Search Documents

  • SAIMM
    Kinetic gold leach monitoring including cyanide speciation - Synopsis

    By P. W. Lotz

    Traditionally, bottle roll tests have been used to optimize the extraction process for best gold extraction and recovery. Such tests typically involve exposing the ore to defined reagent concentration

    Jan 1, 2009

  • SAIMM
    Rockburst Prediction - Case Studies Using A Kinematics Of Failure Approach

    By W. de Beer

    We present aspects of one of several ongoing case studies used in the development of prediction techniques for major seismic instabilities. The current investigation centres on accelerated coseismic d

    Jan 1, 1998

  • SAIMM
    Topical Interest - Increasing Black Representation In Mining Engineering: The Need For A New Approach

    By Jeffrey C. Hillman

    The need to recruit locally produced engineers by the South African Mining Industry led to the Engineering Faculty at the University of the Witwatersrand developing a number of academic bridging initi

    Jan 1, 1996

  • AUSIMM
    Evaluation of Crown Pillar Burst Potential in Cut-and-Fill Vein Mining

    By J M. Marwan, B Tang

    Strain-type rockbursts, or strainbursts, are characterised by a localised violent failure. Their cause is attributed primarily to the sudden release of strain energy, which accumulates in a volume of

    Jan 1, 2001

  • AUSIMM
    The Development of AustraliaÆs Mineral Resources

    The title of this address was selected before I had an opportunity to consider in detail the matters that I would like to discuss. Accordingly, I chose a very broad subject-so broad indeed that it wou

    Jan 1, 1944

  • NIOSH
    Workplace Stress

    YOUR mom was right …count to 10. Most workers today report that they find their jobs stressful. Miners, in particular, are faced with hazardous and changing environments. Every shift provides differen

  • AUSIMM
    Optimising Metallurgy at the Planning Stage to Minimise Environmental Impact - A Feedback Loop from Geochemical Waste Characterisation

    By P Mulvey

    "Currently mine process studies and geochemical waste characterisation are considered as two interdependent studies, necessary for the development of the mine and inclusion in the environmental impact

    Jul 15, 2013

  • AUSIMM
    Innovative Treatment of Gold Mine Water for Sustainable Benefit ù Processes and Case Studies

    Gold mines produce unique water treatment requirements. This paper focuses on case studies of innovative processes used for treatment of water resulting from gold mining and processing. The case studi

    Jan 1, 2007

  • AUSIMM
    Systems and Protocols of Geological Information Management at Telfer Gold Mine, Western Australia

    By G R. Howard, G Back

    Management of information systems for data collection is essential to maintain data integrity and continuity, and manage loss control on a large world-class mine such as Telfer Gold Mine. This paper a

    Jan 1, 2000

  • CIM
    On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’

    By Phillip Cancilla, Daniel Roy, Frank Rosenblum

    "The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti

    Jan 1, 2001

  • AUSIMM
    Precipitation of Gold and Silver in Cyanide Solutions by Carbon

    THIS paper is the outcome of experiments carried on and experience gained. at the Waihi-Paeroa Gold Extraction Company's tailings plant at Waihi, New Zealand. The plant was erected to treat accum

    Jan 1, 1912

  • SAIMM
    Prediction Of SiO2-Al2O3-Croxcomplex Inclusions In Steel Containing 16 Per Cent Cr-Si-Al-Mn

    By P. C. -H. Rhee, H. -G. Lee, J. -H. Choi, D. S. Kim, S. -B. Lee

    In order to predict the composition of inclusions and to ascertain a method to prevent inclusions from forming in liquid Fe-16 mass Cr alloy, a thermodynamic database was developed through a quantitat

    Jan 1, 2004

  • AUSIMM
    Real-Time Integration of Mining and Metallurgical Information for Efficient Use of Energy and Water

    Real-Time Integration of Mining and Metallurgical Information for Efficient Use of Energy and Water

    Sep 13, 2010

  • DFI
    Pile Load Tests

    Case I- Timber Pile Test- 4 pages describe the pile driving record, the pile load test and the boring log. Case II- 24 inch square prestressed concrete pile-5 pages give details about the pile dri

    Jan 1, 1988

  • SME
    Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island

    By Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert

    Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his

    Jan 1, 2007

  • NIOSH
    OFR-110-77 Development Of Winch-Pulled Dozer Blade Equipment System

    Study to develop a new and more cost effective equipment system, incorporating a winch-pulled dozer blade, for leveling spoil and performing reclamation of area strip mines.

    Jan 1, 1975

  • AIME
    Part X - Communications - Discussion of "Observations on the Orientation Distribution and Growth of Large Grains near (110) [001] Orientation in Silicon-Iron Strip "*

    By C. G. Dunn

    James, Jones, and Leak (JJL) conclude that growth-rate and orientation-distribution data obtained in a steep thermal gradient should be used with caution to account for isothermally produced recrystal

    Jan 1, 1967

  • NIOSH
    OFR-78-77 Analysis Of Noncoal Mine Atmospheres

    By Sheridan J. Rodgers

    The quantity and behavior of gases in metal and nonmetal mines were monitored to provide background information on feasibility of incipient fire detection systems. Monitoring was conducted during work

    Jan 1, 1976

  • NIOSH
    OFR-122(4)-80 Alumina Process Feasibility Study And Preliminary Plot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume IV - Appendix B - General Specification - Section 1 - Building Description

    1.0 Control House (DWG. NO. 56-401-G) - 1.1 Physical Description The Control House is a single story, 2728 square foot building with an adjacent transformer yard. A four foot overhang provides shad

    Jan 1, 1979

  • SME
    Development of Cyanide Leaching Processs For Small High Grade Gold and Silver Deposits

    By Michael Harris, David Mosch

    The numerous small high grade gold and silver deposits of the Front Range Mineral Belt have been uneconomical because of the high costs of mill construction, transportation, and smeltering. Processing

    Jan 1, 1987