Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Vibration Monitoring Using In-house Developed Devices – A Taylor’s Approach

    By Auã Kiahla, Tomi Kouvonen, Vinicius Miranda

    Through numerical mathematical processing (Taylor’s approach and numerical derivation) the original data supplied by the accelerometer’s sensors was transformed into velocity and, after the data minin

    Feb 1, 2020

  • ISEE
    Determining the Quickest Way to Prepare a Dragline Pad Using i-PushTM Dozer Simulation Software

    By Stephen Chung, Graham Mustoe, Joe Haid

    In an open cast coal mining operation, a 305 m (1000 ft) long by 49 m (160 ft) thick overburden cast blast can produce more than a million cubic yards of broken muck that needs to be removed before th

    Jan 1, 2006

  • ISEE
    The Effect of Calculated Explosive Energy Output on Blast Design

    By P D. Kasbanis, Lyall Workman

    "The energy output of an explosive is typically calculated using an equation of state and computerapplications. Results are reported as weight and bulk strength, either in absolute terms or relative t

    Jan 1, 1996

  • ISEE
    ROCSCAN: A Multipurpose Geomechanics Instrument

    By D Frantzos, J J. Cotter, H Tammemagi, J B. Codrington, J Kaasalainen, A C. Webster

    "Exploshres Technologies International (ED) is developing an instrument called ROCSCAN which isplanned to have broad application in both blasting and rock mechanics. The purpose of this paper is to ou

    Jan 1, 1989

  • ISEE
    Well Casing - Another Problem Solved Through the Uses of Explosives

    By Jerry Wallace

    The goal: At an industrial site, sever a well pipe containing an interior obstruction in a timely, cost effective manner by using a shape-charge to cut through the casing more than 50 meters below gro

    Jan 1, 2000

  • ISEE
    Bottom Hole Annular Pressure: A Theoretical Problem with Real Effects

    By Clarence R. Zink

    A problem has always existed in deep and fast drilling situations such as coal overburden drilling, or when drilling with a tight annulus, such as 9 7/8" bits and 8 5/8" pipe. This problem is the diff

    Jan 1, 1998

  • ISEE
    Assessment of Perimiter Blasting at the Homestake Mine

    By J Deen, P Sterk, W Forsyth

    Homestake Mining Company has made a firm commitment to develop a functional and cost effective perimeter blasting program. The goal of the program is to develop smooth, sound walls in all development

    Jan 1, 1997

  • ISEE
    Thedaveytronic-Theintegrated Electronic Delay Detonator

    By Rapheal Trousselle

    For over 5 years, Davey Bickford has been developing and testing an electronic detonator blasting system. These new-technology detonators provide more accurate timing than conventional systems that re

    Jan 1, 1997

  • ISEE
    A New and Reliable Technique for Safely Removing Underground Rock Hang-ups

    By Brian Micke, Mick Gavrilovic

    The problem of rock hang-ups in underground mining operations has been a continuing one since the days of the “hang-up man”. This position commanded the highest pay of any underground worker in many h

    Jan 1, 1999

  • ISEE
    Demolition of a Storehouse by the Blasting and the Simulation of the Demolition by DDA Method

    By Kunihisa Katsuyama, Yuji Ogata, Yuji Wada

    The one free surface blasting of a concrete block was simulated by Discontinuous Deformation Analysis(DDA) method. Comparing the simulated results with the concrete block blasting experiment, the crac

    Jan 1, 1996

  • ISEE
    Journal: 100 Years / In The Circuit Court of the United States For The District Of Delaware United States of America, Petitioner vs E.I. DuPont De Nemours and Company and Others, Defendants July 13, 1907 Origin of the Conspiracy and the Various

    By Robert Hopler

    That some time in the year 1872 there was organized an association composed of practically all of the manufacturers of gunpowder and other high explosives in the United States, the members of which sa

    Jan 1, 2008

  • ISEE
    Back to the Basics; Nonelectric Initiation Shock Tube Systems, Part 2: General Applications

    By Larry Schneider

    I n the simplest application of a shock tube initiation system, the tubing acts as a “relay line” which passes a detonation signal from borehole to borehole. When the signal arrives at each borehole,

    Jan 1, 1995

  • ISEE
    A Preliminary Study into the Relationship between Air Overpressure and Face Velocity in quarry Blasting

    By W. J. Birch, R. Farnfield, L. Bermingham

    Whilst a significant body of research has been carried into air overpressure levels that arise as a result of the use of explosives, few published studies have actually tried to relate the movement of

    Jan 1, 2008

  • ISEE
    Analysis of Parameters of the Ground Vibration Produced by Bench Blasting at a Boron Open Pit Mine in Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Mehmet Aksoy, Kagan Ozdemire

    With increasing environmental constraints on the levels of disturbance induced by blasting operations upon nearby residents, there is an increasing need to be able to design cautious blasting with gre

    Jan 1, 2005

  • ISEE
    The Assessment of Detonation Codes for Blast Engineering

    By C V. B Cunningham

    The assessment of blasting results under production conditions is extremely difficult. As a result, it can take months or years to establish objective and valid estimates of explosive performance in a

    Jan 1, 1991

  • ISEE
    Techniques to Assess the Influence of Blast Design Parameters on Airblast and Blast Vibration

    By Robert Hivick, Frank Sames

    The control of environmental effects, especially blast vibration and airblast, has become a dominating planning criterion for most surface blasting operations. Compliance with existing regulations is

    Jan 1, 1999

  • ISEE
    Blasting in the New Mellinnium: Safety and CredibilityA Recipe for Success

    By Steve Dillingham

    In every aspect of conduct, on the blast site or off, the issue of credibility is raised. Promises are made, commitments are satisfied, safe practices are obeyed, communication is maintained, and prov

    Jan 1, 2003

  • ISEE
    Isolating Single Hole Vibration Signals from Multi-Hole Shots

    By Rob Famlield, Gavin Yuill, William Birch

    The Blasting Research Group at the University of Leeds, in the United Kingdom, continues to be highly active in the area of the environmental impact of blasting. In recent years a major part of this r

    Jan 1, 2002

  • ISEE
    A Methodology to Control Peak Particle Velocity Levels at Multiple Locations by use of Electronic Detonators

    By W. J. Birch, D. Leckenby, R. Farnfield

    The use of electronic detonators to improve fragmentation is becoming universally accepted. However their use in limiting peak particle vibrations levels is still in its infancy. Most of which is anec

    Jan 1, 2007

  • ISEE
    Innovative Blasting Mine Life Extension at a Coal Mine in Australia

    By R. Bitmead, R Barker, A. Drake

    The opencut coal mine is located about 50 km west of Brisbane, the capital city of Queensland in Australia and produces about 140 000 tonnes per annum of high grade steaming coal utilising a small tea

    Jan 1, 2002