Search Documents

  • AUSIMM
    Estimating the Cost of a Feasibility Study for a Mining Project

    The cost of preparing a feasibility study is notoriously difficult to estimate. Studies for mining projects are typically commenced when an exploration programme has identified a mineable resource a

    Jan 1, 1990

  • DFI
    Deep Foundation Shoring in South Florida

    By Douglas C. Brunot

    Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w

    Jan 1, 2018

  • IIMP
    Using integrated GPS, Wireless Communication and Computing Technologies to Lower Mining Costs

    By Javier A. Llano

    GPS, wireless communications and on-board and off-board computing capabilities provide today’s mining companies with unprecedented process improvement and cost reduction opportunities. All aspects of

    Jul 17, 2000

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • SME
    Computerized Design Of Comminution Circuits

    By J. A. Herbst

    A state of the art computer simulation package, named UTAH-MODSIM is being developed. This package can run on a mainframe (eg. UNIVAC) as well as on a microcomputer (eg. IBM/PC with at least 512 kByte

    Jan 1, 1986

  • ISEE
    Dynamic Stress Field around a Blast Hole – A Laboratory Study

    By R. Raghavaraju

    Estimation of the dynamic stress field in terms of its amplitude and decay around a blast hole is a key input parameter in all numerical modeling and blast prediction exercises. However, there is very

    Jan 1, 2014

  • TMS
    Recovery of Components and Valuable Metals from Printed Circuit Boards

    By A. Gibson

    Most methods for the treatment of scrap printed circuit boards do not reclaim the components in working order as the boards are either fed to a copper smelter, to recover the valuable elements, or, si

    Jan 1, 2009

  • AUSIMM
    Analyses of Some New Zealand Scheelites

    Analyses of scheelite from all the known scheelite fields in the South Island of New Zealand have shown that the scheelites are essentially molybdenum-free. The scheelites are almost stoichiometric Ca

    Jan 1, 1970

  • CIM
    The Recovery of Zinc and Lead from Blast-Furance Slag at Trail, B.C.

    By G. E. Murray

    Introduction The development of the method for recovering zinc from lead blast-furnace slags at Trail is interesting and important in the history of both lead and zinc metallurgy. Many efforts have

    Jan 1, 1933

  • ISEE
    Alternatives to Shovel/Truck Pre-Stripping: Three Case Studies

    By Richard R. Marston, Scott Herr, Steve Pries, Donald L. Jr Ewart

    The purpose of this paper is to identify and examine alternative methods (other than shovel/truck stripping) of effecting the pre-stripping of consolidated overburden, in conjunction with dragline str

    Jan 1, 1992

  • SAIMM
    Utilisation Of The Mineral Density Separator In The Coal Industry

    The Mineral Density Separator (MDS) was developed by Mintek to predict mineral separation in a plant, evaluate efficiencies and develop scale-up parameters. This study investigated the influence of pa

    Jan 1, 2006

  • AUSIMM
    Underground Organization

    IN the underground department of a mine, we may fairly say that "good management is based upon three elementals: first, sound engineering; second, proper coordination and efficiency of every huma

    Jan 1, 1912

  • AIME
    Institute of Metals Division - Increased Martensite Formation Temperature in Thin Films (TN)

    By H. Warlimont

    In recent investigations of the microstructure and crystallographic features of martensite by electgon microscopy,', '9 thin films (about 50 to l000A in thickness) have been used as specimen

    Jan 1, 1962

  • SME
    Geotechnical Exploration For The H-3 Highway Trans-Koolau Tunnel

    By Lee W. Abramson, William H. Hansmire

    The H-3 Project is planning, design, and construction of a 10-mile (16 km)-long final segment of new highway that traverses the Koolau mountain range in Oahu. Interstate H-3 traverses North Halawa Val

    Jan 1, 1989

  • NIOSH
    RI 7624 A Thousand-Ton Capacity Stiff Testing Machine

    By F. G. Horino

    This report presents the theory and design of a stiff loading machine used by the Bureau of Mines. The machine incorporates three high-strength steel columns as the restraining member in parallel with

    Jan 1, 1972

  • CIM
    The Afton Concentrator

    By J. Lovering, M. Allan

    "INTRODUCTIONThe Afton Mines property is located 180 air miles east-northeast of Vancouver and nine miles west of Kamloops, a city of 60,000 people in south central British Columbia. The deposit is lo

    Jan 1, 1979

  • ISEE
    Methods of Evaluating and Predicting Fragmentation

    By Claude Cunningham

    The primary reason for blasting is to fragment rock. In production blasting, the fragment sizes produced are known to exercise an overwhelming influence over working costs: handling costs and tonnage

    Jan 1, 1995

  • RMCMI
    Can Behavioral Safety Reduce Injuries in Mining?

    By Grainne A. Matthews

    Jan 1, 2009

  • CIM
    Improving Raisebore Stability Assessments and Risk

    By B. M. Coombes

    The McCracken and Stacey (1989) method of assessing geotechnical risk for largediameter raisebored shafts has been the basis for most Australian pre-construction raisebore investigations for the past

    May 1, 2011

  • AIME
    Gold and Silver Operations in Australia and Adjacent Lands

    By M. W. BERNEWITZ

    AUSTRALIANS and New Zealanders, whose countries have respectively yielded gold to the value of £666,000,000 and £96,000,000, are taking full advantage of the current high prices for that metal. There

    Jan 1, 1934