led to faster cutting rates of coalfaces with increased levels of emission of gaseous and particulate contaminants in the workings

    Jan 1, 2003

  • AUSIMM
    Exploration for Platinum Group Element Deposits in Mafic and Ultramafic Rocks

    Platiniferous horizons such as the Merensky Reef that are mined chiefly for their PGE contents constitute one end member of a continuum of Ni-Cu-PGE sulfide deposits; Ni-(Cu) sulfide deposits in which

    Jan 1, 2002

  • AIME
  • AIME
    Canal Zone Paper - Method of Determining the Meridian from a Circumpolar Star at any Hour

    By Eugene R. Rice

    There are many methods for determining the meridian, but all of those in common use involve at least two separate observations, one for latitude and one for azimuth. Such observations made upon a sout

    Jan 1, 1911

  • AUSIMM
    Episulphide-Based Reagent for Zinc Sulphide Flotation Without Copper Sulphate

    Results of laboratory studies on the flotation of marmatite (zinc sulphide) with new reagents, which were developed to avoid the use of copper sulphate, are presented.Episulphides were chosen as the b

    Jan 1, 1974

  • AIME
    Natural Gas Technology - Application of the Alternating Direction Explicit Procedure to Two-Dimensional Natural Gas Reservoirs

    By P. K. Leung, S. R. Allada, P. M. Dranchuk, D. Quon

    The alternating direction explicit procedure (ADEP) makes use of the boundary conditions to reduce multi-dimensional problems to a series of one-dimensional problems. The method, previously applied to

    Jan 1, 1967

  • NIOSH
    Ergonomic Risk Factors – A Study Of Heavy Earthmoving Machinery Operators

    By N. Kumar Kittusamy

    ALTHOUGH MANYSTUDIES HAVE SHOWN an association between operating heavy construction equipment and symptoms of musculoskeletal disorders (MSDs), little research has been performed that systematically c

  • SAIMM
    Optimal Coal Processing Route For The 3 X 0,5 Mm Size Fraction? - Introduction

    By Jeremy Bosman, Johan de Korte

    Traditionally the feed to coal preparation plants was de-slimed at 0,5 mm. The +0,5 mm size fraction was processed via dense-medium cyclones and the -0,5 mm size fraction was beneficiated with froth f

    Jan 1, 2006

  • TMS
    Experimentally Determined Rock-Fluid Interactions Applicable to a Natural Hot Dry Rock Geothermal System

    By R. W. Charles

    The Los Alamos National Laboratory, under the sponsorship of the U.S. Department of Energy; is involved with laboratory and field experiments to assist in development of the Hot Dry Rock concept of ge

    Jan 1, 1981