Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Short-Delay Blasting At Anaconda's Berkeley Open-Pit Mine, MontanaBy Lewis L. Oriard
The authors outline the development and application of blasting methods put into use 11 years ago at the Berkeley Open-Pit Mine, Butte, Montana. The blast design uses a very short delay (5 millisecond
Jan 1, 1980
-
Small Changes In Continuous Mining Section Layouts Can Result In Significant Improvements In ProductivityBy E. Topuz
This paper discusses factors affecting the productivity of continuous coal mining operations. It analyzes design and operational relationships in continuous mining systems, and investigates how their
Jan 1, 1987
-
The Colloid Chemistry And Flotation Properties Of Primary Aliphatic MinesThe molecular form of aliphatic amines precipitates in alkaline solutions when the amine solubility limit is exceeded and forms a typical colloidal system. The zones of mines precipitation and micelli
Jan 1, 1989
-
Employing a Unique Procurement Process for the City of Ottawa Combined Sewage Storage TunnelBy Bauer, Steve, Colin Goodwin, Gerald, Randy Dempsey, Courtland
"The City of Ottawa’s Combined Sewage Storage Tunnel consists of two interconnected tunnels totaling 6.2 km with a diameter of 3m including access shafts and hydraulic structures which connect to the
Jan 1, 2016
-
How Far Does Gy's Theory Go Toward Fulfilling The Role Of A General Particulate Material Sampling Theory? - The Lack Of A Generally Accepted TheoryBy R. A. Bilonick
Sampling is used in all scientific, engineering, marketing, and financial disciplines. The scientific theory of probabilistic sampling is a well established field, providing a general framework for ba
Jan 1, 1986
-
Processing Diasporic Bauxites The Greek Bauxite CaseBy George D. Coumoulos
The following aspects of diasporic bauxite are discussed: The importance of world reserves of diasporic bauxites; the geological, chemical and mineralogical characteristics of the Greek diasporic b
Jan 1, 1984
-
Short History Of Man And GoldBy Thomas V. Mullen
Some 146 kt (4.69 billion oz) of gold have been mined throughout history. Of this, 70% has been mined in this century alone, with 17% produced from 1985 through 1996 (Fig. 1 and Table 1). Until the m
Jan 1, 1998
-
Experimental Investigation on the Static Shear Stiffness of an Immersion JointBy Yong Yuan, Wenhao Xiao, Luc Taerwe
"The static shear stiffness of an immersion joint subjected to combined compression and shear forces is investigated by experiments in a test set-up. To explore the performance of the immersion joint,
Jan 1, 2016
-
Analytical Approaches To Organic Matter In Ore DepositsBy Andrew P. Gize
The analytical approaches used to solve a specific problem are dependent upon the information required, coupled with limitations imposed by available facilities, costs, and time. The organic matter as
Jan 1, 2013
-
Radium-Bearing Waters In Coal Mines: Occurence, Methods Of Measurement And Radiation HazardBy Ireneusz Tomza, Jolanta Lebecka
INTRODUCTION Radioactive deposits were observed in 1972 in some of the Upper Silesian coal mines. They were located mainly in the drains in galeries and on the inside surfaces of water pipes. They
Jan 1, 1981
-
The Use Of New Microtunneling Technology To Excavate Hard Rock In A Mining ApplicationBy D. G. Abbott
This paper will describe the development, testing, performance evaluation, and in particular, the utilization for a mining application of revolutionary new mini-disc cutters for use in micro-tunneling
Jan 1, 1996
-
Examination of Copper Electrowinning Smoothing Agents. Part I: A reviewBy M. S. Moats, A. Luyima, W. Cui
"Organic smoothing additives are used to produce dense, thick, high-quality cathodes in copper electrowinning. Glue had been used traditionally and is still used in operations that do not employ solve
Jan 1, 2016
-
Managing the development of secondary drawpoints in high stress areas at Goldex Mine RaSiM10 (Rockburst): 2022 ProceedingsBy Véronique Falmagne, Chantale Doucet, Thomas Côté
Production began in the Deep 1 zone of Goldex mine in 2017 at a depth of 1,200 m. Stope dimensions are 50 m high by 22 m wide (along strike) and the panel thickness varies between 22 to 35 m. The Deep
Apr 26, 2022
-
Research And Development - Key To Advances For Rapid Excavation In Hard RockBy Thomas C. Atchison, James J. Olson
INTRODUCTION Technologic progress depends on new and innovative ideas, the practical application of these ideas, and finally as the technology is developed and demonstrated, the engineering improve
Jan 1, 1997
-
In Situ Geophysical Investigation To Evaluate Dynamic Soil Properties At The Ilarionas Dam, Northern GreeceBy P. Soupios
Seismic geophysical methods have long been used by geologists and geophysicists to delineate subsurface features. These techniques work because different types and strengths of soil and rock transmit
Jan 1, 2006
-
Use of Innovative Techniques and Tools on a Massive Tunnel Project"There’s no fast way to add more than four miles of track, most of it underground, to the Sound Transit Link Light Rail system in the Seattle area. But increasingly busy traffic through a number of ne
Jan 6, 2018
-
Industrial Mineral Investment - Fact And FantasyBy Robert M. Dreyer
In an industrialized nation, as the process of industrialization continues, the ratio of the value of production of non-metallic to metallic minerals normally increases gradually over a period of year
Jan 1, 1964
-
The Effect Of Coal Preparation On Power Plant Fuel Cycle Cost Measured At The Bus BarBy W. V. Bluck
Higher coal quality is being recognized in potentially lowering the cost of power as measured at the bus bar. Assessment of potential coal supplies for most any given power plant is now going beyond b
Jan 1, 1983
-
Transportation (2616247e-7bb7-4df8-829d-dea2ab88a8d0)By John C. Draper
The principal object of an underground coal mine transportation sys- tem is to move coal from the face where it is produced to the outside of the mine where it is prepared for market. In addition to t
Jan 1, 1981
-
Preparation Of Short-Range Mining Plans By Computer At The Utah Mine Of Kennecott Copper Corporation ? I. IntroductionBy John Duff Erickson
Computer use has become an integral part of mine planning at Kennecott Copper Corporation?s Utah Copper Division, Bingham Canyon mine. Engineers are using the computer for development drilling calcula
Jan 1, 1966