Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Borehole Imagery in Iron Ore - Examples from the Hamersley Group, Western Australia

    The borehole televiewer is a downhole geophysical logging device that produces continuous, oriented, 360¦ images of the drill hole wall. Two types of borehole images are currently being generated at t

    Jan 1, 2007

  • AUSIMM
    Stability of Hydraulic Backfill Barricades (eefd356e-6d40-4b19-af58-7f0537046a1f)

    Hydraulic backfill is generally retained in slopes using permeable barricades. Mitchell et a! (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades e

    Jan 1, 1998

  • AUSIMM
    Tubular Drainage and Lining Geocomposite for Mine Tailings and Heap Leach Pads

    By Y Durkheim, P Saunier, L Ameglio

    "In the last decade Afitex developed the Draintube™ geocomposite, which provides simultaneous drainage and waterproofing functions. This new type of drain tubes planar geocomposites (DTPG) differs fro

    Jul 27, 2015

  • AUSIMM
    Mining Under Indonesia's New Environmental Law

    The new law on Environmental Protection and Management (Republic of Indonesia Law 32 of 2009) was passed by the Indonesian parliament in September 2009. This law aims to protect Indonesia's rapid

    Jun 1, 2010

  • AUSIMM
    Commercial Underground Space – Planned Development for the Future

    By A C. Robertson

    World urban expansion puts constraints on the available land surface area of our major cities both for accommodating people as well as providing infrastructure and services whilst at the same time att

    Sep 17, 2014

  • AUSIMM
    Understanding minerals in mineral processing – the basics and beyond

    By E M. Wightman, C L. Evans

    A recent survey of mineral processors undertaken as part of the International Mineral Processing Council (IMPC) Education Commission identified mineralogy as one of the key skills required for mineral

    Aug 29, 2018

  • AUSIMM
    A New Method for Sampling from High Capacity Screens

    By B W. Atkinson

    Full-stream mechanised sampling apparatus, that collect a full cross-sectional increment from the complete screen discharge, will always be the preferred option for sampling screen overflows. However,

    Aug 21, 2012

  • AUSIMM
    An electrochemical investigation on the mechanisms of interfacial interactions of a xanthate collector on PGM mineral surfaces in the presence of ions

    By L Dzinza, K C. Corin, M Tadie

    The recycling of process water comes with increased electrolyte concentrations that affect water quality, which may in turn affect the flotation performance of valuable minerals (Hirajima et al, 2016)

    Aug 24, 2022

  • AUSIMM
    The Paulsens Transformation – A Shining Light under a Northern Star

    By C Jones

    When the Paulsens operation was poised to be placed on care and maintenance, Bill Beament and the rest of the Northern Star Resources (NSR) team capitalised on the opportunity to send the Ashburton re

    Mar 24, 2014

  • AUSIMM
    A Strain-based Failure Criterion for Pillar Stability Analysis

    By A Karrech, C Schrank, O Gaede, I Canbulat

    Strain-based failure criteria have several advantages over stress-based failure criteria: they can account for elastic and inelastic strains; they utilise direct, observable effects instead of inferre

    Nov 5, 2014

  • AUSIMM
    Review of Seam Gas Drainage in Australia

    By Lunarzewski L

    Gas problems, largely instantaneous outbursts of coal and gas, arose in the early days of coal mining in Australia, leading to attempts at predrainage often including destressing. With deeper mining a

    Jan 1, 1985

  • AUSIMM
    The Kinetics of the HDO-H2 Isotope Exchange Reaction on Liquid Silica-Saturated Iron Silicates

    By Belton G. R

    The kinetics of the interfacial reaction of H2O on liquid silica-saturated iron silicates has been studied by means of measurement of the HDO-H2 isotope exchange reaction. The apparent first order

    Jan 1, 1987

  • AUSIMM
    New Tailings Dam at Ardlethan Tin N.L.

    In May 1977 a new dam was commissioned for disposal of 600,000 metric tonnes/year of tailings. Design basis, costs and construction problems are described. Problems arose, assoc- iated with lack of

    Jan 1, 1978

  • AUSIMM
    The True Values and Uses of Coal Seam Gas Water

    Arrow Energy NL has been operating a number of coal seam gas wells in the Darling Downs region of Queensland. At the time of writing this paper, the region is enduring an extended drought period. The

    Jan 1, 2006

  • AUSIMM
    Coalmine ventilation – examining the past, looking to the future

    By J M. Galvin

    History attests to the catastrophic consequences that fire, explosion and contaminated, noxious andirrespirable atmospheres can have for workplace health and safety in underground coal mining. It also

    Oct 12, 2022

  • AUSIMM
    Mine Geology Practices at the Sunrise Open Pit

    By P Williams

    The Sunrise deposit is one of AustraliaÆs largest and most profitable gold deposits. It has consistently and spectacularly outperformed every resource model created. Currently over the life of the Sun

    Jan 1, 2000

  • AUSIMM
    Predicting Slope Stability in Open Pit Gold and Coal Mines

    By L Clarke, R N. Campbell, F Bourke, J Anderson

    Lithological units have been classified geotechnically with mechanical tests and discontinuity measurements from the GRD Macraes Limited, Macraes Gold Project and Rotowaro coal mine open pits, New Zea

    Jan 1, 2000

  • AUSIMM
    Development of a Toxicity Approach to Evaluate Free Cyanide and Metal Cyanide Complexes in Waters Associated with Gold and Other Mining

    By H Sichani-Teimouri, B N. Noller, J C. Ng, R N. Alsaadi, P L. Breuer, S Shini

    Cyanide has been used for over a century worldwide for gold extraction. However, the presence of several metals and metalloids in ore requires greater amount of cyanide for an efficient gold recovery

    Jul 16, 2014

  • AUSIMM
    Red Dome Stage III Cutback - A Case Study in Brinkmanship

    By Paine G. G

    The Red Dome Gold/Copper Mine is located approximately 15 km west of the township of Chillagoe which itself is approximately 220 km by road west of Cairns, Far North Queensland. The deposit, with ot

    Jan 1, 1994

  • AUSIMM
    The use of Conditional Simulation for Drill Hole Spacing Evaluation and Decision-Making in Telégrafo Project, Northern Chile

    By O Rojas

    The Telégrafo copper – gold deposit is located in the Centinela district of the Antofagasta region in northern Chile. Telégrafo is a porphyry copper deposit of Eocene – Oligocene age which h

    Aug 22, 2011