Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Determination of the Dynamic Uniaxial Tensile Strength of Laurentian Granite Using an Explosivesly-Impacted Hopkinson Pressure Bar

    By P D. Katsabanis

    The dynamic tensile strength of geomaterials is known to be highly dependent on the strain rate of the load applied. This is significant in applications where the material is subjected to shock waves

    Jan 1, 2010

  • ISEE
    An Automated Approach to Blast Optimization Through Performance Monitoring of Blast Hole Drills and Mining Shovels

    By M Scoble

    This paper will report on the application of data collected through the performance monitoring of large diameter surface rotary blasthole drii and electric mining shovels, in an integrated approach to

    Jan 1, 1992

  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • ISEE
    A Hydrodynamics-Based Approach for Predicting the Blast Damage Zone in Drifting as Demonstrated using Concrete Block Data

    "Rock falls involving a relatively small amount of material are a leading cause ofinjuries in underground mines in the United States. A contributing factor is unwantedblast damage and over-break. A go

    Jan 1, 2009

  • ISEE
    Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge (aa576ad1-736a-4e7e-9977-8fe1a93c21b3)

    By Jason M. Ryan, T Michael LeBlanc, John H. Heiiig

    Drill trajectory deviation is a recurring problem in the Mining Industry retreat stoping operations. As a result of this deviation, it is quite concevable that 60 kg (165 mm 0) and 103 kg (203 mm 0) e

    Jan 1, 1995

  • ISEE
    600 000 M.T to move, a High Risk Operation

    By Jean-Sébastien Lambert, Serge Roberge

    "At the end of 2014, Holcim Canada (Demix Aggregates Division) considered the possibility of drillingand blasting a big volume of rock in order to expose a high-quality limestone bench in one of their

    Jan 1, 2016

  • ISEE
    An Analytical Approach For Diagnosing and Solving Blasting Complaints

    By Douglas Rudenko

    Have you ever had a neighbor complain about a blast one day, but says the next day’s blast was better, even though the Peak Particle Velocity (PPV) increased? How about neighbors that complain about a

    Jan 1, 2000

  • ISEE
    479 Charges, 13 Decks...120 Meters Above a Crushing Plant

    By Thierry Bernard

    This case study shows how a unique combination of field measurements and advanced technologies allowed blasters designing, loading and firing an incredibly challenging quarry blast.

    Jan 1, 2015

  • ISEE
    3D Computer Simulation of Bench Blasting With Precise Delay Timing

    By Dale Preece, C. Mick Lownds

    Detonation delay timing has been an important aspect of quality rock blasting for decades. Detonators that enable delay timing have improved over the years especially with the recent advent of precisi

    Jan 1, 2008

  • ISEE
    “Computerized Drill for Quarrying Automates the Drilling Process”

    By Maurice Hunter

    The paper outlines recent design developments in the computerization of surface crawler drills for the quarry industry. It references the technology firstly developed for the underground mining and co

    Jan 1, 2003

  • ISEE
    Wipfrag and Wipjoint - To Measure, Record and Predict Blast Results

    By John A. Franklin, Tom C. Palangio, Norbert H. Maerz

    WipFrag systems I and II have become the world standard in photoanalysis systems to measure fragmentation. Mines, quarries and excavating contractors can now easily measure blast results and track the

    Jan 1, 1997

  • ISEE
    Controlled Blast Induced Liquefaction of Water Saturated Sands Using 250 m Long Horizontal Holes and Electronic Detonators

    By M. Ganster, H. Krenn

    The mission of the project is the fast and cost-effective rehabilitation of decommissioned lignite mining and coal upgrading facilities. This is necessary to ensure the successful future utilization o

    Jan 1, 2013

  • ISEE
    Part A: Structural Response from Surface Coal Mine Blasting on a Residential Structure; Part B: House Response from Blast-Induced Low Frequency Ground Vibrations and Inspections for Related Interior Cracking

    By John H. Weigand, Stephen V. Crum

    "VIBRONICS, INC. instrumented and monitored a residential structure for response to,blasting at aMidwestern surface coal operation. The residence was owned by the mining company and was extremely clos

    Jan 1, 1998

  • ISEE
    Possibility of Organizing and Analyzing Drilling - Blasting with a Computer Program (DelPat)

    By Cceliksirt, V Erkan

    This computer program has been developed under the field conditions for use in control of surface drilling-blasting operations. This paper outlines the relevance of fragmentation to quarrying, open pi

    Jan 1, 1998

  • ISEE
    Reducing Overall Toxic Fumes at Fixed Work Output, by Formulating

    By Michael Wieland

    For shooting rock properly, some relatively fixed quantity of rock work is required from the total charge mass, while keeping the overall toxic fumes to a minimum. The overall fumes weighted for the t

    Jan 1, 2006

  • ISEE
    A New Generation of Shock Tube Detonators

    By John Watson

    The earliest known records related to mining document in dramatic terms the fact that mining methods have undergone significant change over the centuries. Wooden wedges, hammers and chisels, “fne sett

    Jan 1, 1997

  • ISEE
    Civil Tunnelling with Electronic Blasting Systems - Early Experience in Korea

    By Dave Kay, Young-Suk Song

    To meet the needs of South Korea's rapidly expanding economy, a large number of infrastructure projects are under way to improve transportation efficiency within the nation. These projects include hig

    Jan 1, 2005

  • ISEE
    Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders (52912f89-42e4-4811-8c7f-344764181b42)

    By Daniel Hauer

    Blocking. (5) The “blocking” of boulders is a much cheaper way of breaking them up than “mud capping.” It should always be used in preference to that method except when too much time will be consumed

    Jan 1, 2006

  • ISEE
    Changing the Landscape of Surface Mining through Fully Wireless Initiation Systems

    By Nolan Eckroade, Nigel Pereira

    Wireless electronic blasting systems are a new technology that enable truly wireless initiation through rock, air and water. This is achieved using low frequency magnetic induction waves to wirelessly

  • ISEE
    *Kuz-Ram and Digital Image Processing System Combination to Determine Specific Blasting Parameters

    By A. Karadogan, G. Tuncer, A. Kahriman

    Determination of optimal blast parameters have been the priority act for blasters on the field due to financial and technical properties of the operation. Therefore many researchs were done to establi

    Jan 1, 2005