  • DFI
    Stone Columns Through Construction Demolition Debris Fill

    By Lok M. Sharma

    Development of brownfields is of great interest in these days. Such fields are not easily adaptable for foundations of structures. The uncertainties in ground behavior present challenges of unpredic

    Jan 1, 2009

  • DFI
    Construction Of The Main Tower Pier Caissons For The Greenville Bridge In Mississippi

    By F. Keith Jacobson

    To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus

    Jan 1, 2013

  • DFI
    Design And Construction Of Drilled Shafts In Iraq

    By Frederick C. Rhyner

    The United States government sponsored the construction of a new vehicular bridge over the Diyala River in Bubriz, Iraq. This paper describes the geotechnical engineering for design and construction

    Jan 1, 2009

  • DFI
    Selection And Design Of Continuous Flight Auger And Drilled Displacement Piles

    By Dan Brown

    This paper provides an overview of the advantages and limitations of continuous flight auger (CFA) and drilled displacement (DD) systems compared to other deep foundation systems, along with a summary

    Jan 1, 2005

  • DFI
    New Double-Walled Pile Technology for Noise Attenuation

    By Julie Hampden, Tim Dardis, Per Reinhall

    "Noise from impact pile driving can harm fish, marine mammals and other sensitive wildlife over large areas. Marine pile driving is highly regulated, and regulators require sound levels to be below ce

    Jan 1, 2017

  • DFI
    Use Of High Capacity Grouted Tension Piles Installed Vibration Free And Soil Displacing

    By Peter de Kort

    Tunnels in urban areas generally require deep excavations in soils under the groundwater table. In The Netherlands uplift loads are generally taken by piles installed into dense sand layers, which are

    Jan 1, 2008

  • DFI
    The Construction And Performance Of Post-Grouted Micro-Piles For Vancouver International Airport Domestic Terminal Building - Introduction

    By Ernest Naesgaard

    Post-grouted micro-piles were used for the seismic upgrading of the Vancouver International Airport Domestic Terminal Building (DTB). The micro-piles provided vertical resistance to both uplift and c

    Jan 1, 2004

  • DFI
    Errata (5268ac87-18a9-458e-b334-4f72060324e3)

    Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'

    Jan 1, 1994

  • DFI
    New Wembley National Soccer Stadium, London Piled Foundations: Design, Construction and Logistics

    By Max Gwynn, Tony Suckling

    "The new Wembley Stadium is the most spectacular soccer stadium in the world, built to the highest specifications, using the latest technology and offering visitors an unrivalled match-day experience.

    Jan 1, 2008

  • DFI
    A Full-Scale Test by Low-Improvement-Rate Soil in Combination with Crushed-Stone Mat on Peaty Ground

    By H. Hayashi, M. Yamaki, H. Hashimoto, T. Yamanashi

    "In an experiment on a trial embankment, the deformation mode of the improved ground at the toe of the embankment was compared with the deformation mode of the unimproved ground. This comparison showe

    Jan 1, 2015

  • DFI
    Estimating Axial Displacements Of Driven Piles In California Soils

    By Cem Akgüner

    The displacements of axially loaded single piles are analyzed with an approach based on elasticity. Young?s modulus and Poisson?s ratio of the soil encompassing a pile are the unknowns required as in

    Jan 1, 2008

  • DFI
    Recent Advantages of CDM-LODIC Method (Low Displacement and Control Method)

    By Yuji Yamashita, Kazuyoshi Kamimura, Tsuyoshi Takahashi, Naoya Matayoshi

    "The CDM-LODIC method (cement deep mixing - low displacement and control) method enables ground displacement to be reduced by removing an amount of soil equivalent to that of injected cement slurry an

    Jan 1, 2015

  • DFI
    Pile Testing Methods - Authors' Presentations. - Paper 9.1 An Innovative Approach To Load Testing Of High Capacity Piles

    By W. G. K. Fleming

    Mr P. Bermingham introduced paper 9.1, describing the development and trials of a new pile load-testing technique that the Authors had termed "Statnamic". The system involved launching a test weight m

    Jan 1, 1991

  • DFI
    Experimental Study on the Bending Failure Properties of Cement-Treated Soil

    By Takeru Fukaya, Tsutomu Namikawa

    "The bending tensile stress occurs in the ground improvements when external forces are applied to the column and wall shaped ground improvements. Therefore, in the design of the column and wall shaped

    Jan 1, 2015

  • DFI
    Lateral Response of Large Diameter Drilled Shafts in Clay

    By Ke Yang, Robert Liang

    "Drilled shaft foundations are widely used for many types of structures, especially for highway bridges, high rise buildings, and costal structures. The lateral design considerations are crucial for t

    Jan 1, 2005

  • DFI
    Use Of Cone Penetration Test (CPT) Results For Accurate Assessments Of Pile Capacities

    By Anand J. Puppala

    This paper provides information on various evaluation studies conducted to assess the CPT based interpretation methods. Salient findings from these evaluations are summarized. Additionally, a comprehe

    Jan 1, 2002

  • DFI
    Design And Load Test Of Micropiles In A Power Plant In Missouri

    By Bidjan Ghahreman

    A total of 120 micropiles were constructed for foundations of a new selective catalytic reduction (SCR) unit in a coal-fired power plant east of Kansas City, Missouri. Construction was performed unde

    Jan 1, 2009

  • DFI
    Comparison of 2D and 3D Anchor Analysis Methodologies

    By Ruth McKeown, Gilson de F. N. Gitirana, Murray Fredlund, HaiHua Lu

    The current design standards for the use of anchors in slopes is based on two-dimensional (2D) limit equilibrium analyses. Anchors are considered as discrete loads and the 2D anchor, factored based on

    Jan 1, 2019

  • DFI
    Large Diameter Helical Piles for Refinery Expansion

    By Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray

    "A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne

    Jan 1, 2017

  • DFI
    Stemmers Run Steel Sheet Pile Cofferdam And Trestle

    By Jennifer Peirce Brandt

    Project documents and the United States Army Corps of Engineers? permit for construction of the Stemmers Run Relief Wastewater Force Main across the Back River in Baltimore County, Maryland specified