Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Results Of An International Pile Load Testing Prediction EventBy N. Charue
An international prediction event was carried out within the framework of a 30-pile testing program organized in a sandy soil in Belgium (Limelette). That program called upon several testing methods:
Jan 1, 2002
-
Careful And Controlled Underpinning Methods In Restoration Of Damaged Houses In The Old Town Of StockholmBy T. Iwanowski
Stress wave measurements and calculations are often used to make a safe determination of the bearing capacity and the integrity of driven piles. Some applications to the restoration of old buildings i
Jan 1, 1991
-
Hand-Dug Underreamed Piles At Embankment Place, LondonBy W. J. Grose
The Embankment Place office development over the platforms of Charing Cross Railway Station in London has presented many interesting and unusual problems to the engineers involved with the project. Th
Jan 1, 1989
-
Soil Inclusions In Jet Grout ColumnsBy Timothy D. Stark
Jet grouting has increasingly become one of the ground improvement technologies used to address seepage concerns and to provide strength improvement of soils. The technique of jet grouting uses high p
Jan 1, 2009
-
Aseismic Bearing Capacity Of Pile Foundation ? SynopsisBy J. X. Wu
An investigation on the seismic damage to buildings with pile foundations in Tianjin region, was conducted after the earthquake which hit Tangshan in 1976. It showed that most pile-founded buildings h
Jan 1, 2010
-
250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group TechnologyBy Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni
"Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity
Jan 1, 2014
-
Effective Dewatering Is More Than A Pump In The Hole - A Presentation At The Deep Foundations Institute Annual Meeting St. Louis, Missouri, November 1980By William J. Rothschild
Ground water at construction sites can be controlled by properly placed wellpoint dewatering systems. Care must be taken in planning cofferdams to have adequate space for and access to pumps, headers
Jan 1, 1984
-
Secant Pile Walls - Design, Construction And Case HistoryBy Ketan H. Trivedi
This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install
Jan 1, 2006
-
Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette ConstructionBy Thoedtida Thipparat
The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord
Jan 1, 2006
-
Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, TennesseeBy James L. Vinson
Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to
Jan 1, 2006
-
Vibration Environmental Effect Of Construction Operations - SynopsisBy Mark R. Svinkin
Construction vibrations may be harmful to adjacent and remote structures, sensitive instruments and people. Construction vibration sources have a wide range of energy, displacement, velocity and accel
Jan 1, 2000
-
Displacement And Pore Pressure Monitoring During Installation Of Drilled Displacement PilesBy Lisa M. Splitter
Drilled displacement piles were constructed as the foundation for a proposed 10-story building in San Francisco, California. At the study location, the stratigraphy consists of 14 to 21 feet of fill
Jan 1, 2009
-
An Overview Of Soil Mixing In The United States ? IntroductionBy Peter J. Nicholson
Since the reintroduction of soil mixing to the United States over 10 years ago, the work installed by soil mixing technology has grown dramatically. From an annual turnover of less than ten million do
Jan 1, 2001
-
Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering TechniquesBy Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008
-
List Of DelegatesAUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,
Jan 1, 1994
-
Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation ProjectsBy Martin B. Hudson, Daniel Brescia, Zhangwei Ning
Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea
Jan 1, 2018
-
The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban EnvironmentBy James E. Parkes
The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station
Jan 1, 2011
-
Frequency-Variable Vibrators And Their Application To Foundation Engineering - 1 IntroductionBy K. Rainer Massarsch
In some parts of the world, vibrators are used extensively for different types of foundation engineering projects. If used correctly and in suitable soils then vibratory pile driving for example is ve
Jan 1, 1995
-
Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure SitesBy John P. Davis
The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s
Jan 1, 2006
-
Söderströmstunneln – An Immersed Tunnel Founded on Steel Core PilesBy Frank Haehnig, Kjell-Åke Averstad, Johannes Glückert
"AbstractThe Söderströmstunneln is part of the Citybanan project that is currently under construction in the centre of Stockholm. Main part of the lot Söderströmstunneln is a 300m long immersed tunnel
Jan 1, 2014