New Piling System With Multi-Head Hammer Drill Capable Of Drilling Including 35,000 Psi Rock "Mach Drilling System" And Some Construction Examples - 1. Incentive Of DevelopmentBy J. Nakayama
For drilling large diameter holes for deep foundations, the common and distressing difficulty of long standing has been in coping with ground containing rocky formations and boulders. Where geological
Jan 1, 1988
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? SummaryBy Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
Seismic Hazards Evaluation and Lateral Pile Design in Diatomaceous EarthBy Arash Khosravifar, Matt Steffan
An expansion of the City of Klamath Falls Wastewater Treatment plant required geotechnical seismic hazard evaluations and deep foundation design. The site is located on the shore of Lake Ewauna and is
Jan 1, 2018
-
Lateral Dynamic Response Of Single Inclined PilesBy Amalia Giannakou
This paper utilises 3-D finite-element modeling to study the static and dynamic lateral harmonic response of inclined piles, in a homogenous and a non-homogenous soil, modeled as a linear hysteretic m
Jan 1, 2006
-
Presentation #6 - Rapid Load Testing: A New Choice For Pile TestingBy Michael D. Justason
...a global perspective... In March of 2000, the Japanese Geotechnical Society added "Rapid Load Testing" to their national standard for pile testing. In the year 2000. it is estimated that th
Jan 1, 2001
-
High-Strain Dynamic Testing Of Drilled Shafts And Cast-In-Place PilesBy Garland E. Likins
High-strain dynamic testing of drilled shafts and cast-in-place piles has become routine procedure in many parts of the world today. Field testing is performed by measuring strain and acceleration rec
Jan 1, 1995
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation ProjectBy Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Uplift Micropile Load Transfer In Unsaturated Missoula Flood DepositsBy John N. Cunningham
Despite the wide use of micropiles for rehabilitating and retrofitting existing structures, little is known regarding the load-transfer distribution of grouted micropiles in various soil deposits. Th
Jan 1, 2011
-
Improving Very Compressible Soils By Stone Columns And Stiffening Concrete Columns ? SynopsisBy I. Stanculescu
The consolidation of thick and very compressible soil deposits by stone columns associated with cast-in-place plain concrete columns, has been performed for shallow foundations of some heavy industria
Jan 1, 2010
-
Vessel Collision Design - Risk Analysis And Deep Foundation Issues For Bridges Over Navigable WaterwaysBy Michael A. Knott
Large lateral forces on bridge foundations due to extreme events such as vessel collisions, earthquakes, and wave forces on storm surges during hurricane events are often the controlling design condit
Jan 1, 2013
-
High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case StudyBy James Weaver
During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari
Jan 1, 2011
-
Drilled Shaft Difficulties and a Micropile SolutionBy Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
Technical VisitBy the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST
Jan 1, 1994
-
Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, MaineBy James W. Weaver
The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea
Jan 1, 2011
-
Pile Load Test Results Using The New Statnamic MethodBy Matthew Janes
Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa
Jan 1, 1990
-
Spring Constants of Belled Caissons for Seismic Retrofit of an Existing Critical Structure in a Seismically Active AreaBy David E. Albus, Ahmadreza Mortezaie, Bidjan Ghahreman
The structural evaluation of seismic performance of an existing hospital in Long Beach, California, required spring constants of foundation elements. The structure included support by deep foundation
Jan 1, 2018
-
Deep Foundations In The Challenging Geology Of Central FloridaBy Gary Kuhns
Central Florida is among the fastest growing urban areas in the United States, and its rapid development has required the steady construction of various types of civil engineering works. The karst geo
Jan 1, 2003
-
Design Parameter For Jacked PileBy Sugie Prawono
Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr
Jan 1, 1999
-
Design And Construction Of A Cut-Off Wall In Warm PermafrostBy Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The ProblemBy M. Zanotto
[ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole