Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative SolutionBy Filippo Maria Leoni, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co
Jan 1, 2017
-
An Innovative Use Of Bored Tension Piles In Embedded Retaining Wall Design & ConstructionBy Abid O. Adekunte
The design, construction and monitoring of the deep excavation support for the basement of a large-scale commercial development in Cavan, Ireland is presented. Excavation area was adjacent to existing
Jan 1, 2008
-
Water Powered Percussive Downhole Hammers – Energy Savings And ProductivityBy Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Collaborative Data Sharing During Seepage Barrier Wall Construction at Bolivar Dam – Perspectives from Owner, Contractor and Sub-ContractorBy Robert Bachus, Jamey Rosen, Fabio Santillan, Georgette Hlepas
"A seepage barrier of length 4,800 feet and maximum depth 144 feet is being installed at Bolivar Dam in Ohio. This project is owned by the United States Army Corps of Engineers and contracted to Trevi
Jan 1, 2017
-
High Capacity Hollow Core Bar PilesBy Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
Evolving Micropiles: Optimizing Foundations For Seismic RetrofitBy Rob Jameson
Micropiles are ideally suited to seismic retrofit applications. Their high tensile and compressive capacity can sustain the large concentrated loads induced during seismic events. Micropiles can be
Jan 1, 2008
-
Sloping Rubble Marine Seawalls Founded on Soft Soil Improved by Stone ColumnsBy Eleonora Di Mario, Colin B. Turnbull, Matthew G. Mills, Chengbin Miao, Wilhelm S. Degen
"In the past decade, the ‘zero-dredge’ philosophy has become the preferred option for the formation of marine seawalls and reclamations, compared to the partially or fully dredged options, as this sol
Jan 1, 2017
-
The Potential Impacts Of Questionable Instrumenation DataBy Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson
This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t
-
State of the Art Ground Improvement Technique for a Residential Complex: Case StudyBy Madan Kumar Annam, Hari Krishna Y, I. V. Anirudhan
"For completion of projects in time with positive results, improvements of productivity and effective project management procedures have become extremely important. This paper discusses a milestone pr
Jan 1, 2015
-
Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult GeologyBy A. Rod Kern, Michael A. McNicholas, Yaser Taheri
Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing
Jan 1, 2019
-
Cannonsville Dam Emergency Borehole ResponseBy John Vickers, William H. Hover, Paul C. Schmall
"Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n
Jan 1, 2016
-
Session 18 "Grouting for Micropiles & Anchors"By Jim Bruce
No answer required. From the drilling equipment suppliers, but the specifications must be tailored to be project-specific. Yes, the sonic technique is very interesting as we said, and it is not so muc
Feb 10, 2003
-
Wet Soil Mixing For Foundation Support and Liquefaction Hazard Mitigation for the Ventura Cancer CenterBy Thang V. Nguyen, Lisheng Shao, Gary E. Taylor
"The Community Memorial Hospital of Ventura, California, proposed to build a new state-of-the-art Cancer Treatment Center with radiation shielding walls and roof. The loose silty soils at the site had
Jan 1, 2015
-
Earth Pressure Distribution On Diaphragm Wall During ExcavationBy Ting Chinsu
Diaphragm wall with tie-back cable is widely used for deep excavation, especially in the area with high density of buildings. This paper presents the measured earth pressure distribution on diaphragm
Jan 1, 1991
-
The Use of Controlled Modulus Column (CMC) Ground Improvement for Support of Large WarehousesBy Brandon T. Buschmeier, Sonia S. Swift, Michael P. Walker, Frederic Masse
"Ground improvement has undoubtedly become a cost-efficient and effective solution to support the development of poor soil sites. Ground improvement elements, such as Controlled Modulus Columns (CMCs)
Jan 1, 2017
-
Economic Design Of Piling Platforms On Coarse Grained SubgradeBy Patrick Wong
The design of piling platforms is addressed in BRE (2004) for both fine grained and coarse grained subgrades. However, for coarse grained subgrades, piling platform designs can often be overly conserv
Nov 1, 2022
-
Unified Design Of Piles And Pile Groups Considering Capacity, Settlement, And Negative Skin Friction - 1. IntroductionBy Bengt H. Fellenius
It is a truism that in the design of pile foundations one must consider both capacity and settlement. As to capacity, most basic text books contain simple methods of design of capacity of single pile.
Jan 1, 1991
-
An Evaluation of t-z Analysis MethodsBy Kirk Ellison, Sherif Elfass, Ramin Motamed, Kevin V. Stanton
"The determination of accurate load transfer curves are essential for estimating deep foundation loadsettlement response using t-z style analyses. While recently developed semi-empirical methods from
Jan 1, 2017
-
A Tall Slender Tower Rises On Secant Piles and Drilled ShaftsBy Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet
Jan 1, 2016
-
Field Sampling and Testing for Soil Mixing – Uses and Misuses of Different QA/QC Tests for CDSM Projects – A Contractor’s PerspectiveBy A. David Miller, Chika Oya
"Field sampling and testing are part of the Quality Assurance/Quality Control (QA/QC) requirements for all Cement Deep Soil Mixing (CDSM) Projects. Field sampling and testing are also used for determi