Search Documents

  • DFI
    Inspector's Manual For Driven Pile Foundations ? Introduction

    This manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an

    Jan 1, 1997

  • SME
    New Bulkhead Design For Controlling Increased Hydrostatic And Dynamic Hydraulic Pressures

    By George Watson, Gu Quanzhong, S. Gerard Sawyer

    Bulkheads, also known as hydraulic seals, are used to seal abandoned workings and protect adjacent active mines from explosion and control unwanted inflows of water from poorly sealed shafts, water-be

    Jan 1, 2005

  • AIME
  • SAIMM
    Compliance With International Environmental Standards And Expectations: Review Of International Developments - Introduction

    By J. Glazewski

    The mining industry in South Africa has developed its own environmental guidelines in the form of an Aide-Mémoire1,which is an extension of the previous rehabilitation provisions to include all aspect

    Jan 1, 2000

  • SAIMM
    Annual Report - For The Year Ended 30th June, 2000

    Council for 1999/2000 President M.H. Rogers President Elect Dr L.A. Cramer Vice Presidents Senior A.A.B. Douglas Junior S.J. Ramokgopa Immediate Past President J.R. Dixon Hon

    Jan 1, 2001

  • AUSIMM
    Taking it to the Streets - Recent Experiences of Participation in the Initiation

    Newmont Waihi Operations is participating in the initiation of a community liaison forum in association with the local district council. The objective is to provide a forum for the free and regular e

    Jan 1, 2003

  • SME
    Geometallurgy For A Two Recovery Process Operation ? Cripple Creek And Victor Gold Mine, Colorado

    Cripple Creek and Victor Gold Mine is an epithermal gold deposit located in the Rocky Mountains of Colorado. Surface operations are continuing along with an expansion for an onsite mill to take place

    Feb 27, 2013

  • SAIMM
    Development And Test Of A Sociotechnical Model For Accident/Injury Occurrences In Underground Coalmines

    By P. S. Paul

    Mine accidents/injuries are complex and generally characterized by several factors, from technical to social characteristics. In this paper, a sociotechnical model for work injury in mines was develop

    Jan 1, 2005

  • SAIMM
    A Comparative Study Of The Performance Of Single Neural Network Vs. Adaboost Algorithm Based Combination Of Multiple Neural Networks For Mineral Resource Estimation

    By B. Samanta

    This paper investigates the performance of the neural network technique in a placer deposit situated at the Nome district in Alaska. Initially a single neural network model was constructed to estimate

    Jan 1, 2005

  • AUSIMM
    Copper Recovery from Printed Circuit Board by Carbonisation

    Copper Recovery from Printed Circuit Board by Carbonisation

    Sep 13, 2010

  • CIM
    Successful Design of the NICO Grinding Circuit for Unusually Hard Ore

    By Mike Samuels, John Starkey

    "This paper examines test results and grinding mill design for the recent Fortune Minerals’ NICO Project, located in the Northwest Territories. SAG milling and rod milling options are compared. Rod mi

    Jan 1, 2010

  • SAIMM
    Development Of A Mineral Flotation Frother For Nchanga Mine On The Zambian Copperbelt

    By H Zimba, S Sondashi, M Chitambo

    By the time a reagent is finally accepted by a mine for use on its plant it could have gone through several screening and evaluation stages. These stages may include laboratory and plant evaluation te

    Jan 1, 2007

  • AIME
    Further Discussion of Fracture Gradient Prediction and Its Application in Oilfield Operations

    By T. K. Smith

    The comments contained in the discussion of the paper concerning the prediction of fracture gradients are of considerable interest, since the subject is of a very controversial and timely nature. It i

    Jan 1, 1970

  • SAIMM
    Reply To N.M. Vegter ?Discussion On The Kinetics Of The Elution Of Gold From Activated Carbon? - In The Journal Of SAIMM, Vol. 97. 1997. Pp. 197?200

    By M. J. Nicol

    Mr Vegter has analysed, in some depth, the approximations made in the treatment of the kinetic data presented in the original by ourselves (ref.1) and has come to the conclusion that ?under the experi

    Jan 1, 1997

  • TMS
    Main Parameters On The Performance Of A Desulfurization Of Ferro-Nickel By Slag Reaction

    By M. Hochenhofer

    Keywords: desulfurization, mathematical model, slag reaction To produce ferroalloys like ferro-nickel for alloying purposes in a quality that meets the requirements of today?s steel industry, refi

    Jan 1, 2005

  • ISEE
    The Importance of Saving the Full Wave Form and Frequency Analysis

    By Randy Wheeler

    The importance of having full wave form information for recorded blast events cannot be overstated. Knowing the peak particle velocity and the frequency at the peak are the tip of the iceberg. This pr

    Jan 1, 2005

  • SME
    The Route To More Efficient Blind Shaft Drilling?

    By Colin P. Pigott

    The paper describes a variety of existing techniques and equipment which when combined together permit faster and cheaper drilling of shafts in soft to medium strength formations. Drilling fluid circu

    Jan 1, 1985

  • SME-ICGCM
    Mine Seals ? A Rational Base for Design and Construction

    By Kot Unrug

    Mine seals are necessary in nearly every mine to isolate mined-out areas from the ventilation network. There is a large number of seals in active mines and that number continually increases as the de

    Jan 1, 2008

  • TMS
    Operational Improvements For RH-KTB Degasser Of Companhia Siderurgica De Tubarao (CST) Steel Plant Through A Physical Modeling Study (Invited) (24d39e1f-c171-4640-928f-ad9402b36024)

    By Varadarajan Seshadri

    A physical model based on similarity principles was constructed for simulating the RH degasser of CST (Companhia Siderurgica Tubarao, Vitoria, ES, Brazil) to evaluate the circulation rate of the metal

    Jan 1, 2003

  • DFI
    Non-Linear Analysis Of Large Pile Groups For The New Wembley Stadium

    By S. Hardy

    The paper describes state of the art non-linear analyses of the pile groups that were employed during the raising of the 133m high triumphal arch which forms the centre piece of the new Wembley stadiu

    Jan 1, 2006