“Borehole Stabilization” For Deep Excavation, An Essential Part In Bored Piling / Diaphragm Wall ConstructionBy Thomas Domanski
Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent
Sep 1, 2022
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging ProjectBy José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
Pile Foundation Solutions in the Deep Quaternary Sediments of Botany BayBy Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski
"The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction
Jan 1, 1900
-
Foundation Rehabilitation of the Henry Hudson BridgeBy Dharmil S. Patel, Zoyav S. Benyaminov, Cassandra A. Wetzel
Rehabilitation of the Henry Hudson Bridge is nearing completion, connecting Spuyten Duyvil in the Bronx to Inwood Hill in Manhattan, New York. Constructed in 1936, the Henry Hudson Bridge spans 840 fe
Sep 8, 2021
-
Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of ShanghaiBy Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu
"This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber
Jan 1, 2015
-
FHWA Hollow Bar Soil Nail (HBSN) Test Program, A SummaryBy Jesús E. Gómez
Verification and production testing of soil nails requires debonding the upper section of the soil nail to isolate the portion of the soil nail intended for testing within a specific ground type. In p
Jan 1, 2011
-
Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann
Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and
Sep 1, 2022
-
Utilizing Real-Time Data and Statistical Analysis for Wet Soil Mixing: A Case HistoryBy Sunil Arora, Lisheng Shao, Chris Conkle
"The East Garden Grove - Wintersburg Channel located in Orange County, California, required upgrades along the levees to mitigate potential liquefaction and lateral spreading hazards. The Orange Count
Jan 1, 2015
-
Numerical Analysis in Assisting Crane Pad Design and Underground Utilities EvaluationBy Yazen Khasawneh, Yao Zhang
Upgrading and maintenance programs were proposed at a power generating plant in Indiana. To perform construction activities associated with the proposed upgrading and maintenance, a LR11350 crawler cr
Jan 1, 2019
-
ACIP Pile Performance and Installation in the Northeastern United StatesBy Jr NeSmith
"Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile
Jan 1, 2016
-
Three-Dimensional (3D) Limit Equilibrium Method (LEM) Comparative Study of a Landslide Case Study Supported with PilesBy Terence Ma, Seok hyeon Chai, Jeff Lam, Thamer Yacoub, Brigid Cami, Sina Javankhoshdel
The Limit Equilibrium (LE) analysis of pile-supported geotechnical structures normally assumes a constant shear force for the pile instead of considering the non-linear capacity of the pile which is r
Sep 8, 2021
-
Cost Effective Excavation Support in SeattleBy Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
Is the use of Residual Strength Justified in Excavation Support Design?By George Aristorenas, Carlos Englert, Jesús Gómez
"Laboratory test data of strain softening soils exhibit the development of a maximum (peak) shear strength followed by a decrease in the strength with continued straining. The rate of strength loss de
Jan 1, 2015
-
Cost Effective Drilling Of Extra Large [XL] Monopile FoundationsBy Phil Wilkinson, Sam Whitaker
"The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo
Jan 1, 2017
-
Baum Station – A New Pile Driving and Drilling Navigation SystemBy Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura
"A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep
Jan 1, 2017
-
Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical MethodsBy Suresh Chikati, Gangadharan Santhanam
Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap
Sep 1, 2022
-
Rehabilitation of an Existing Mechanically Stabilized Earth Wall Using Soil NailsBy Daniel A. Thome, Robert C. Janke
"Installation of permanent soil nails through distressed mechanically stabilized earth retaining walls is a cost effective and aesthetically pleasing solution when using the appropriate equipment and
Jan 1, 2005
-
Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)By Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in
May 11, 2007
-
Axial Behavior of Auger Cast Piles in Inner Coastal Plain Geology (0a0de455-b1b9-4e2a-a87b-f9c3f26892a7)By Brian E. Ladd
"A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde
Jan 1, 2017
-
Axial Behavior Of Auger Cast Piles In Inner Coastal Plain GeologyBy Brain E. Ladd
A load test program was performed on two auger cast piles constructed in the Inner Coastal Plain geology of North Carolina. Both test piles were installed through Coastal Plain deposits and into unde