Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mixed alkali effect on structure of Al2O3-based slags

    By S H. Hyun, J W. Cho

    Jun 19, 2024

  • AUSIMM
    Problems of Secondary Breaking

    Experimentation with new methods, materials and machines to improve primary drilling and blasting is a continuing practice in the hard rock quarry operations of the BMI Group. These experiments wil

    Jan 1, 1978

  • AUSIMM
    Aberfoyles Case History: Survival and Diversification through Exploration

    The company was formed in 1926 to exploit tin bearing veins adjacent to Aberfoyle Creek in north-east Tasmania. In 1928 a 923ft tunnel was driven to explore and develop the mine 150ft below surfac

    Jan 1, 1987

  • AUSIMM
    Rotary Blast Hole Drills a Comaparison

    This data is intended to provide a quantative cost comparison of one 40 800 kg. pull down rotary blast hole drill versus two smalter drills in the 18 100 kg. pull down class. While this cost anal

    Jan 1, 1986

  • AUSIMM
    Pilot Plant Treatment of Waste Liquors at Risdon

    In 1975, following a programme of solution characterization and small scale laboratory test work, a pilot plant was constructed to treat waste liquors from the Risdon works. The plant was designed

    Jan 1, 1977

  • AUSIMM
    Underground Stope Drill and Blast Designs Optimisation Program

    By C Preston, T Williams, D Roy

    The easiest way to mine valuable orebodies is through the use of explosives and well-planned blasting layouts that produce fragmentation profiles designed specifically for conveyance equipment in unde

    Aug 24, 2015

  • AUSIMM
    Guide Alignment in Mine Shafts

    Based on a principle developed at a South African Mine, the CSIR developed a device with which the alignment of guide rails in mine shafts could be measured. Originally the technique could only be use

    Jan 1, 2005

  • AUSIMM
    The Race to Finish - From Design to Completion - 5 Km of Three Lane Road Tunnel in Three Years

    By G Munro

    he Melbourne City Link project will complete a missing link between two existing major freeways in the Melbourne road network, providing a much needed bypass of the Central Business District for throu

    Jan 1, 1999

  • AUSIMM
    Paper No. 190. Notes The Mining Public Concerning Certain Mistaken Ideas.

    THOSE who dabble in m.ining are no exception to the general rule that persons who know a little of a subject are apt to think that they know all about it. Some colour may be lent to the belief that an

    Jan 1, 1911

  • AUSIMM
    Control of Ore Flows at Opencasts

    By M A. Faizulin, N G. Stukalova

    The present till now practice of averaging of ore by metal content at mining-dressing enterprises does not allow evaluating objectively really existing regularities of dressing process. The processing

    Jan 1, 2003

  • AUSIMM
    Resource Optimisation With Simulation

    By A Ruotsalainen

    Mining industry sees a comprehensive future in optimisation and process control. High resource utilisation is a starting platform when lower operational costs with higher rate of return are the target

    Jan 1, 2003

  • AUSIMM
    Chain Pillar Design ù Can We?

    By H Jalalifar, N Aziz

    In the ten years since the University of NSW proposed a pillar design methodology for bord and pillar operations, the Australian coal mining industry has changed substantially. What was primarily a bo

    Jan 1, 2005

  • AUSIMM
    Fuel-Its Combustion and Economy

    The subject of the present paper will be combustion of fuel and as the combustion of fuel requires a certain amouut of air to effect combustion the question might be asked what is air?Air is composed,

  • AUSIMM
    A Review of General Considerations for Assessing Rock Mass Blastability and Fragmentation

    By P Lilly

    Blasting is the primary comminution process in most mining operations. This process involves the highly complex and dynamic interaction between two main components. The first is the detonating explosi

    Jan 1, 2001

  • AUSIMM
    Facing the Post-Industrial Era

    Giving the keynote address in the final session of a conference dealing with closely related topics has a disadvantage in that much of what can be said has been said. It also has an advantage, how

    Jan 1, 1978

  • AUSIMM
    The Need for Quality Control in Sampling Due to Evaluation Advances at Anglo Platinum

    Anglo Platinum recognised with its expanded operations the need to change its evaluation strategy due to increased sample volumes and the pressure it created at laboratories. The sender/receiver analy

    Jan 1, 2008

  • AUSIMM
    Frother Evaluation

    By Quinn P, Robertson G, Agar GE

    The replacement of diphenylguanidine (DPG) for separating INCO Bessemer matte with a water soluble collector requires a frother since most collectors do not have frothing properties. The objective o

    Jan 1, 1993

  • AUSIMM
    Multiples of Exploration Expenditure as a Basis for Mineral Valuation

    The ""multiple of exploration expenditure"" method of mineral valuation is applicable to exploration properties from the earliest stage of exploration to a moderately advanced stage but for which n

    Jan 1, 1994

  • AUSIMM
    Highwall Trench Mining as a Primary Production Method of Coal Extraction

    Oaky Creek Coal (OCC) has embarked on an ambitious program to fast track the introduction of Trench Mining into its current mining operations. The project has the capacity to allow the extraction of r

    Jan 1, 1992

  • AUSIMM
    Remnants of Ancient Australia in Vanuatu – Implications for South-west Pacific Tectonics and Mineralisation Potential

    By S W. Richards, J Buys

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Magmatic arcs are prime targets for porphyry- and epithermal-style mineral deposits, althou

    Mar 18, 2015