The Spadina Pier Cofferdam - Design, Installation & PerformanceBy Jan A. Nilsen
This paper describes a key element in the construction of a major project undertaken by Harbourfront Corporation in its efforts to rejuvenate the central Toronto waterfront. The Spadina Pier forms one
Jan 1, 1987
-
Application of Multiple Excavation Support Systems in Brown Field ProjectBy Shuvranshu K. Rout, Anup K. Mandal, Biswajit Das, Manos De
"To adopt new technology advancement in Steel Plant, there is a requirement of shifting of operation process from Coke Wet Quenching (CWQ) to Coke Dry Quenching (CDQ). New CDQ chamber foundation with
Jan 1, 2017
-
Special Foundation Systems - Paper 2.1 - The Merits Of Polymeric Fluids As Support SlurriesBy K. Englehardt
J BERESFORD introduced the subject of the paper which is the use of polymeric slurries to support the sides of diaphragm wall and bored pile excavations during construction. In the opinion of the auth
Jan 1, 1991
-
Deep Foundation Construction Using "Top/Down" Building Techniques In The United StatesBy David C. Lager
While not a new construction technique "top/down" construction is seeing increased use in high rise building construction. Using diaphragm wall, drilled shaft and mining construction techniques, top/d
Jan 1, 1987
-
Presentation #1 - Deep Foundation Inspection And Integrity Testing - Introduction - Why Use Drilled Shafts?By Bernard Hertlein
¦ Drilled shafts resist scour seismic loads better than groups of driven piles ¦ Drilled shaft construction creates less noise and vibration than driving piles ¦ Drilled shafts permit direct obser
Jan 1, 2001
-
Confirmation Of Composite Ground Design Using Field Plate TestsBy Timothy C. Siegel
In response to a solicitation for ground improvement for the construction of a new hospital in Owensboro, Kentucky, the team of Berkel & Company Contractors and Dan Brown and Associates PC designed an
Jan 1, 2011
-
Innovative Cofferdams Used On The I-205 Columbia River BridgeBy Robert Bittner
The following is a report on the development of two unique and separate cofferdam systems used in the construction of the marine foundations for the I-205 Columbia River Bridge at Portland, Oregon for
Jan 1, 2013
-
Non-Destructive Testing Of Drilled Shafts - Title ? Table Of Contents - Introduction And OverviewBy Edmund J. Cardoza
WELCOME TO THE DEEP FOUNDATIONS INSTITUTE 26TH ANNUAL CONFERENCE AND WELCOME ESPECIALLY TO THIS SEMINAR ON NON-DESTRUCTIVE TESTING OF DRILLED SHAFTS, PRESENTED BY MEMBERS OF THE DFI DRILLED SHAFT COMM
Jan 1, 2001
-
Performance Of A Large Diameter Drilled PierBy A. J. Partos
One Liberty Place, at 315 m is the tallest building in Philadelphia, PA USA. It is supported on drilled piers socketed in heterogeneous rock. 3832 kN/m2 end bearing and 383 to 766 kN/m2 shaft resistan
Jan 1, 1989
-
Basement Excavation: Cost Effective Retention System for a Multi Storeyed StructureBy Madan Kumar Annam, Hari Krishna Y
"Basement construction is one of the challenging geotechnical concerns in the urban environment. Several types of retention systems are practiced to support the earth which is suitable for restricted
Jan 1, 2015
-
Value Engineering – Design Risk and Reward at Major Sport Arena ProjectsBy Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli
Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw
Jan 1, 2018
-
Stabilization Of Organic Soil With The Limix SystemBy Magnus Ruin
The dry deep mixing method for stabilization of soft soil has been used in the Scandinavian countries for 25 years. The typical application has been stabilization of soft inorganic clay. Today the met
Jan 1, 2001
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing MethodsBy Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
Non-Destructive Testing Methods For Drilled Shaft And Acip PilesBy George Piscsalko
There are numerous methods currently available to assess the integrity of drilled shaft and ACIP piles. Each method has its advantages and limitations. This paper will compare the various available me
Jan 1, 2011
-
Hand-Dug Caisson Foundation Of The International Trade Centre In Shenzhen ? SynopsisBy Y. G. Li
The design and construction of the hand-dug caisson pier foundation of the Shenzhen International Trade Centre are described in the paper. In addition discussions and inquires about the load-bearing c
Jan 1, 2010
-
Time-Dependent Bond Regain In Driven Piles In Permafrost ? SynopsisBy B. Ladanyi
The design philosophies for piles in unfrozen and frozen soils are compared, and their similarities and differences are underlined. It is shown that in frozen soils, the long term behavior of a pile i
Jan 1, 2010
-
Compressive Behaviour of Hollow Core Micropiles in Cohesive SoilBy M. Hesham El Naggar, Osama F. E. Drbe
"Abstract: The use of micropiles has greatly increased the last twenty years, including applications involving low capacity micropile networks, seismic retrofitting, underpinning of existing foundatio
Jan 1, 2014
-
Instrumented Load Tests On Closed-And Open-Ended PilesBy Junhwan Lee
Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p
Jan 1, 2003
-
Pittsburgh Steelers Stadium - Deep Foundations Case StudyBy Larry Rayburn
In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified
Jan 1, 2001
-
Bearing Capacity And Slope Instability Solved By Novel Ground Engineering SolutionsBy T. J. Snell
Bolnore Village in Haywards Heath, Sussex, England, is a large development covering 8 to 10 hectares and expected to provide 1500 homes in five phases to assist in the continuing demand for new homes
Jan 1, 2006