Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Intec Gold Process - A Halide-Based Alternative for the Recovery of Gold from Refractory Sulphide Deposits

    By D. Sammut, F. Houllis, J-L. Huens, J. Moyes

    The Intec Gold Process has been developed as a halide-based alternative for the recovery of gold from refractory sulphide deposits. The halide medium allows sulphide oxidation and gold extraction to b

    Jan 1, 2005

  • CIM
    Geology and exploration, McDame asbestos deposit, Cassiar, B.C.

    By A. A. Burgoyne

    "The McDame chrysotile asbestos deposit located near Cassiar in northern British Columbia isfound at depth and on trend to the southeast of the currently mined open-pit Cassiar asbestos deposit. The u

    Jan 1, 1986

  • CIM
    Boiler tube failure mechanism recognition an expert system

    By P. Mayer

    "Determining the correct mechanism of a boiler tube failure is important for the prevention of future tube failures. Proper corrective measures can be undertaken to alleviate the root cause or causes

    Jan 1, 1990

  • CIM
    Minimizing Failures of Truck Hoist Cylinders and Frames

    By J. L. Blaylock

    Normally, the hydraulic system and structures are considered to be unrelated items. In reality, the two cannot be separated because one affects and depends on the other to function properly. This pape

    Jan 1, 1979

  • CIM
    Rib pillar design in open stope mining

    By H. D. S. Miller

    "This paper introduces a new approach for the design of rib pillars. The approach involves an empirical method for pillar design and a discussion of the pillar stability used for open stope mining met

    Jan 1, 1989

  • CIM
    Introduction of sequential blasting at Mines Gaspe, Murdochville, Quebec

    By Robert J-M Ethier

    "Sequential blasting has been introduced at Mines Gaspe to reduce the harmful effects associated with the instantaneously primed blasting method. Three stages of modifications had been tried to improv

    Jan 1, 1984

  • CIM
    Strontium doped lanthanum ferrite composite cathodes for intermediate temperature solid oxide fuel cells

    By L. Sun

    In this work, strontium doped lanthanum ferrite (LSF) and their composite cathodes were fabricated by screen printing on yttria-stabilized zirconia (YSZ) electrolytes. Their electrochemical properties

    Jan 1, 2005

  • CIM
    New developments in the mining of underground pillars at Thompson Mine

    By Rod Maclean, George Stewart

    "This paper covers the planning, development, and mining of an underground pillar complex using a bulk mining method. To achieve the long-term goal of continually improving our operating processes, al

    Jan 1, 1988

  • CIM
    Optimal tailings management at Highland Valley Copper

    By R. C. Lo, M. D. Scott

    "This paper reviews tailings management at Highland Valley Copper, and outlines main features of its tailings storage facility enclosed between the H-H and L-L dams. Key management focusses are: energ

    Jan 1, 1992

  • CIM
    Stress Corrosion Cracking Behaviour in Welded X-70 Linepipe Steel Under Near-Neutral pH Conditions

    By J. L. Luo, D. G. Ivey, A. H. Adeleke

    Double-edge-notched flat tensile samples of X70 steel were used for both slow strain-rate testing (SSRT) and cyclic loading testing with the notch located in the zone of interest, i.e., the weld metal

    Jan 1, 2005

  • CIM
    Geostatistical evaluation of the Abu Tartur phosphate deposit, Western Desert, Egypt

    By A. A. Abdul-Latif, A. Sahin

    "The phosphate deposit, located in the Abu Tartur plateau between the Kharga and the Dakhla Oases in the southern part of the Western Desert of Egypt, is the largest of its kind in the country. The ph

    Jan 1, 1990

  • CIM
    Application of new technology in the design of high-power electric smelting furnaces

    By A. G. Matyas, B. Wasmund, R. C. Francki, K. M. Donaldson

    "The construction of large. high-power electric furnaces has been an important factor in the growth of electric smelting technology . New developments in the design and operation of electric furnaces

    Jan 1, 1993

  • CIM
    The Polaris Mine

    By P. G. Keohane, J. S. Drake

    "Cominco's Polaris Mine is a lead-zinc underground operation that began commercial production in early 1982. The mine site is located on Little Cornwallis Island in the Canadian Arctic at a latit

    Jan 1, 1985

  • CIM
    A rule-based expert system for mining method selection

    By P. Venkatasubramanian

    "In recent years, computer based ""expert systems"" have been taking on large complex tasks for which no exact algorithmic solutions are feasible; tasks previously reserved for human experts requiring

    Jan 1, 1988

  • CIM
    The effect of shearing on the quality of some coals in the southeastern Canadian Cordillera

    By R. M. Bustin

    "Extensive deposits of tectonically sheared coal of the Mist Mountain Formation occur in the south eastern Canadian Cordillera. The quality of the coal varies markedly; it is commonly partially oxidiz

    Jan 1, 1982

  • CIM
    Where the Rubber Hits the Road?

    ?NWCC has the highest number of Aboriginal students of any post secondary institution in BC and the region served includes 25 bands ? Chair of the Board of Governors is Irene Seguin (Hagwiloo K?am Sa

    May 1, 2009

  • CIM
    A new approach to 7/8-in. Tapered drilling equipment at Madawaska

    By R. M. Giegerich

    "This paper begins with a brief history of Madawaska Mines, a brief description of the geology, mining methods and equipment, and the historical development of 7/8-in. tapered drilling equipment. It t

    Jan 1, 1982

  • CIM
    Canadian silica resources: A study of the processing of Ontario Potsdam sandstone for glass and foundry sand

    By P. R. A. Andrews, R. K. Collings

    "SUMMARYIn cooperation with the Ontario Ministry of Natural Resources, selected deposits of Potsdam sandstone in the Ottawa-Kingston area were core-drilled and evaluated by CANMET as potential glass a

    Jan 1, 1986

  • CIM
    Toward an inventory of aggregate resources in Newfoundland and Labrador

    By R. Ricketts, D. G. Vanderveer, F. Kirby

    "A program of mapping, sampling and testing to determine the potential of the aggregate resources throughout Newfoundland and Labrador was commenced in 1978. A 6-km-wide corridor parallel to all trans

    Jan 1, 1982

  • CIM
    The role of coal preparation plant performance testing in improving clean coal recovery

    By O. E. Humeniuk, A. I. A. Salama, M. W. Mikhail

    "Performance testing of prepartion plants is referred to as plant audit. It evaluates plant performance under normal operating conditions and is aimed at improving yield through knowledge of actual pr

    Jan 1, 1993