Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Transition and optimization of the Henderson mine ventilation systemBy C. Rutter, N. SHEA, K. KOLOBE
Henderson Mine’s primary production transitioned from the main portion of the 7700 level to the 7210 main panel in 2005. On the 7700 level, the southwest (SW) panel was brought into production in 2014
-
Scalable Framework for Worker Safety Assessments Inspired by Navajo Nation Mine Reclamation - SME Annual Meeting 2026By Ashley Woodward, S. Katharine Hammond, Mayela Padilla-Salas
This paper presents a scalable framework for worker safety assessments. The paper focuses on uranium mine reclamation in underserved communities, specifically Cove Chapter of the Navajo Nation. By int
Feb 22, 2026
-
Stability analysis comparison of conventional valley-fill to geomorphic landform designs - SME Transactions 2014By H. Russell, N. DePriest, J. D. Quaranta
Valley-fill structures built of blasted rock overburden from Appalachian mountaintop surface mines pose many reclamation challenges. The steep mountainous terrain, short valley lengths, and straight s
Jan 1, 2014
-
Newmont’s Yanacocha Project: The Joint Venture Three Years LaterBy L. Harris
The Yanacocha project is the first foreign investment in Peruvian mining since Cuajone during 1976. Three years after the project began, it has become the largest producer of gold from heap-leach ope
Jan 1, 1996
-
Production, consumption and cost of energy for surface mining of bituminous coalBy V. Kecojevic
The objective of this research was to establish the relationship between production, consumption and energy cost in the surface mining of bituminous coal. Specific energy sources such as diesel, gasol
Jan 1, 2014
-
Current trends in US coal mine intersection support and roof falls - SME Transactions 2009By A. J. S. Spearing, A. Mueller
The support of intersections in coal mines remains an important safety issue, mainly because the large diagonal span compromises the stability of the roof. This structural weakness is further exacerba
Jan 1, 2009
-
Reducing Mercury Production At Bald Mountain MineBy J. Wickens
This paper discusses how Bald Mountain Mine dramatically reduced mercury production by treating process solutions with a liquid reagent called UNR 811A. The reagent is marketed by Cherokee Chemical C
Jan 1, 2001
-
Discussion - On nonnegative weights of linear kriging estimationBy Y. C. Kim, F. Szidarovszky
G.M. Philip and D.F. Watson The article cited above reflects the difficulty that is often encountered in interpreting different aspects of kriging. Baafi et al. write : "Due to negative kriging wei
Jan 2, 1987
-
Mills For Remote SitesBy Christopher J. Farrow
This paper describes the grinding circuits installed at two remote sites in northern Canada. One is Cominco's Polaris Project at Little Cornwallis Island; a barge-mounted lead/zinc concentrator.
Jan 1, 1983
-
Crushing Grinding And Concentrating At Mount WrightBy David Runnels
In September 1970, the Quebec Cartier Mining Company, started development of the Mount; Fright iron ore mine. The estimated ore reserve is in excess of 1,000,000,000 long tons with an average grade of
Jan 1, 1977
-
MINER Act technology; Past, present and the futureBy Rohan Fernando, David P. Snyder, John F. Burr, Susan M. Moore
"The Mine Improvement and New Emergency Response Act of 2006 (MINER Act Public Law 109-236) was passed by Congress in response to three major underground coal mine accidents in the United States that
Dec 1, 2016
-
Engineering & Design Considerations Scale-Up To 1000 Cu Ft Flotation MachinesBy V. R. Degner
The trend in both the metallic and non-metallic mining industry is toward processing increasing y higher tonnages of lower grade ores, thereby resulting in a growing interest in progressively larger v
Jan 1, 1978
-
Bureau Of Mines Coal-Fired Gas Turbine Project ? SummaryBy Donald C. Strimbeck
The Bureau of Mines, U.S. Department of the Interior, is conducting research and development on a coal-burning gas turbine. This work includes the development of (1) turbine blades resistant to coal a
Jan 1, 1964
-
Investigation of Explosion Hazard in Longwall Coal Mines by Combining CFD with a 1/40th‑Scale Physical Model (Mining, Metallurgy & Exploration)By A. Juganda, F. WILSON, H. PINHEIRO, N. SANDOVAL, J. F. Brune, G. E. Bogin Jr.
To evaluate methane explosion hazards in longwall coal mines, a CFD model was developed along with a 1/40th-scale, optically accessible model of an underground longwall coal mining section. In this pr
Aug 15, 2022
-
Effect of Bucket Geometry, Machine Variables, and Fragmentation Size on Performance of Rubber‑Tired Loaders - Mining, Metallurgy & Exploration (2022)By Atta Ur Rehman, Kwame Awuah‑Offei
This paper examines the effect of bucket geometry (cutting blade profile, floor profile, and blade thickness), speed, motor power output, and muckpile particle sizes on bucket penetration and draft fo
Oct 29, 2021
-
Performance of Tunnel Segments Reinforced with Synthetic Macro Fibers - RETC2021By Todd Clarke, Ralf Winterberg
For more than a decade the tunneling industry has explored the potential and benefits of macro synthetic fiber (MSF) reinforced concrete solutions for precast tunnel segments. Parallel to industry inv
Jun 13, 2021
-
Numerical Study of Pillars Behavior in Continuous Miner Depillaring Panel: A Case StudyBy Shailendra Chawla, Ashok Jaiswal, B. K. Shrivastva
The study aims to evaluate the pillar behavior during the depillaring operation by continuous miner (CM) technology. A panel with five headings developed as per the coal mine regulation of Indian coal
May 8, 2022
-
A Novel Approach in Predicting Dump Truck Tyre Life in a Mine Based on Multilayer Perceptron Neural Network Optimised with Particle Swarm Optimisation - Mining, Metallurgy & Exploration (2024)By Yao Yevenyo Ziggah, Victor Amoako Temeng, Solomon Evans Kweku Koomson
Tyre hours/life deficit is a major operational challenge facing the mining industry which adversely affects materials production and costs. An accurate forecast of the tyre life is key in addressing t
Mar 11, 2024
-
Low-profile capacitive load cells for underground mining material and wear classification to promote worker safetyBy Andrew J. Petruska, Austin F. Oltmanns
The paper proposes a capacitive load cell for detecting changes in material and tool wear conditions for conical picks used in underground mining. The current process is dangerous and subjective, rely
Aug 1, 2023
-
Sinking And Commissioning Of The Eastern Twin Shaft System At Buffelsfontein Gold Mining Company Limited ? IntroductionBy G. L. Smit
The Buffelsfontein Gold Mining Company is situated in the Klerks-dorp district of the Province of the Transvaal in the Republic of South Africa, approximately 100 miles west of Johannesburg. Gold p
Jan 1, 1964