    Installation Of Augered Cast-In-Place Piles - Equipment

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2003

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991

  • DFI
    Seal Slab Prestressed Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents experimental results from a study to assess the interface bond between a cast-in-place concrete seal slab and prestressed concrete piles in cofferdams. Three different seal slab p

    Jan 1, 2013

  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load Tests

    By Jesús E. Gómez

    This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa

    Jan 1, 2008

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2005

  • DFI
    25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting

    By Frank Callanan

    The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour

    Jan 1, 2009

  • DFI
    Port Mackenzie, Alaska - Deep Soil Compaction, Spin Fin- Pile Tension Test And Dock Construction

    By Garth Howlett

    In 1998 the Matanuska-Susitna Borough formed the new port district at Point MacKenzie, known as Port MacKenzie, located directly across the Knik Arm from Anchorage. In 1991 PND Engineers Inc. (PND), w

    Jan 1, 2006

  • DFI
    Augered Cast-In-Place Pile Manual (Model Specification with Commentary)

    "Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst

    Jan 1, 2016

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • DFI
  • DFI
    Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:

    By A. L. Garassino

    Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside

    Jan 1, 1994

  • DFI
    Deviations From Design Impact Performance Of An Aggregate Pier Supported Embankment

    By Jay L. Hodkinson

    Replacement of an aging twin span river crossing in Vermont required a temporary bridge to accommodate traffic during construction. Soils beneath the temporary approach embankment consisted of very s

    Jan 1, 2011

  • DFI
    Innovations in the Design and Construction of Marine Foundations

    By Robert B. Bittner

    "AbstractLarge diameter tubular piles offer significant advantages in terms of design performance and economy for major marine structures. This is particularly true for foundations of major overwater

    Jan 1, 2014

  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • DFI
    Theoretical And Experimental Investigation On Underwater Ground Anchors

    By Leonello Sciacca

    Deepening of harbours has become a priority, necessary to the ongoing operation of the wharves in the face of deeper draft merchant vessels and cruise ships. It is now standard practice in many areas

    Jan 1, 2011

  • DFI
    High Capacity And Fully Removable Soil Anchors

    By Anthony D. Barley

    Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit

    Jan 1, 2002

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • DFI
    Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge Project

    By Gray Mullins

    A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade

    Jan 1, 2003

  • DFI
    Holding Back The Watchung Mountains

    By Ryan C. Linthicum

    A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains

    Jan 1, 2003

  • DFI
    Creative Shoring Solutions For A Tight Urban Site

    By David G. Winter

    The Olive 8 excavation site in Seattle was surrounded on three sides by conditions requiring innovation, careful modeling, and extensive instrumentation to support use of a first-of-its-kind shoring s

    Jan 1, 2009