Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ore characteristics that Affect Breakage and Mineral Liberation during Grinding

    By W. Petruk

    A study was undertaken to determine whether interrelations between mineral grains affect ore breakage during grinding, and to establish a correlation between ore breakage and mineral liberation. A bas

    Jan 1, 1988

  • CIM
    Estimation of Rock Block Strength

    By M. Pierce

    Empirical relations exist for the estimation of rock block strength at scales larger than standard core sizes. Two recently published relations account for the significant impact that microflaws (pore

    May 1, 2009

  • CIM
    Prototype Test Results & Data Analysis

    The cost benefits of controlling dilution of extracted ore have been very well understood by miners and mining professionals for many years. However, as we strive towards more mechanization, the dilut

    May 1, 2009

  • CIM
    Estimating Bulk Density for Mineral Resource Reporting

    By G. J. Arseneau

    ABSTRACT Mineral resource statements are reported as tonnage (volume × density) and grades. Effort is expended to accurately estimate the volume and grade, but accurately determining bulk density is o

    Jan 1, 2014

  • CIM
    Quantification of the DSM Potential of Commercially Available Energy Conservation Technology Applications at Present and Future Hard Rock Mines in British Columbia

    By Andrew Bamber

    The mining and beneficiation of minerals is the second largest end-use of electrical power on the planet, and comminution is by far the largest single contributor to this. Several jurisdictions, inclu

    Aug 1, 2013

  • CIM
    Multiple Episodes of Brecciation and Mineralization Associated with an Epizonal Granite Porphyry, True Hill, Southwestern New Brunswick (578bee99-f8fc-4e30-9877-4f1e464b4c56)

    By David R. Lentz

    At True Hill in southwestern New Brunswick, low-grade porphyry-style Bi-8n-Mo greisen mineralization is associated with the cupola of an epizonal granite porphyry (granite) that also exhibits three ep

    Jan 1, 1994

  • CIM
    A modified accumulator method for measuring surface radon flux from a uranium tailings pile

    By T. P. Lim, N. K. Davé

    "A modified accumulator method was devised to measure surface radon flux from porous media. It consists of a collector hood type of accumulator with a homogenizer pump and a pressure balancer. The lat

    Jan 1, 1982

  • CIM
    Initial Slope Stability Study of Undercut Slope at Area 4.1 Mae Moh Mine, Lampang, Thailand

    By Cheowchan Leelasukseree

    Mae Moh mine, operated by Electricity Generation Authority of Thailand (EGAT), is the largest open pit mine in Southeast Asia. Its production is approximately 15 million lignite tons and 90 million m3

    Jun 1, 2012

  • CIM
    Considerations for Technology Introduction Under the Explosive Free Rock Breakage Explosive-Consortium

    By Bétournay. M. C.

    Advantages ?Safety ?Health ?Rapid, continuous development, productivity ?Stope dilution reduction Disadvantages ?High cost and long time for equipment development ?Hard rock mining condition l

    May 1, 2009

  • CIM
    The East Sullivan Stock and its Gold-Copper Potential, Val d’Or, Quebec, Canada

    By Mehmet F. Taner

    "Abstract - The East Sullivan Stock (ESS) is a small, composite felsic alkaline pluton of presumed late Archean age in the Val d’Or mining district. Three main facies have been distinguished: monzonit

    Jan 1, 1996

  • CIM
    Single Pass Bolting Approach for the Stabilisation of Rock Masses in High Stress Conditions

    By François Charette

    High stress conditions in underground mines push the performance envelope of support systems to their limit. In weak rock masses these conditions lead to large deformation and breakdown of the rock ma

    Nov 1, 2011

  • CIM
    Monodispersed Gold Nanoparticles Capped by Myristate and PPh3 Ligands Prepared by Controlled Thermolysis of [Au(C13H27COO)(PPh3)]

    By Mari Yamamoto

    Controlled thermolysis of gold(I) complex, [Au(C13H27COO)(PPh3)], at 180 °C for 5 h under an N2 atmosphere affords the new type of monodispersed spherical gold nanoparticles capped by myristate and a

    Oct 1, 2003

  • CIM
    Co-Precipitation of Magnesium-Aluminum From Aqueous MgCl2-AlCl3 Solutions

    By Wencheng Gao

    An attractive way to beneficiate magnesium chloride and aluminum chloride is to prepare Mg-Al spinel, an excellent refractory material. Mg4Al2(OH)14?3H2O, the precursor of spinel, can be prepared usin

    Oct 1, 2011

  • CIM
    Control Of Copper Acid Main Drainage By Means Of Immobilizing Agents: Electrochemical Study On A Grain Model

    By S. Jordanov

    The nature of processes that take place on top of copper bearing grains during the suppression of copper acid drainage from mine tailings was studied on a grain model. Cyclic voltammetry (C.V.) was em

    Jan 1, 2007

  • CIM
    Mitigation of Plating Residue through Control of Anode Pitting During Nickel Electrodeposition

    By I. J. Burgess, B. C. Barlow

    "The electrodissolution of nickel pellets with different controlled electrical variables was investigated in an effort to mitigate plating residue in Watts bath based electroplating cells. During galv

    Jan 1, 2016

  • CIM
    Inspection Techniques

    By Tom Shumka

    Introduction ?This technique detects 100% of all gear tooth surface indications, providing comprehensive data, and has the ability to size indications accurately. ?The remarkable advantages of ECA t

    May 1, 2011

  • CIM
    Pilot plant study on improved electrostatic precipitation of copper converter dust

    By L. Lamothe, C. H. The

    "Pilot precipitator tests were conducted at Noranda's Horne Smelter in late 1978 to evaluate methods of improving converter dust collection efficiency. A bout 35 Nms/min. of converter off-gas wer

    Jan 1, 1985

  • CIM
    Backfill practice and technology at Kidd Creek Mines

    By T. R. Yu, D. B. Counter

    "Kidd Creek Mines primarily employs sublevel blasthole stoping for underground mining operations. During pillar recovery in No.1 Mine and panel mining in No.2 Mine, the free standing fill exposures ma

    Jan 1, 1983

  • CIM
    Discovery of Kimberlites in the Kirkland Lake Area Northern Ontario, Canada - PART I: Early Surveys and the Surficial Geology

    By D. A. MacFadyen, J. J. Brummer, C. C. Pegg

    "The first record of a kimberlite found in Canada (1946) was the identification of thin dykes intersected while drilling for gold in Michaud Township, Ontario.Sampling of the Munro Esker (1964) in the

    Jan 1, 1992

  • CIM
    Some Geochemical Considerations for Platinum-Group-Element Exploration in Layered Intrusions (538dc986-ca54-4e8c-8b54-af3cdab56d86)

    By A. E. Boudreau

    It has long been recognized that platinum-group-element (PGE) deposits in layered intrusions preferentially occur in intrusions that crystallized from high-Mg parent magmas. Recent studies suggest tha

    Jan 1, 1995