Search Documents

  • NIOSH
    RI 3521 Measurement Of Pressures On Rock Pillars In Underground Mines - Part II

    By Leonard Obert

    Part I of this report3/ proposed a sonic method for determining pressure, in situ, on rock pillar, arches, and other structures. The method required (1) a laboratory determination of the variation of

    Jan 1, 1940

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016

  • SME
    Monitoring Subsidence In The West: Problems And Analysis

    By John E. Rourke, O&apos

    This paper describes some of the results of a project for the design and demonstration of subsidence monitoring systems for underground coal mines. The project was designed to test monitoring systems

    Jan 1, 1982

  • SME-ICGCM
    Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal Mines

    By K. H. Brandt

    A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie

    Jan 1, 2004

  • NIOSH
    MLA 17-92 - Mineral Resources Of The Independence Range Special Study Area, Elko County, Nevada

    By Steven W. Schmauch

    The U.S. Bureau of Hines conducted e mineral resource survey of approximately 232,000 acres in part of the Humboldt National Forest, Nevada, during 1989. About 7S percent of the study area was covered

    Jan 1, 1992

  • NIOSH
    RI 3521 Measurement Of Pressures On Rock Pillars In Underground Mines - Part II ? Introduction

    By Leonard Obert

    [Part I of this report3/ proposed a sonic method for determining pressure, in situ, on rock pillars, arches, and other structures. Tin r Loa required (1) a laboratory determination of the variation of

    Jan 1, 1940

  • AUSIMM
    Simulation of Correlated Assay Variables - A Case Study from the Yandi Channel Iron Deposit

    By C De-Vitry

    "The large Yandi channel iron deposit (CID) is located in the north-west of Western Australia and is currently mined via open pit methods. Drilling at Yandi is widely spaced and current estimates are

    Aug 12, 2013

  • NIOSH
    IC 8213 Refractory-Clay Deposits Of Utah

    By Joel N. Van Sant

    An investigation was conducted to study possible sources of Utah refractory and structural clays that could be used for the manufacture of refractories and light or buff burning heavy-clay products. A

    Jan 1, 1964

  • NIOSH
    OFR-51-86 Lode Platinum-Group Metals Potential Of The Goodnews Bay Ultramafic Complex, Alaska

    By D. D. Southworth

    In 1981, 1982, and 1983, the Bureau of Mines examined the potential for lode deposits of platinum-group metals (PGM) in the Goodnews Bay ultramafic complex, Alaska. The complex consists of the Red Mou

    Jan 1, 2011

  • TMS
    As-cast Microstructures of Aluminum Containing Ductile Cast Irons

    By A. R. Kiani-Rashid

    In this paper, the effect of aluminum content on the formation mechanism, volume fraction, morphology and particle size distribution of graphite has been investigated. Addition of aluminum on ductile

    Jan 1, 2010

  • CIM
    Concentrator upgrade program at the Iron Ore Company of Canada, Carol Lake Concentrator: concentrator upgrade testing program; concentrator flowsheet development

    By Martin Nevens

    "In 1998, the Iron Ore Company of Canada initiated an aggressive program to improve the performance of its Carol Lake Concentrator located in Labrador City, Newfoundland. This program was termed the C

    Jan 1, 2002

  • AUSIMM
    The Greymouth Coal Project

    The Greymouth Coal Project is a proposal to mine by the application of proven hydraulic, and room and pillar underground mining methods; and to process the equivalent of an average of 1.7 million tonn

    Jan 1, 1997

  • CIM
    Implementation of Paste Backfill at the Williams Mine

    By Eric Konigsmann, Doug Spence, Scott Jones

    "The Williams Gold Mine is located in the Hemlo camp of Northwestern Ontario and is one of Canada’s largest gold producers with annual gold production of 400,000 ounces. The operation is owned and ope

    Jan 1, 2004

  • NIOSH
    RI 4591 Lead Smelting In The Ore Hearth III. Zonal Action In The Smelting Column

    By G. L. Oldright

    The first Report of Investigations of the present series (No. 4562) was on the fundamental properties of lead compounds, and the manner in which they set limits to the richness of lead products treate

    Jan 1, 1949

  • NIOSH
    IC 8285 Water Use In The Mineral Industry - With Appendix On The Projection Of Crude Material To 1985 By Barbara S. Lloyd (de51b37a-b6c5-4307-a7c1-7d3ce1692536)

    By Alvin Kaufman

    To aid industry and Government in planning water developments the Bureau of Mines in 1963 canvassed mineral producers to determine water use in 1962. Water use by the mineral industry comprises on

    Jan 1, 1966

  • AUSIMM
    Geology of the Southern Finisterre Range: A case history of Modern Arc-Continent Collision

    By Silver EA

    The Finisterre Range on the north coast of Papua New Guinea is the uplifted forearc riagio.n. of a modern arc-continent collision. The core of the range is composed of the P- nisterre Volcanics, a

    Jan 1, 1991

  • AUSIMM
    Underground bulk sampling, uniform conditioning and conditional simulation – unrealistic expectations?

    By I Clark, S C. Dominy

    Bulk sampling programs are typically applied in coarse gold mineralised systems to verify resource/reserve grades. In recent years, there have been controversies surrounding some results of undergroun

    May 9, 2017

  • CIM
    Influence of hydrogen peroxide addition on the corrosion of carbon steel by concentrated sulphuric acid

    By C. M. Davidson, D. J. Drexler

    "Sulphuric acid treated with hydrogen peroxide to destroy organic contaminants could conceivably show increased corrosivity toward carbon steel shipping and storage vessels, caused by the persistence

    Jan 1, 1987

  • SME
    Caterpillar Adds to its Mining Line; New Haul Trucks Fill Out the Surface Mining Portfolio

    By William Gleason

    "Caterpillar is the largest manufacturer of mining equipment in the world. In hundreds of surface mines around the globe, Caterpillar’s flagship 793 haul trucks can be found moving material for copper

    Dec 1, 2018

  • NIOSH
    RI 7151 A Model For Molten Pools In Arc Melting

    By F. W. Wood

    The use of consumable.-electrode arc melting as a production technology is growing. One advantageous feature of this process is that it avoids ingot contamination by soluble crucible materials by empl

    Jan 1, 1968