Loading of Au(CN)2 - Solution Onto Activated CarbonBy Linge HG, Klauber C
The key element in the carbon-in-pulp process for gold processing is the loading of dissolved Au(CN)2 from solution onto activated carbon. The mechanism and kinetics of this step have been examined
Jan 1, 1989
-
The Design of Pre-split BlastsEffective pre-splitting is a key feature of wall control blasting. Most mining operations use historical designs or rules-of-thumb for designing pre-split blasts. If productivity and safety benefits
Jan 1, 1995
-
Expansion at Mt. Leyshon to Treat 2.0 MTPA Primary OreThe process selection and design aspects to treat primary ore in a new carbon-in-pulp (C.I.P.) plant while utilizing, where possible, existing equipment and infra- structure are discussed. The exis
Jan 1, 1989
-
Diagnostic Monitoring of Concentrator Circuits with Random Forest ModelsDiagnostic Monitoring of Concentrator Circuits with Random Forest Models
Sep 13, 2010
-
Direct gold measurement for bulk ore sortingBy Y V. Haarlem, P Coghill, N G. Cutmore, M Millen, I Carter
Due to the low concentration of gold, ore sorting for gold has always required measuring indirect properties, such as density or colour, to allow separation on a rock by rock basis. This only works on
Nov 10, 2020
-
Shotcrete Lining Design for Underground Excavations in Rock û The Current State of PracticeBy B Bendtsen, L McQueen
The use of shotcrete as an efficient means of both temporary and permanent ground support has continued to grow over the last 30 years, with its use underground now commonplace around the world. Howev
Jan 1, 2008
-
Column Flotation: Some Plant Experience and Model DevelopmentBy Amelunxen R, Finch JA
Flotation columns represent an important addition to flotation practice. Columns have largely replaced. conventional machines in molybdenum cleaning in Canada. Columns have been successfully tested on
Jan 1, 1985
-
Living with Change at South Bulli CollieryBy Ogilvie M
South Bulli is the oldest and largest underground coal mine in Australia. Two longwall units are in operation and current production is 2.5 to 3 million tonnes of run of mine product per year with a w
Jan 1, 1991
-
Current Drilling and Blasting Practice in the 1100 Orebody-Mount IsaMount Isa Mines Ltd. annually extracts 5.6 million tonnes of copper ore from the 1100 Orebody. All production is by longhole open stoping, with an increasing emphasis on pillar recovery. Drilling an
Jan 1, 1988
-
The Design and Construction of a "Batcave"By D Dickson
The properties along Ida Avenue in Mosman stand 10 m above the road on an outcrop of Sydney sandstone. Access to the houses is generally via a long steep staircase. The owner of 22 Ida Avenue identifi
Jan 1, 2008
-
Mineralogy Controlling Metallurgy at Ernest Henry MiningBy Barns K. E, Munro P. D, Brindley S. K
Ernest Henry Mining Pty Ltd started production in August 1997. The Ernest Henry orebody consists of two distinct parts, a complex supergene ore zone overlying a primary ore zone. The economic copper
Jan 1, 1998
-
The Evolution of Cut and Fill Mining at Isa MineBy Wright J
Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t
Jan 1, 1988
-
In-Pit Crushing and Conveying (IPCC) - A Tried and Tested Alternative to TrucksBy A Cooper
The current financial climate has given rise to fears that falling mineral prices and tight credit will force mining companies to cut back on production and new project development in a bid to cut cos
Jan 1, 2009
-
Beaconsfield Gold Mine - Ironing Out the BugsThe Beaconsfield gold mine processing plant is a complex operation and utilises crushing, grinding, gravity gold concentration, sulfide flotation, bacterial oxidation, cyanidation and zinc cementation
Jan 1, 2007
-
Rock Relationships and Mineralization at Mount MorganThe Mount Morgan massive sulphide body occurs in a volcanic sequence of Lower or Middle. Devonian age, which is subdivided in the mine into "Upper mine porphyries", "Banded mine sequence", and "Lo
Jan 1, 1974
-
Warkworth Mining Ltd OperationsWarkworth Mining has been successfully operating a large open cut coal mining operation in the Hunter Valley of NSW since 1981.The mine is a complexmulti seam operation and utalises both truck and sho
Jan 1, 1992
-
Reliability of Predictive Methods for Control of Roof Strata in Longwall FacesIn a state-of-the-an review of predictive methods for longwall support load calculation, special respect is paid to those techniques which enable actual roof conditions and local lithology of strata t
Jan 1, 1991
-
Experiences n the Development of an Operaor Guidance System for On-Line Process Control and Fault DiagnosisBy Jelenich L, Murray J. Rantanen J
The experience gained in the development of an Operator Guidance System (OGS) for on-line process control and fault diagnosis in a commercial scale sintering process will be discussed in this paper.
Jan 1, 1995
-
The Design of the Rosebery (Tasmania) Concentration Mill - Factors Influencing Choice of EquipmentBECAUSE of the attention given in recent years to the flotation process, there is an extensive range of equipment available to any staff detailed for: the design of a flotation mill. This statement ap
Jan 1, 1929
-
Productivity Gain from Advances in Mining Geology - Signposts for the FutureBy White A, Price G
The main assets of a mining company are its orebodies; the second are the people who find and use them.The graphs in Figure 1 were derived from a paper by Rob Macdonald of Rothschild Australia present