Search Documents

  • SME-ICGCM
    Front abutment effects on supplemental support in predriven longwall equipment recovery rooms

    By Jeffrey M. Listak

    This report describes a study, conducted jointly by BethEnergy Mines Inc. and the Bureau of Mines, to assess the effects of longwall front abutment loading on various supplemental support materials u

    Jan 1, 1989

  • AUSIMM
    Paper No. 127. Presidential Address.

    Taking the Presidential chair of the Australasian Institute of Mining Engineers, my first duty is to thank you for the high honour and position you have conferred on me. A position entailing the highe

    Jan 1, 1903

  • SME-ICGCM
    Recent UK Experience of Working above Previously Extracted Longwalls

    By David Bigby

    In the UK, it is becoming increasingly necessary to open new longwall mining areas above old, abandoned workings. In such cases, strategic and gate roadways must often be driven and maintained acros

    Jan 1, 2007

  • TMS
    Corrosion Processes And Mineral Formation On The Surface Of Bronze Monuments In Urban Environments

    By Olga Frank-Kamenetskaya

    The experimental results of study of atmospheric corrosion processes on Saint-Petersburg bronze monuments surface, received in situ and by means of simulating experiments, have been discussed. Infl

    Jan 1, 2006

  • AUSIMM
    Nucleation and Early Growth Pertinent to Near Net Shape Casting

    By Dippenaar R, Evans T

    Twin-roll continuous casting technology is rapidly approaching commercialisation. Fundamentally different than conventional continuous casting, heat transfer and hence solidification during twin-rol

    Jan 1, 1999

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2005

  • NIOSH
    RI 4193 Oil-Well Reconditioning in Southwestern Pennsylvania, West Virginia, and Southeastern Ohio

    By Bruce F. Grant

    "INTRODUCTION The future of oil production in the part of the Appalachian region included in southwestern Pennsylvania; West Virginia, and southeastern Ohio is directly dependent on the maintenance of

    Feb 1, 1948

  • TMS
    Preliminary Evaluation of Spark Plasma Extrusion

    By K. Morsi

    The interest in spark plasma sintering has been growing considerable over the past few years. This has been brought about by the unique advantages of the process, which include reduced sintering tempe

    Jan 1, 2009

  • SME
    MINExpo INTERNATIONAL 2000 Largest Ever Held

    By Tim O’Neil

    The search for precious metals opened up the American West. And Nevada was right in the heart of this development. In the mid-19th century, prospectors seeking gold roamed the hills of Nevada and di

    Jan 1, 2000

  • AUSIMM
    HYL Self-Reforming Technology: Start-Up and Operation

    By Becerra J. O

    HYL developed a direct reduction process (DR) that does not require a reformer; it is called self-reforming process. Typically, direct reduction processes based on natural gas utilise a reformer un

    Jan 1, 1999

  • ISEE
    Hole Deviations in Mining Operations: Types, Sources and Effects

    By Sam Kangwa, Thomson Sinkala

    Th e re are three basic types of hole deviations in long hole d ri l l i n g , n a m e l y collar i n g , alignment and tr a j e c t o r y dev i a t i o n s . In mining, the accur a cy in drilling has

    Jan 1, 2004

  • IIMP
    Modelos de gestión, cultura organizacional, liderazgo y estructura como parte de la “Calidad Total”

    By Carlos Magno Palacios Arbizu

    La calidad total es la estrategia que busca la mejorar la productividad y eficiencia de los productos que ofrece -en tanto sean reconocidos por este valor-, de forma que genera competitividad en las o

    Sep 12, 2005

  • ISEE
    Effect of Meteorology on Airblast Overpressure

    By Adrian J. Moore, Alan B. Richards

    Airblast overpressure levels can commonly be increased by up to 20 decibels (dBL) by the effects of meteorology, due to inversions and wind shear. Existing atmospheric refraction models can provide a

    Jan 1, 2005

  • DFI
    Seal Slab / Steel Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen

    Jan 1, 2013

  • CIM
    Company Liaison to Company Advocate

    By Walter Smith

    Environmental Quality Committee ?EQC was created in 1995 to facilitate dialogue between industry and northern communities and help build the understanding of the industry in those communities. ?EQ

    Nov 1, 2011

  • SME
    Geotechnical Exploration For The H-3 Highway Trans-Koolau Tunnel

    By Lee W. Abramson, William H. Hansmire

    The H-3 Project is planning, design, and construction of a 10-mile (16 km)-long final segment of new highway that traverses the Koolau mountain range in Oahu. Interstate H-3 traverses North Halawa Val

    Jan 1, 1989

  • CIM
    Characteristics of Wenchuan Earthquake and its Geological Hazard Effects

    By Yun-Jie Wei

    Seismic areas were in the eastern margin of the Qinghai-Tibet plain, whose structures were complicated, mainly composed of Maowen fault, Yingxiu fault and Pengxian-guanxian fault. The rapid rise of th

    May 1, 2009

  • NIOSH
    The Smokeless Combustion Of Coal In Boiler Furnaces - With A Chapter On Central Heating Plants ? Introduction ? The Problem And Its Solution

    By D. T. Randall

    The burning of coal without smoke is a problem that concerns the Government directly because of the advantages of smokeless combustion both in public buildings and on naval vessels. In addition, smoke

    Jan 1, 1918

  • SAIMM
    Stability evaluation for Jinping arch dam by using bifurcation model in 3D FEM analysis

    By C. Steve

    ABSTRACT: In this paper, the stability evaluation and bifurcation criteria are presented for the Jinping arch dam structure. The bifurcation models in failure status of the arch dam are derived from t

    Jan 1, 2003

  • SME
    Virtual Reality Animation Of The Proposed El Dorado Mine In El Salvador Assists Regulators In Reviewing An EIA

    By Troy Holm, Matthew L. Fuller, Frederick H. Earnest

    Virtual Reality Animation Of The Proposed El Dorado Mine In El Salvador Assists Regulators In Reviewing An EIA

    Jan 1, 2005