Design and Construction of Specialty Foundation for the Historic Virginia State Capitol BuildingBy Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi
"The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States
Jan 1, 2005
-
Current Practice For Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality ControlBy Rudolph P. Frizzi
Structures supported on ACIP and DD piles perform successfully when quality control is maintained from the initial site subsurface investigation through pile design, bidding, and construction. The fou
Jan 1, 2005
-
Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical SolutionsBy John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen
Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t
Jan 1, 2019
-
Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage TunnelBy Ryan Sullivan, Lisa Smiley, Jewels Stover
The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Building A High-Rise Adjacent To Transit Tunnels In San FranciscoBy Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Fogg Museum Expansion - Support of Excavation Design and ConstructionBy James L. Christensen, Gregory Sanchez, Michael P. Walker
The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat
Jan 1, 2015
-
Presentation #3 - Cross-Hole Sonic Logging And Single-Hole Sonic Logging - OutlineBy Les R. Chernauskas
? What is Integrity Testing? ? Cross-Hole Sonic Logging (CSL) ? Single-Hole Sonic Logging (SSL) ? Typical Specifications ? Case Histories ? Observations and Conclusions WHAT IS INTEGRITY T
Jan 1, 2001
-
The Bow, Encana: Design, Monitoring, And Results Of A Deep Excavation In Downtown CalgaryBy Matthew Janes
The new Bow office complex will become the new headquarters of EnCana Corporation, a leading Canadian oil and gas company. The shoring system, encompassing nearly two city blocks and excavated to a d
Jan 1, 2008
-
An Alternative Pile TechnologyBy Rimas Veitas, James Panton, Erich Steinlechner
"Ductile Iron Piles (DIPs) are a proven, viable alternative to conventional piles, and for the past five years have been successfully used throughout New England. The installation process of DIPs lend
Jan 1, 2017
-
Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a
-
Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future GenerationsBy John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse
This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1
-
Post-Katrina Emergency Interim Flood ProtectionBy Fred Fuchs
"Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many
Jan 1, 2008
-
A Geotechnical Data Base Development And Applying Data Mining Techniques To Extract The Common Trendes Of Offshore Geotechnical Properties Of South Pars Gas Field/ Persian Gulf IR-IranBy H. Shiri
Iran's largest natural gas field is South Pars, geologically an extension of Qatar's 900-Tcf North Field. South Pars was first identified in 1988 and originally appraised at 128 Tcf in the e
Jan 1, 2006
-
Hammer-Grout Piles At The Bronx-Whitestone BridgeBy Ameir Altaee
Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho
Jan 1, 2010
-
Alameda Corridor-East: San Gabriel Trench ProjectBy David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
Non-Destructive Testing, Evaluation And Re-Use Of Deep Foundations Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2009
-
Automated Pile Load Test MonitoringBy Joel L. Volterra
Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site
Jan 1, 2008
-
Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock SlopeBy Herbert F. ?Buck? Darling
A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat
Jan 1, 2013
-
Drilled Shaft Design, Testing and Construction in New Jersey Turnpike - Case StudiesBy Abu B. Siddique, Anthony S. Crincoli
"The New Jersey Turnpike Section 2 widening program consisted of widening between Interchange 6 in Mansfield Township, Burlington County and Interchange 9 in East Brunswick Township, Middlesex County.
Jan 1, 2015