    The European Integration through a Major Drill & Blast Tunneling Project

    By Demosthenes (Dennis) Efstratiadis

    After European Council’s Directive 93/15/EEC of 5 April 1993 on the harmonization of the provisions relating to the placing on the market and supervision of explosives for civil uses, the so called ”I

    Jan 1, 2018

  • ISEE
    Modeling VOD and Initiation Effects on Blast Vibration PPV Using Nonlinear Charge Weight Scaling and Variable Time-window for Charge Elements

    By Mathias Jern, Ruilin Yang

    A blast vibration model has been developed that simulates effects of almost all blast design parameters on the blast vibration peak particle velocity (PPV) from a production blast with multiple blasth

    Jan 1, 2019

  • ISEE
    On Board Excavator Dilution Detector

    By Benjamin Cebrian

    The new technology presented in this paper is a patented system that is installed on board excavators (backhoe or front shovel types). Several control points are set along ore/waste contacts and their

    Feb 1, 2020

  • ISEE
    Damage Development in Small Blocks

    By C. Pelley, S. Kelebek, G. Kunzel, P. Katsabanis

    Small blocks of granodiorite have been subjected to blast loads from a single borehole and from a series of boreholes detonating at various timing intervals. The damage of the blocks was assessed thro

    Jan 1, 2003

  • ISEE
    Journal: Blastserve A Discussion Forum for ISEE Members / Effects of Line or Channel Drilling on Vibration

    Hello, everyone. Way back in 1965, Devine and others at the US Bureau of Mines showed that a presplit fracture plane did not affect vibration levels transmitted across the plane (RI 6695).

    Jan 1, 2010

  • ISEE
    The Recovery of a Dozer from a Highwall Using Blasting

    By Tyler Acorn, Tristan Worsey

    A dozer operator at a surface gold mine accidentally drove a D10 off the side of a highwall. The blade of the dozer caught on the lip of a catch bench 60 ft. (18.3 m), down stopping its descent. The o

    Jan 1, 2014

  • ISEE
    Urban Tunneling for the MWRA's Boston Harbor Clean Up

    By Gordon C. Petersen, Gary A. Almeraris

    This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe

    Jan 1, 1991

  • ISEE
    Success in Advanced Blasting on the Basis of Sonicity -or- What a Blaster Should Know about Wave Dynamics in Rock!

    By H P. Rossmanith

    This contribution addresses the advanced blasting technology which is based on wave propagation theory and fracture mechanics. The new concept of sonicity and the principle of maximizing sonicity in b

    Jan 1, 2010

  • ISEE
    Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant

    By Thierry Bernard, Philippe Dozohne

    May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate

    Jan 1, 2001

  • ISEE
    Optimization of Fragmentation in benches for Dragline deployed in large opencast coal mines- A case study of Indian mine

    By Rajesh Sonkar, Sanjeev Kumar

    The deployment of Dragline machines in opencast coal projects involves huge capital expenditure as well as operating costs. The mine operators always endeavor to ensure smooth excavation of material b

    Jan 1, 2011

  • ISEE
    Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole

    By Keith Henderson

    An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall

    Jan 1, 2012

  • ISEE
    Excavation of a Tunnel to Reach a Large Underground Cavern Roof Fall

    By H. S. Venkatesh R. Balachander, G. C. Naveen

    During the construction of a 1020 MW underground hydroelectric project in Bhutan a huge rock fall took place in the Downstream Surge Chamber (DSC) during March 2016. The total quantity of rock in the

    Jan 1, 2019

  • ISEE
    Drill Optimization in the Mining Industry

    By Jason Wilkinson

    Drilling operations are a vital component of surface mining, directly influencing productivity, safety, and cost efficiency. This paper explores a multi-faceted approach to drill optimization, focusin

    Jan 26, 2026

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • ISEE
    Rock Slope Remediation on the Pennsylvania Turnpike Bedford, Pennsylvania

    By Ron Woolf, Corry Goumans

    This paper describes rock slope remediation performed along America’s first Superhighway, the Pennsylvania Turnpike and in particular, the specialized drilling equipment designed and built by Pacific

    Jan 1, 2001

  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures (a3ef629c-b178-4045-bc88-d04c273fd2c0)

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • ISEE
    ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMine

    By Yong Pan, Purushotham Tukkaraja

    It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose

    Jan 1, 2019

  • ISEE
    Potential Impact of Blast Layout, Sequence and Detonator Timings on Air Overpressure from Blasting

    By Shazad Hosein, Bill Birch, Catherine Johnson, Toby White, Liam Bermingham

    Air overpressure (AOP) from blasting can give rise to a significant number of blasting complaints from residents living adjacent to blasting operations from mines, quarries or civil engineering projec

    Jan 1, 2018

  • ISEE
    All In The Timing

    By Sean Paterson

    The purpose of this paper is to demonstrate a method of delaying and loading a shot. Since entering the construction industry, I have learned that cover is needed on a lot of blasts. When in close hav

    Jan 1, 2001

  • ISEE
    Protecting a Gas Pipeline from Cast Blast Induced Vibration Damage

    By Sterling Ziegler, Kameron Ray

    Mining operations at a Wyoming coal mine were progressing to within 300 feet (91 meters) of a high pressure natural gas pipeline. Vibration levels from cast blasting were at a point at which standard

    Jan 1, 2018