Search Documents

  • SME
    Seismic Design Measures for the Retrofit of the Claremont Tunnel

    By Bill Cain, David F. Tsztoo, R. John Caulfield, D. Scott Kieffer

    In 1994, the East Bay Municipal Utility District (EBMUD) commenced a system-wide Seismic Improvement Program to protect their facilities from catastrophic damage. A primary focus of this program has b

    Jan 1, 2005

  • ISEE
    Soil Cap Density Distributions Resulting from Buried Explosions in Saturdated Sand

    By L C. Taylor, H U. Lesiste

    This paper describes a method for estimating the density distribution in the soil cap as a function of distance from its top at the time of impact with the target. It provides an estimate of the densi

    Jan 1, 2011

  • AIME
    Minerals Beneficiation - Recent Development of Stability Studies of Steep Rock Slopes in Europe

    By K. W. John, L. Mueller

    The rock mechanics approach to stability problems of steep rock slopes dealt with in this article has particular reference to the concept and methods of analysis developed by the Salzburg, Austria, sc

    Jan 1, 1963

  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • NIOSH
  • AUSIMM
    An Analysis of the Performance of a Ball Mill Rake Classifier Comminution Circuit

    An extensive series of tests was carried out on a ball mill-rake classifier circuit in the New Broken Hill Consolidated Ltd. concentrator. The data were used to develop a mathematical model of the ope

    Jan 1, 1967

  • NIOSH
    IC 8676 Sulfur Content Of Crude Oils

    By M. Carrales

    This Bureau of Mines report presents information on the sulfur content of crude oil in the United States and in some foreign countries. Data are presented for oil produced in 1971 from fields in 26 St

    Jan 1, 1975

  • CIM
    Design Considerations for Mine Waste Management at the Meadowbank Gold Project

    By Cameron J. Clayton

    Cumberland Resources Ltd. is currently planning to develop the Meadowbank Gold Project located some 70 km north of Baker Lake, Nunavut in the eastern Canadian Arctic region. The Meadowbank Gold Projec

    May 1, 2004

  • AUSIMM
    Leaching of Metal Sulphide Concentrates at Atmospheric Pressure Using SO2/O2 Mixtures

    By Matthew I. G

    A new process for leaching zinc sulphide concentrates with gaseous mixtures of SO2 and O2 in aqueous solution is described.The reaction of SO2/O2 with Rosebery, Mt. Isa, Broken Hill and Elura zinc con

    Jan 1, 1981

  • AUSIMM
    Study on Mineral Processing of Refractory Copper-Nickel Ore

    Study on Mineral Processing of Refractory Copper-Nickel Ore

    Sep 13, 2010

  • AUSIMM
    On-line Measurement of Magnetic Susceptibility for Titanium Minerals Processing (07ecfeb8-974f-4465-9d0b-cf00ad6e74cf)

    By P N. Holtham

    Magnetic separation is routinely used in the processing of titaniumminerals, and the efficiency of these operations can be determined bymeasuring the magnetic properties of the process streams. The va

    Jan 1, 2001

  • SAIMM
    Rock Engineering Aspects of a Modified Mining Sequence in a Dip Pillar Layout at a Deep Gold Mine

    By D. F. Malan, Y. Jooste

    "SynopsisScattered mining was practised on Kusasalethu Mine (previously Elandsrand Gold Mine) prior to 1998, but at deeper mining levels it was no longer feasible, since it would have resulted in unac

    Jan 1, 2015

  • NIOSH
    IC 8227 American Standard Safety Rules For Installing And Using Electrical Equipment In And About Coal Mines (M2.1) (Revision Of American Standard Safety Code For Installing And Using Electrical Equipment In Coal Mines, M2.1, 1952) - Introduction (5314e5b6

    Safety rules for installing and using electrical equipment in and about coal mines covered in this information circular supersede those previously included in Bureau of Mines Bulletin 514, issued in 1

    Jan 1, 1964

  • NIOSH
    IC 8227 American Standard Safety Rules For Installing And Using Electrical Equipment In And About Coal Mines (M2.1) (Revision Of American Standard Safety Code For Installing And Using Electrical Equipment In Coal Mines, M2.1, 1952) ? Introduction

    Safety rules for installing and using electrical equipment in and about coal mines covered in this information circular supersede those previously included in Bureau of Mines Bulletin 514, issued in 1

    Jan 1, 1964

  • NIOSH
    RI 7831 Statistical Comparison of the Pulse and Resonance Methods for Determining Elastic Moduli

    By Richard E. Thill

    Elastic wave velocities and moduli were determined by both the pulse and resonance methods in a large number of specimens of St. Cloud Gray Granodiorite and Tennessee marble under the same moisture, t

    Jan 1, 1974

  • AUSIMM
    Structures and Field Relations of Epidiorite Dykes in the Broken Hill Orebody

    A study of literature on the epidiorite dykes which transgress the Broken Hill lode and its wall rocks reveals a considerable diversity of thought regarding the time of emplacement of such dykes. In t

    Jan 1, 1968

  • CIM
    Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper Smelter

    By L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi

    This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel

    Jan 1, 2019

  • CIM
    Monitoring of Highwall Stability at the Dome Open Pit

    By John G. Henning

    The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce

    May 1, 2004

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009