    Difficult Sinking Cut in Severe Winter Conditions Improves Productivity at Lac Des Iles Mines

    By Cary Moffat, John Kita, Rick Walker

    The Lac des Iles Mine, in an isolated area of NorthwesternOntario is a relatively new open pit platinum and palladium mine. They were encountering problems with the equipment and production scheduling

    Jan 1, 1996

  • ISEE
    The Application of Likelihood Ratio Test to Blast Vibration Analysis

    By W. J. Birch

    The dedicated documenting of blast design and vibration monitoring results forms part of the best practice methodology for today’s blasting operators. This allows regression curves to be constantly up

    Jan 1, 2004

  • ISEE
    Vibration Analysis for Blasting on a 16th Century Environment in Toledo - Spain

    By Jesus Pascual, Benjamin Cebrian

    A new Convention Center is going to be built in the millenary city of Toledo, right in the old city limits. The workings will need to excavate some 80.000 cubic meters of granite, which has, a trench-

    Jan 1, 2004

  • ISEE
    Blasting Conditions Couldn't be Worse

    By John Atkinson, Steve Repola

    This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different

    Jan 1, 1993

  • ISEE
    Ore guiding in underground mining using MWD and machine learning

    By J. Sanchidrián, A. Fernández, P. Segarra

    The combination of chemical analysis techniques as XRF and measurement-while-drilling (MWD) technology in underground mining is a novel approach to gather comprehensive on-line information about physi

    Jan 1, 2024

  • ISEE
    A New Method of Reactive Ground Testing

    By Gary Cavanough

    The spontaneous exothermic reaction of ammonium nitrate explosives with sulphide-containing rocks, commonly referred to as reactive ground, is a site-specific condition that can lead to spontaneous de

    Feb 6, 2023

  • ISEE
    Factors Governing the Muck Pile Characteristics

    By David Cheung, S. Paul Singh

    "The characteristics of a blasted muck pile can have a significant effect on the productivity and economyof loading and hauling operations. Poorly fragmented and tight muck piles, caused by insufficie

    Jan 1, 2017

  • ISEE
    Blasters' Survival

    By John C. Brulia

    The IME member companies, the ISEE along with its chapter organizations, the Federal, state and municipal regulatory agencies, and the industry consultants and suppliers have developed safety equipmen

    Jan 1, 1994

  • ISEE
    Detailed Planning Underscores Expansion of Vulcan's Chattanooga Quarry

    By R L. Mayville

    The author explains why the strategic location and important limestone reserves at Chattanooga Quarry led to a decision to extend operating life by continued benching down to lower levels. He discusse

    Jan 1, 1984

  • ISEE
    Modeling Reactive Sulfide Rock at the Red Dog Mine

    By Norman Paley, Zachary Pickett

    The Red Dog Mine is a high-grade zinc-lead mine located in northwest Alaska which began operations in November 1989. In June 2014 the upper half of a charge in a trim shot in the Aqqaluk pit deflagrat

    Feb 1, 2020

  • ISEE
    Application of the Selective Loading to the Rock Mass Characterized through Drill Monitoring for Autonomous and Manual Drilling Mode to Optimize Blasting Results in Open Pit Operations

    By Jorge Blázquez, Pablo Ravanal, Paulo Couceiro, Juan Navarro

    Blasting performance is influenced by rock mass properties and blast design parameters. From them, the rock is the only variable that cannot be modified, but it can be measured, so that, blast design

    Feb 6, 2023

  • ISEE
    Effect of Impact on Pre-Squibbed Fireworks

    By Paul Worsey, Yasutaka Dote

    The choreography of large fireworks displays dictates electric initiation for precise timing. It has been common practice to pre-squib products before transportation for reducing set up time. A number

    Jan 1, 2009

  • ISEE
    Erratum: A Three Parameter Rock Fragmentation Distrubution

    By A T. Spathis

    Corrections are given for “A three parameter rock fragmentation distribution” by A.T. Spathis (Measurement and Analysis of Blast Fragmentation, Workshop hosted by 10th International Symposium on Rock

    Jan 1, 2013

  • ISEE
    Journal: Kaiser Plant Demolition / Smokestack Demolition at port of Tacoma, Washington

    By Walt Meglasson

    The Kaiser Aluminum Company Smelter, one of several in the Pacific Northwest, was built in 1942 and operated by the Olin Company during World War II and then purchased by Kaiser Aluminum after the war

    Jan 1, 2008

  • ISEE
    Journal:Security Matters / Procedures to Follow When Explosives Are Missing From Inventory (e.g., Disposition Unrecorded/Unknown)

    Prepare ATF Report of Theft or Loss (ATF Form 5400.5). A Report of Theft or Loss - Explosives Materials must be prepared when it is discovered that explosive materials are missing from inventory. Subm

    Jan 1, 2008

  • ISEE
    Development of Drop Raise Blasting at the Homestake Mine

    By Paul V. Sterk

    In the early 1980's, the Homestake Mine converted from labor intensive methods such as open cut-and-fill mining to Vertical Crater Retreat (\/CR) bulk mining and mechanized cut and fill. This transfor

    Jan 1, 1991

  • ISEE
    Digitized, Integrated and Optimized Drill and Blast

    By Sushil Bhandari, Amit Bhandari

    In this paper, a case study is presented of a large global cement company using a cloud and mobile based platform across 17 of their mines consistently over a large number of users over a period of ov

    Feb 1, 2020

  • ISEE
    Full Wall Control Blasting Optimization

    By John Floyd, Maria Rocha, Benjamin Cebrian

    Wall control blasting is needed in most metal mining operations in terms of increasing mineral reserves and assuring the safety of the operation. This type of blasting has the goal to achieve a clean,

    Jan 1, 2018

  • ISEE
    Mine optimization using Total smart mining solution

    By Chanhwi Shin, Hyeongmin Kang

    Mine optimization is a key strategy in the mining industry that focuses on improving the efficiency, productivity, and sustainability of mining operations. To achieve mine optimization, digitalization

    Jan 21, 2025

  • ISEE
    Blasting Design and High-Energy Explosive Strategies to Achieve Fines Targets for Mill Performance

    By Jorge Cardenas, Diego Sanchez

    Maximizing SAG mill throughput and metallurgical recovery in hard rock operations requires achieving target fragmentation, particularly a sufficient proportion of fines (<25.4 mm). These fines thresho

    Jan 26, 2026