Search Documents

  • IOM3
    New biological treatment plant for heavy metal-contaminated groundwater

    By L. J. Barnes, R. O. Koch, J. H. Versteegh, C. J. N. Buisman, P. J. H. Scheeren

    Several water treatment options have been studied and piloted. A process based on activity of sulphate reducing bacteria combines sulphate removal and heavy metal removal in one process step. The anae

    Jan 12, 1992

  • ISEE
    Characterizing Explosives and Blasting Emissions (International Society of Explosives Engineers)

    By MacDonald B. Johnson, Douglass P. Bacon

    "W ith the advance of science, rise of public interest in environmental matters, and continuing erosion of air quality, federal and state regulators are demanding an increasing complex array of data c

    Jan 1, 1995

  • ISEE
    Florida Mining Blast Vibration Study Part 3: Data and Analysis Review

    By Tristan Worsey, Nathan Rouse

    The Florida legislature allocated funding for the Florida State Fire Marshal (FSFM) to review the applicability of the United States Bureau of Mines (USBM) Report of Investigations (RI) 8507 blast vib

    Jan 1, 2019

  • AUSIMM
    Improving the Sustainability of Primary Metal Production - The Need for a Life Cycle Approach

    Improving the Sustainability of Primary Metal Production - The Need for a Life Cycle Approach

    Sep 13, 2010

  • SAIMM
    Multi-Component Diffusion Of Metal Ions In Lime-Alumina-Silica Slags

    By M. D. Dolan

    In this study, the development of a new method for investigating the diffusion of metal cations in multi-component slag systems, using microprobe analysis is discussed. This method allows the analysi

    Jan 1, 2004

  • SME
    Has Minerals Industrial Technology Peaked?

    By Robin J. Batterham

    We still need to innovate, but it is getting harder. The real price of metals is declining, return on shareholder value is lower than other industries, and there is a shorter-term focus on staying via

    Jan 1, 2004

  • AIME
    PART II - Communications - Determinations of Beta-Tin Crystallographic Orientations

    By R. W. Vieth, S. A. Bradford

    THE orientations of tetragonal tin crystals are commonly examined by either the transmission Laue method or the back-reflection Laue method. The predominant planes and zone axes of the pattern are plo

    Jan 1, 1967

  • SAIMM
    Development Of A Mathematical Model For Continuous Tank Bioleaching

    By L. Bircumshaw

    Paper written on project work carried out in partial fulfilment of BSc (Eng) (Chemical) degree This paper details the formulation of a mathematical model for the simulation of a primary bioleach re

    Jan 1, 2006

  • SAIMM
    A Technical And Operational Audit Of The First Ten Years Of The Teniente Converter Operations At Nkana Smelter

    By M. Syamujulu

    In 1994, Nkana smelter commissioned a multimillion US Dollar Chilean Teniente converter (CT) in its operations in order to improve its smelting technological base. The main objective was to reduce the

    Jan 1, 2005

  • NIOSH
    U. S. Bureau Of Mines Training Workshop On The " MFIRE " Mine Fire And Ventilation Simulator - MFIRE Users Manual Version 2.20 August 1995 – 1.0 Introduction

    MFIRE is a computer simulation program that performs normal ventilation network planning calculations, and dynamic transient state simulation of ventilation networks under a variety of conditions. The

    Jan 1, 1995

  • CIM
    A liquefaction incident in a fill raise: A case study

    By F. Hassani, K. Moozar, J. Ouellet, P. Gauthier

    "This paper describes a sudden spill of waste rock used for backfilling from a waste pass at an underground mine in Canada, thus causing a major failure/accident. The mine operator immediately launche

    Jan 1, 2004

  • TMS
    Enhanced Recovery of Manganese and Silver from Refractory Ores Through Biotreatment

    By P. A. Rusin

    Many manganiferous silver deposits remain undeveloped because standard chemical extraction methods yield poor recoveries or are ' environmentally unacceptable. Biotreatment of such ore deposits i

    Jan 1, 1991

  • SME
    Atlanta North-South Tunnel

    By Samer Sadek

    The Georgia Department of Transportation (GDOT) undertook an exploratory feasibility study to one of the most ambitious tunneling projects in the United States. HNTB Corporation was retained to perfor

  • CIM
    UNIMAX SD100 Depressant - A Cyanide Replacement

    By T. Schmidt, J. Merza

    "This study considers two lead/zinc/silver orebodies which have historically had a problem with pyrite, pyrrhotite and sphalerite contamination in the lead circuit. The problem was previously addresse

    Jan 1, 1992

  • AUSIMM
    Modelling Fines in Blast Fragmentation and its Impact on Crushing and Grinding

    By W Valery, S Morrell

    In the mining industry blasts are usually designed to fracture the in situ rock mass and prepare it for excavation and subsequent transport. The run of mine (ROM) fragmentation is considered good when

    Jan 1, 1999

  • SAIMM
    Direct Smelting Of Stainless Steel Plant Dust

    By T. J. Goff, G. M. Denton

    Mintek has developed the EnviroplasTM process for the treatment of solid wastes from the metallurgical industry, especially steel plant dusts, without requiring agglomeration to produce inert slag and

    Jan 1, 2004

  • AUSIMM
    Development Aspects of the Golden Cross Project

    Permitting, engineering and evaluation, detailed design and construction aspects of the Golden Cross goldmining project in New Zealand are briefly reviewed. The extremely lengthy and complicated gover

    Jan 1, 1990

  • IIMP
    Migración del sistema DRP al sistema de arquitectura integrada de información de procesos DRP

    By Orlando Gallardo

    El presente texto describe la implementación del software ADS (Sistema de Despliegue Activo) a los sistemas de control supervisor de los diferentes procesos del complejo metalúrgico a nivel administra

    Sep 24, 2008

  • CIM
    Encapsulation of Mercury in Gossan Tailings Murray Brook Mine, New Brunswick, Canada

    By Robert Harris, Peter Pheeney

    "The Murray Brook gold mine operated from September 1989 to March 1991. Approximately 1.2 million tonnes of gossan were mined from an open pit and treated at a rate of 900 tonnes per day. The facility

    Jan 1, 2001

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004