Search Documents

  • CIM
    Improving Mining & Minerals Plant Performance ? Operations and Maintenance Working Together using new Information Technology

    By Gregory A. Johnson

    Operations and Maintenance departments have long had an adversarial relationship. The widespread evolution and adoption of modern management techniques such as Reliability Centered Maintenance (RCM) a

    Feb 1, 2008

  • AIME
    Rutile – Zircon Mining on East Coast Surfing Beaches

    Rutile – Zircon Mining on East Coast Surfing Beaches – Rutile-Zirconium Producing Companies in Australia

    Jan 10, 1964

  • SAIMM
    Presidential Address: The Uranium Story - An Update

    By R. P. H. Willis

    Uranium is back on the radar. Uranium has always been a controversial metal, from its role in the arms race to its claim to be the only viable alternative to fossil fuel. This paper will cover its pro

    Jan 1, 2006

  • DFI
    Secant CFA- Pile Walls - A Risk Management View

    By Mandy Korff

    Walls consisting of CFA-piles are often used for vertical cut offs for building pits. Several methods of installation and geometry may be used and sizes, depths and strengths of walls necessary vary w

    Jan 1, 2006

  • SAIMM
    Metals And Alloys Water Solidification A Bridge From Pyro- To Hydro-Metallurgy

    By David Norval

    The increased tendency to use hydrometallurgy as an extraction step towards final refining following a pyrometallurgical smelting process requires melts which have to be cast and or comminuted which c

    Jan 1, 2005

  • SME
    The Ivar Project - An Uncommon, Everyday TBM Tunnel

    By Yngve Jordal, Sverker Hartwig

    The IVAR Project is Norway's largest sewer project presently under construction. One part of it is an 8.1 km (26 575 ft) long, 3.5 m (11 ft 6 in.) diam tunnel, bored in one year. The tunneling pr

    Jan 1, 1991

  • CIM
    The Griffith Mine Energy Reduction Program

    By J. Frostiak

    "This paper describes some energy reduction measures Implemented at the Griffith Mine. Before proceeding, I will give you a brief overview of the operation.The Griffith Mine is an iron ore mining, con

    Jan 1, 1983

  • SAIMM
    Mathematical Modelling For Optimization Of Mineral Processing Operations

    By M. Moys

    The use of temperature measurements for unusual applications in the analysis and control of column flotation and milling is discussed. This is followed by a review of some of the authors current resea

    Jan 1, 2005

  • CIM
    Process Mineralogy of Sudbury Platinum Group Minerals as Determined by Mineral Liberation Analyzer

    By Manqiu Xu, Andrew Lee, Frederick D. Ford, Cara Wercholaz

    "Platinum-group minerals (PGM) typically occur in such low concentrations that quantitative mineralogical evaluation is difficult or impossible. The FEI MLA system used by Vale Base Metals Technology

    Jan 1, 2011

  • SAIMM
    Mould Fluxes In Continuous Casting Of Steel - Characterization And Performance Tuning

    By M. Görnerup, M. Hayashi, S. Seetharaman, C. -Å Däcker

    The mould flux plays a crucial role in the continuous casting operation of steel due to its multi-functional assignment as lubricator and heat flux controller. In reality, the commercial fluxes can fa

    Jan 1, 2004

  • AUSIMM
    Wacker Sampling as an Effective Gold Exploration Tool in the Reefton Goldfield, Greenland Group, West Coast, New Zealand

    By M E. Dunphy, P Silversmith

    The Reefton Goldfield, both historically and potentially, represents a significant gold producing camp in the Westland province of New Zealand. Some two million ounces of gold have been produced from

    Jan 1, 1997

  • NIOSH
    RI 3787 Prevention of Benzene-Air Explosions by Addition of Nitrogen and Carbon Dioxide

    By G. W. Jones

    "INTRODUCTION As part of its work in promoting safety, the Bureau of Mines is investigating various means of eliminating or mitigating the explosion hazards of combustible gases encountered in mining

    Dec 1, 1944

  • AUSIMM
    Independent Review of the VALMIN Code

    The paper outlines the history and current status of the VALMIN Code and sets out the background, methodology, results and recommendations of the Independent Review of the VALMIN Code undertaken durin

    Jan 1, 2002

  • SME
    Pit Slope Design Challenges In Residual Soils And Weathered Rock: Background And A Case Study

    By J. Geyer, B. T. Burton, H. W. Newcomen

    For open pits developed in tropical climates the upper portions of the pit walls are often located in residual soils and weathered rock. Due to the presence of relict structures, and the relatively l

    Jan 1, 2000

  • NIOSH
    Programmable electronic and hardwired emergency shutdown systems: A quantified safety analysis

    By John J. Sammarco

    Abstract- Emergency shutdown systems (ESDs) for mining machinery provide critical functions to safeguard miners. Traditionally, ESDs were realized with simple hardwired circuits; today, there is a gro

    Jan 1, 2007

  • SAIMM
    An intelligent system for visual monitoring of the ECS complex of the ‘Majdan III’ open pit mine, ‘Potisje-Kanjiza’, Yugoslavia

    By K. Kasas, J Kermeci, S. Vujic, S. Secei, P. Kermeci

    On the ‘Majdan III’ open pit mine, supplying with brick clays the production plants of the industry of building material ‘Potisje-Kanjiza’ from Kanjiza, a modern ECS (excavator-conveyor-spreader) comp

    Jan 1, 2003

  • CIM
    Developing Solutions to Complex Flotation Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate flotation plants with high throughput presents unique metallurgical and environmental challenges that need to be addressed

    Jan 1, 2013

  • AIME
    Part VI – June 1969 - Communications - On the Subcritical Graphitization of Steels

    By P. O. Metz, E. L. Wiehe, J. S. Foster

    BASED on their analyses of growth kinetics, ibbs' and Harris et al.' have recently proposed that the rate of subcritical graphitization of steel is controlled by the rate of diffusion of car

    Jan 1, 1970

  • SAIMM
    The Corporate Cost Of Capital

    By E. V. Lilford

    Equity investors and project sponsors have divergent views about expected or minimum returns that should be generated by a mineral project. Irrespective of their views, the fundamental estimation of t

    Jan 1, 2006

  • CIM
    Water Management in Hydraulic Fill Operations

    By M. Helinski

    In the authors? experience inappropriate water management in hydraulic fill masses has been the root cause of most barricade failures. Inappropriate water management can lead to high water pressures,

    May 1, 2007