Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Investigation of Y-doped BaCeO3 as electrolyte in propane fueled proton conducting solid oxide fuel cell

    By Y. Feng

    Perovskite structured oxide 15% Y-doped BaCeO3 (BCY15) has been evaluated for use as proton conducting electrolyte in SOFC with propane as the fuel and Pt as both electrodes. Under the fuel cell condi

    Jan 1, 2005

  • CIM
    Increase of efficiency and decrease of power consumption in SO3 recycling from the off-gas of pyrometallurgical processes

    By Y. G. Yaroshenko, V. Y. Baldin, Y. M. Gordon

    The manufacture of sulphuric acid from the off-gas of pyrometallurgical processes in the production of heavy metals is one of the common methods of effective recycling of sulfuric anhydrite. The new I

    Jan 1, 2004

  • CIM
    Sulphide dust explosions at falconbridge two case histories

    By G. A. Moruzi

    Two sulphide dust secondacy explosions have occurred in the mines of the SUdbury operations of Falconbridge Ltd. during the past 18 months. 'Ihe main similarity between the occurrences is that they bo

    May 11, 1988

  • CIM
    Mining industry applications for new proximity detection technologies

    By D. G. Brophey, J. A. O’Neill

    "High costs, both in terms of human resources and financial costs, have long been the end result of accidents involving vehicles which continue to occur too often throughout our industry.For example,

    Jan 1, 1998

  • CIM
    Talc and soapstone deposits of Potton Township, Quebec

    By J. H. . MORGAN

    Talc-soapstone deposits exist in Patton Township of Quebec and have been mined by Bakertalc Inc. or its predecessors since 1938. The company produces products ranging from purified and micronized talc

    Jan 1, 1984

  • CIM
    The measurement of exhaust temperatures on operating underground diesel equipment

    By D. B. Stewart

    This paper reports on an investigation undertaken to determine the exhaust gas temperatures of operating underground mining equipment. The effectiveness of platinum catalytic purifiers is discussed. F

    Jan 1, 1979

  • CIM
    Development of a Stable MnO2 Protective Layer on Lead-Based Electrowinning Anodes

    By Georges Houlachi, Akram Alfantazi, Michael Mahon, Maysam Mohammadi

    Corrosion resistance of the lead-based anodes directly influences the purity of the final product in the zinc electrowinning process. The anodic MnO2 layer that is electrodeposited on the anodes durin

    Jan 1, 2016

  • CIM
    Effects of Mg, Si, and Cu on the Formation of the Al3Sc/Al3Zr Dispersoids

    By T. J. Langan, M. Ramajayam, T. Dorin

    "6xxx-series Al alloys are the most commonly used alloys in the automotive industry as they have an appropriate balance of strength, corrosion resistance and formability. The main strengthening phase

    Jan 1, 2018

  • CIM
    Preparation of Hydraulic-Cement Backfill

    By R. J. McLeod

    "A new backfill plant was constructed in 1966 adjacent to the mill of Giant Yellowknife Mines. The reasons for the addition were to increase the storage capacity for sand fill, provide facilities for

    Jan 1, 1968

  • CIM
    Management of Squeezing Ground Conditions at Laronde Mine

    By P. Turcotte, E. Karampinos

    "Construction of underground excavations in squeezing ground conditions faces several technical challenges that can result in delays in production and high costs due to rehabilitation. A review of the

    Jan 1, 2015

  • CIM
    Well Improvement Techniques 1n the Peace River Area

    By W. Hunka

    PACIFIC PETROLEUMS, Ltd. first discovered commercial quantities of gas in the Peace River area in 1952. Development of gas wells in this area is quite ex-pensive due to low penetration rates. To impro

    Jan 1, 1958

  • CIM
    The Rexspar fluorite and uranium deposits

    By Jean Descarreaux

    "The Rexspar uranium deposits are located near Birch Island in central British Columbia. The property lies within the Omineca crystalline belt of the Cordilleran Orogen. Gneiss, schist, tuffaceous and

    Jan 1, 1986

  • CIM
    Tax Incentives-Or Tax Problems?

    By R. D. Brown

    "AbstractOver the past five years, tax rates in the Canadian mining industry have skyrocketed upward across Canada, as both federal and provincial governments have sought to increase their share of mi

    Jan 1, 1977

  • CIM
    Experimental Parameter Identification For a Dynamic Model of a Continuous Rod Mill

    By H. W. Smith, R. D. Fournier

    This paper presents the results of an investigation of a full-scale rod mill. Appropriate numerical techniques are developed for the experimental determination of the parameters of a dynamic mathemati

    Jan 1, 1972

  • CIM
    Droplet Generation and Residence Time in Slag during Top Blown Oxygen Steelmaking

    By Subagyo, Geoffrey Brooks, Ken Coley

    The generation of droplets and their subsequent reaction in the emulsion is critical to the overall kinetics of oxygen steelmaking. High temperature experiments have been performed at McMaster Univers

    Jan 1, 2004

  • CIM
    Quasi-Static and Dynamic Strengths of Rectangular Prismatic Marble Specimens with Different Height-to-Width Ratios

    By D. Y. Li, C. D. Ma, T. Zhou, T. J. Cheng

    In this paper, a number of experimental tests are carried out to study the strength difference on rectangular prismatic marble specimens with different height-to-width (H/W) rations. The specimens hav

    Jan 1, 2015

  • CIM
    Case history of Borehole Pulse EM surveys at the Falconbridge Lindsley discovery in Sudbury

    By D. Crone, T. Watts

    "The Lindsley project was a program of deep drilling to test the contact down-dip from two nickel-copper deposits, one uneconomical and the other mined out. The role of Borehole Pulse EM(PEM) was to d

    Jan 1, 1992

  • CIM
    Evaluation of Copper Losses Using Flow Patterns in the Cl-Furnace of the Mitsubishi Process

    By H. Sakurai, M. Kato, F. Tanaka

    The Mitsubishi Continuous Copper Smelting/Converting Process employs an electric furnace (CL- furnace) for settling the slag/matte mixture formed in the smelting furnace. The conditions in the CL- fur

    Jan 1, 2019

  • CIM
    Rock Engineering Design and the Evolution of Eurocode 7: The Critical Six Years to 2020

    By A. Perucho, J. P. Harrison, A. Bedi, L. Alejano, L. Lamas, A. Sofianos, A. M. Ferrero, R. Migliazza, R. Olsson, J-F. Mathier

    "In 2010, the Eurocode for Geotechnical Design, EN-1997-1:2004 (CEN, 2004), informally known as Eurocode 7 or EC7, became the Reference Design Code (RDC) for geotechnical design – including rock engin

    Jan 1, 2015

  • CIM
    The French Mine, Hedley, B. C.

    By John Lamb

    "The French Mine (formerly the Oregon) is 4 miles by road south of the Nickel Plate Mine. It lies on the steep eastern slope of the Similkameen River valley at elevation 4,000 feet, between Cahill and

    Jan 1, 1949